Hallin Marine Subsea International Plc<br />
Capability<br />INTEGRATED SUBSEA  CONTRACTOR<br />“Professional & Cost Effective Subsea Solutions through whole of Field ...
Specialist Engineering
Subsea Construction
IRM</li></ul>RESOURCES (In House)<br /><ul><li>Subsea Operations Vessels
Saturation Diving Systems
ROVs
Engineering company
Manufacturing company
Project Personnel
Operations bases world wide</li></li></ul><li>CLIENT BASE<br />Section title here<br />2007 Report & Accounts<br />17 Octo...
Offices & Support Facilities World Wide<br />Section title here<br /><ul><li>  Hallin West Divisn</li></ul>Aberdeen<br /><...
 EAST GROUP REGION - OPERATIONS<br />22<br />Hallin Marine East Operating Group <br />	SE Asia<br />	India<br />	Australia...
Operational Resources<br />2007 Report & Accounts<br />
Marine Vessels<br />Section title here<br />A BALANCED FLEET OF MARINE VESSELS ARE AN INTEGRAL PART OF OUR BUSINESS<br />2...
   Long Term charter vessels			-  As required for a balanced fleet
   Short Term chartered vessels 		-  Project Specific Operations Vessels</li></li></ul><li>Ullswater  / Windermere<br />UL...
Sanko Angel<br />DP2 SUBSEA OPERATIONS VESSEL<br />76m LOA, 20m Beam<br />700m2 Deck Space,<br />130 Man Accommodation<br ...
Seacor Penrith<br />DP2 SUBSEA OPERATIONS VESSEL<br />8,000Hp <br />70m LOA, 16m Beam<br />500m2 Deck Space,<br />52 Man A...
Diving Systems<br />2007 Report & Accounts<br />
Sat 06<br />ABS CLASSED - 12 MAN / 3 MAN BELL / 200 METRE<br />Section title here<br />COMPLETED June 2007 (Hallin Marine)...
Sat 08<br />ABS CLASSED - 12 MAN / 3 MAN BELL / 200 METRE<br />Section title here<br />COMPLETED October 2007 (Hallin Mari...
Air Diving Systems<br />AIR DIVING SYSTEMS - 50 METRE (Surface Supplied)<br />Section title here<br />2007 Report & Accoun...
ROVs<br />2007 Report & Accounts<br />
ROVs<br />Section title here<br />Construction Class to Inspection / Eyeball<br />Full Range of ROV Systems<br />Quantum C...
  Actively investing to expand fleet</li></ul>Falcon Eyeball ROV<br />
Quantum Construction Class ROV<br />Section title here<br />2007 Report & Accounts<br /><ul><li>Manufacturer – SMDH, Newca...
125HP Hydraulic ROV
3000 metre depth rated
Tether Management System (TMS)
350 Kg Payload & 3T Thru Frame Lift
Upcoming SlideShare
Loading in …5
×

Hallin Marine

3,533 views

Published on

Corporate Profile

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
3,533
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
2
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Hallin Marine

  1. 1. Hallin Marine Subsea International Plc<br />
  2. 2. Capability<br />INTEGRATED SUBSEA CONTRACTOR<br />“Professional & Cost Effective Subsea Solutions through whole of Field Life”<br />Section title here<br />2007 Report & Accounts<br /><ul><li>FEED
  3. 3. Specialist Engineering
  4. 4. Subsea Construction
  5. 5. IRM</li></ul>RESOURCES (In House)<br /><ul><li>Subsea Operations Vessels
  6. 6. Saturation Diving Systems
  7. 7. ROVs
  8. 8. Engineering company
  9. 9. Manufacturing company
  10. 10. Project Personnel
  11. 11. Operations bases world wide</li></li></ul><li>CLIENT BASE<br />Section title here<br />2007 Report & Accounts<br />17 October 2008<br />Prospect capability - brief summary<br />3<br />
  12. 12. Offices & Support Facilities World Wide<br />Section title here<br /><ul><li> Hallin West Divisn</li></ul>Aberdeen<br /><ul><li> Prospect HQ</li></ul>Derby - Prospect <br />Houston<br />Malton - Hallin Robotics<br />Singapore<br />Jakarta<br />Perth<br />2008 Subsea & Offshore Contract Locations<br />Operating Divisions & Regional Offices<br />
  13. 13. EAST GROUP REGION - OPERATIONS<br />22<br />Hallin Marine East Operating Group <br /> SE Asia<br /> India<br /> Australia<br /> USA<br />7<br />8<br />2<br />21<br />16<br />17<br />5<br />18<br />6<br />12<br />19<br />15<br />10<br />20<br />3<br />1<br />4<br />13<br />9<br />11<br />14<br />
  14. 14. Operational Resources<br />2007 Report & Accounts<br />
  15. 15. Marine Vessels<br />Section title here<br />A BALANCED FLEET OF MARINE VESSELS ARE AN INTEGRAL PART OF OUR BUSINESS<br />2007 Report & Accounts<br /><ul><li> Hallin owned Subsea Operations Vessels - Purpose built and Cost Effective
  16. 16. Long Term charter vessels - As required for a balanced fleet
  17. 17. Short Term chartered vessels - Project Specific Operations Vessels</li></li></ul><li>Ullswater / Windermere<br />ULLSWATER<br />DP2 Subsea Operations Vessels<br />78m LOA, 20m Beam<br />700m2 Deck Space<br />15 Man Saturation Diving System<br />CROV Work Class ROV<br />50T Marine Crane<br />125 Man Accommodation<br />Moonpool<br />Helideck (Super Puma) <br />Section title here<br />2007 Report & Accounts<br />WINDERMERE<br />Technical improvements<br />80M LOA<br />Diesel Electric<br />Voith Schneider Propellers<br />1500m AHC 50T Crane<br />
  18. 18. Sanko Angel<br />DP2 SUBSEA OPERATIONS VESSEL<br />76m LOA, 20m Beam<br />700m2 Deck Space,<br />130 Man Accommodation<br />50T Marine Crane <br />Moonpool<br />Helideck<br />Portable Saturation Diving System<br />12 Man / 200m / HRC<br />Optional: CROV 100Hp Work Class System<br />Section title here<br />2007 Report & Accounts<br />
  19. 19. Seacor Penrith<br />DP2 SUBSEA OPERATIONS VESSEL<br />8,000Hp <br />70m LOA, 16m Beam<br />500m2 Deck Space,<br />52 Man Accommodation<br />20T / 200 msw Offshore Crane (Constant Tension)<br />Section title here<br />2007 Report & Accounts<br />
  20. 20. Diving Systems<br />2007 Report & Accounts<br />
  21. 21. Sat 06<br />ABS CLASSED - 12 MAN / 3 MAN BELL / 200 METRE<br />Section title here<br />COMPLETED June 2007 (Hallin Marine)<br />ABS Class + A1 Diving System<br />IMCA Compliant<br />200 Metre Rated<br />12 Man Capacity<br />3 Man Bell<br />HRC<br />Diver Gas Reclaim <br />2007 Report & Accounts<br />
  22. 22. Sat 08<br />ABS CLASSED - 12 MAN / 3 MAN BELL / 200 METRE<br />Section title here<br />COMPLETED October 2007 (Hallin Marine)<br />ABS Class + A1 Diving System<br />IMCA Compliant<br />200 Metre Rated<br />12 Man Capacity<br />3 Man Bell<br />HRC<br />Diver Gas Reclaim<br />Saturation Diving System <br />2007 Report & Accounts<br />
  23. 23. Air Diving Systems<br />AIR DIVING SYSTEMS - 50 METRE (Surface Supplied)<br />Section title here<br />2007 Report & Accounts<br />WORK BOAT MOUNTED SRP AIR DIVING SYSTEMS<br />
  24. 24. ROVs<br />2007 Report & Accounts<br />
  25. 25. ROVs<br />Section title here<br />Construction Class to Inspection / Eyeball<br />Full Range of ROV Systems<br />Quantum Construction Class ROV<br />Surface to 3000 Metres<br />Quasar Work Class ROV<br />Crov Low Cost Work Class ROV <br />Total 19 ROV Systems<br />Lynx Inspection ROV<br /><ul><li> Tooling inventory & in-house engineering
  26. 26. Actively investing to expand fleet</li></ul>Falcon Eyeball ROV<br />
  27. 27. Quantum Construction Class ROV<br />Section title here<br />2007 Report & Accounts<br /><ul><li>Manufacturer – SMDH, Newcastle, UK
  28. 28. 125HP Hydraulic ROV
  29. 29. 3000 metre depth rated
  30. 30. Tether Management System (TMS)
  31. 31. 350 Kg Payload & 3T Thru Frame Lift
  32. 32. Easy Integration with Hydraulic Tools Packages </li></li></ul><li>Quasar Compact Work Class ROV<br /><ul><li>Manufacturer – SMDH, Newcastle, UK
  33. 33. 100HP Hydraulic ROV
  34. 34. 2000 metre depth rated
  35. 35. Tether Management System (TMS)
  36. 36. 160 Kg Payload & 1T Thru Frame Lift
  37. 37. Easy Integration with Hydraulic Tools Packages </li></ul>Section title here<br />2007 Report & Accounts<br />
  38. 38. CROV Work Class ROV<br />Section title here<br />2007 Report & Accounts<br /><ul><li>Manufacturer - Hallin Marine, Singapore
  39. 39. 100HP Hydraulic ROV
  40. 40. 1000 metre depth rated - Free Swimming
  41. 41. 160 Kg Payload & 1T Thru Frame Lift
  42. 42. Easy Integration with Hydraulic Tools </li></li></ul><li>Panther XT / Lynx / Falcon Inspection Class ROV<br />Section title here<br />2007 Report & Accounts<br />Built by Saab Seaeye in UK<br />Inspection Class ROV<br />Electric Power<br />34Kg Payload<br />Inspection / Survey Tooling Options<br />A-Frame LARS <br />1500m/1000m/350m depth rated<br />
  43. 43. Previous Project Examples<br />2007 Report & Accounts<br />
  44. 44. Previous Project Examples<br />Section title here<br />2007 Report & Accounts<br />
  45. 45. Offshore Subsea Construction Project<br />Project: Huizhou 19-3/2/1<br />Work Scope: <br />DPDSV with Saturation Diving and ROV Services for metrology and spool piece installation, power cable installation, Flexible Flowlines and Risers to wellheads – <br />Client: Hyundai / CACT<br />Location: Offshore Southern China<br />Section title here<br />2007 Report & Accounts<br />
  46. 46. FPSO Risers & Flowlines<br />Project: Prosafe Riser Replacement<br />Work Scope: <br /> DSV, Engineering and Replacement of Riser System.<br />Client:Prosafe <br />Location: PY#3 Field. Offshore East coast India <br />Section title here<br />2007 Report & Accounts<br />
  47. 47. Emergency Call-out Project<br />Project: Modec Elang - Heat Exchanger Repair<br />Work Scope: <br /> DSV and Saturation Diving System. Engineer and execute project to, Recover, Repair and re-install a 75T subsea Heat Exchanger in 110m water depth .<br />Client:Modec (Mitsui Oil)<br />Location: Australia / East Timor JDA<br />Section title here<br />2007 Report & Accounts<br />
  48. 48. ROV - Engineering & Project Execution<br />Project: Freespan Correction<br />Work Scope:<br />Pipeline Free-span Correction using DP Support Vessel & Workclass ROV. Total 58 x spans corrected on Main Gas Export Pipeline in 100m Water Depth. <br />Client: Premier Oil<br />Location: Andaman Sea<br />Section title here<br />2007 Report & Accounts<br />
  49. 49. FPSO Risers & Flowlines<br />Section title here<br />2007 Report & Accounts<br />Project: Rang Dong Field Installation <br />Scope: FSO Riser Installation <br />Client:Modec<br />Location: Rang Dong Field, Offshore Vietnam <br />
  50. 50. FPSO Risers & Flowlines<br />Section title here<br />2007 Report & Accounts<br />Project: Rang Dong Field Installation <br />Scope: FSO Riser Installation <br />Client:Modec<br />Location: Rang Dong Field, Offshore Vietnam <br />
  51. 51. Construction Barge Support<br />PROVISION OF DIVIING EQUIPMENT & PERSONNEL<br />Clients include:<br /><ul><li> J Ray McDermott
  52. 52. Hyundai Heavy Industries
  53. 53. Saipem
  54. 54. Allseas
  55. 55. Clough</li></ul>Section title here<br />2007 Report & Accounts<br />
  56. 56. SUMMARY<br />Section title here<br />A proven Subsea work history<br />High standards of HSE<br />Competent personnel<br />Quality equipment<br />Safe, professional and cost effective.<br />2007 Report & Accounts<br />
  57. 57. Hallin Marine Subsea International Plc<br />For more information visitwww.hallinmarine.com<br />

×