•

•


•

•

•

•
•
                •
            •        •
        •           •
•                    •
    •                 •
•
•
•
•
Internet




      PSTN

     Mobile




•
•

•
•
•
•
    •



    •

    •

•
•
WiMAX                                                       HSPA
Total Cost of         2300             700               ...
•


•

•
•
•

•
•
•
•
•
•
•
•
•
•
•
•


•
•
•
•
•
•




•




    
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Introduction To Wirelss Works   Net Works September 2010
Upcoming SlideShare
Loading in...5
×

Introduction To Wirelss Works Net Works September 2010

367

Published on

WirelessWorks Solutions - Network transition and future shaping strategies WiMAX - HSPA+, LTE --> IMT Advanced... We Walk The Talk

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
367
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
11
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Introduction To Wirelss Works Net Works September 2010

  1. 1. • • • • • •
  2. 2. • • • • • • • • • •
  3. 3. • • • •
  4. 4. Internet PSTN Mobile • • • • •
  5. 5. • • • • • •
  6. 6. WiMAX HSPA Total Cost of 2300 700 Total 1900 850 Total Ownership CapEx WiMAX CapEx HSPA Network CapEx $ 2,284,360.00 $ 2,284,360.00 $ 1,900,000.00 $ 1,900,000.00 Site CapEx $ 3,481,965.00 $ 1,871,925.00 $ 5,353,890.00 $ 5,333,500.00 $ 3,785,000.00 $ 9,118,500.00 CPE CapEx $ 5,250,000.00 $ 12,670,000.00 $ 17,920,000.00 $ 4,800,000.00 $ 3,675,000.00 $ 8,475,000.00 OpEx - 3 year WiMAX OpEx - 3 year HSPA Network OpEx $ 346,188.00 $ 346,188.00 $ 570,000.00 $ 570,000.00 Site OpEx $ 3,741,030.00 $ 1,976,850.00 $ 5,717,880.00 $ 6,351,000.00 $ 4,298,700.00 $ 10,649,700.00 CPE OpEx $ 315,000.00 $ 1,372,350.00 $ 1,687,350.00 $ 288,000.00 $ 455,700.00 $ 743,700.00 Total - 3 Year US$ Total - 3 Year US$ $ 15,418,543.00 $ 17,891,125.00 $ 33,309,668.00 $ 19,242,500.00 $ 12,214,400.00 $ 31,456,900.00 %Network 17% 8% 13% 8% %Site 47% 22% 33% 61% 66% 63% %CPE 36% 78% 59% 26% 34% 29%
  7. 7. • • • • • • •
  8. 8. • • • • • • • • • • • • • • •
  9. 9. • • 
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×