Software cycles
Upcoming SlideShare
Loading in...5
×
 

Software cycles

on

  • 317 views

 

Statistics

Views

Total Views
317
Views on SlideShare
317
Embed Views
0

Actions

Likes
0
Downloads
4
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Software cycles Software cycles Presentation Transcript

  • Waterfall1. History of water fall model.2. Features of water fall model.3. Phase of water fall model.4. Brief description of phases.5. Advantages.6. Disadvantages.
  • History of waterfall1)The first formal description of the waterfall model isoften cited as a 1970 article by Winston W. Royce2)Royce did not use the term "waterfall" in this article.3)Royce presented this model as an example of aflawed, non-working model.
  • Features of waterfall model1. A Water Fall Model is easy to flow.2. It can be implemented for any size of project.3. Every stage has to be done separately at the righttime so you cannot jump stages.4. Documentation is produced at every stage of awaterfall model allowing people to understandwhat has been done.5. Testing is done at every stage.
  • Waterfall model
  • Phases of waterfall modelWaterfall model has 5 different phases, Which arefollowing.1. Requirement gathering and Analysis.2. Design.3. Coding.4. Testing.5. Maintenance.
  • Brief description of phase1) Requirement gathering andAnalysis. This is the first phase of waterfall model which includes ameeting with the customer to understand his requirements. This is the most crucial phase as any misinterpretation atthis stage may give rise to validation issues later. The software definition must be detailed and accurate withno ambiguities. It is very important to understand the customerrequirements and expectations so that the end productmeets his specifications.
  • Brief description of phase Requirement gathering and Analysisphase the basic requirements of thesystem must be understood by softwareengineer, who is also called ANALYST. All this requirements are then welldocumented and discussed further withthe customer for reviewing.
  • Brief description of phase2) Design. The customer requirements are broken down into logicalmodules for the ease of implementation. Hardware andsoftware requirements for every module are Identifiedand designed accordingly. Also the inter relation between the various logicalmodules is established at this stage. Algorithms anddiagrams defining the scope and objective of each logicalmodel are developed. In short, this phase lays a fundamental for actualprogramming and implementation
  • Brief description of phaseIt is a intermediate step between requirementsanalysis and coding.Design focuses on program attribute such as-1) Data Structure.2) Software Architecture.3) Algorithm Detailsetc…….The requirements are translated in some easy torepresent form using which coding can be doneeffectively and efficiently.The design needs to be documented for further use.
  • Brief description of phase3) Coding. Coding is a step in which design is translated into machine-readable form. If design is done in sufficient detail then coding can be done effectively. Programsare created in this phase. In this phase all software divided into small module then after doing coding for thatsmall module rather than do coding whole software. According to design programmers do code and make class and structure of wholesoftware.
  • Brief description of phase4) Testing. In this stage, both individual components and theintegrated whole are methodically verified to ensure thatthey are error-free and fully meet the requirementsoutlined in the first step. In this phase testing whole software into two parts 1)HARDWARE & 2) SOFTWARE. Type of testing is 2-types1) Inside test.2) Outside test.
  • Brief description of phase5) Maintenance. This is the final phase of the waterfall model, in which thecompleted software product is handed over to the client afteralpha, beta testing. After the software has been deployed on the client site, it is theduty of the software development team to undertake routinemaintenance activities by visiting the client site. If the customer suggests changes or enhancements thesoftware process has to be followed all over again right fromthe first phase i.e requirement analysis.
  • Brief description of phaseThe usually the longest stage of the software. In thisphase the software is updated to:a) Meet the changing customer needsb) Adapted to accommodate changes in the externalenvironmentc) Correct errors and oversights previouslyundetected in the testing phasesd) Enhancing the efficiency of the softwareObserve that feed back loops allow for correctionsto be incorporated into the model.
  • Advantages of waterfall model The water fall model is easy to implementation.For implementation of small systems water fallmodel is use full.The project requires the fulfillment of onephase, before proceeding to the next.It is easier to develop various software through thismethod in short span of time.
  • Disadvantages of waterfall model The requirement analysis is done initially and sometimes it isnot possible to state all the requirement explicitly in thebeginning. The customer can see working model of the project only atthe end. If we want to go backtrack then it is not possible in this model. It is difficult to follow the sequential flow in softwaredevelopment process.
  • Spiral model
  • •The spiral model was defined by Barry Boehm in1988 .•It was not the first model to discuss iterativedevelopment, but it was the first model to explainwhy the iteration matters.•the iterations were typically 6 months to 2 yearslong.History
  • When to use The spiral Model• The user has experience to refine therequirements .• Some parts of the implementation maydepend on future technology• New user requirements are anticipated butnot yet known• Some user requirements may be significantlymore difficult to meet than others, and it isdecided not to allow them to delay a usabledelivery
  • Spiral Model VS Waterfall Model• Risk factor is considered in the Spiral Model butin water fall Model it is not considered.• In Waterfall the requirements are freezed butthis not happens in the Spiral Model.• Waterfall Model is linear sequential modelwhere Spiral Model works in loop.• Spiral Model is costly as Risk factor is covered.• In spiral model there is a better communicationbetween developer and customer.
  • Spiral Model VS prototype model• number of phases of spiral model is not fixed-whereas in prototype model number of phasesis fixed .• Risk factor is considered in the Spiral Model butin water fall Model it is not considered• Spiral model includes many prototype models• Spiral model is used when requirement is notclear and needs conformation while in prototypemodel requirement is clear but complex• In spiral model customer interaction continousto move together. in other hand prototype modelcustomer interaction needs till the prototype is
  • Quadrant 1: Determine objectives,alternatives, and constraints:Spiral Model DescriptionObjectives: performance,hardware/software interface , functionality,etc.Alternatives: design, reuse, buy, etc.constraints : imposed on technology, cost,schedule, support, and risk.Once the system„s objectives, alternatives,and constraints are understood, Quadrant2 (Evaluate alternatives, identify, andresolve risks) is performed
  • Quadrant 2: Evaluatealternatives, identify, resolve risks:The focus here is on risk study.Each alternative isinvestigated and prototypedto reduce the risk associatedwith the developmentdecisions• Study alternatives relative toobjectives and constraints• Identify risks (lack ofexperience, new technology,tight schedules, poor process,etc.• Resolve risks (evaluate if moneycould be lost by continuingsystem development
  • Quadrant 3: Develop, verify, next-levelproduct.Typical activities Create a design Review design Develop code Inspect code Test product
  • Quadrant 4: Plan next phases.Typical activities• Develop project plan• Develop configuration managementplan• Develop a test plan• Develop an installation plan
  • Summary of Spiral steps:• Each successive phase in the project as a new spiral includes afour steps or phases.• Software requirements in the design are gradually developedthrough a series of prototypes.• The exact number of spirals necessary for the project isflexible and depends on the number of prototypes needed toreach a satisfactory design.• Since each face requires a certain level of commitment acumulative cost of the project represented by the width of thespiral• Once a satisfactory design is reached the software isconstructed according the final three process of the waterfallmodel (Programming – Integration-Delivery)
  • Advantages• Provides early indication of insurmountable risks, withoutmuch cost• Users see the system early because of rapid prototypingtools• Critical high-risk functions are developed first• The design does not have to be perfect• Users can be closely tied to all lifecycle steps• Early and frequent feedback from users• Cumulative costs assessed frequently
  • Disadvantages Time spent for evaluating risks too large for small orlow-risk projects Time spent planning, resetting objectives, doing riskanalysis and prototyping may be excessive The model is complex Risk assessment expertise is required Spiral may continue indefinitely Developers must be reassigned during non-development phase activities May be hard to define objective, verifiable milestonesthat indicate readiness to proceed through the nextiteration
  • Scrum
  • • Scrum is an agile process that allows us to focus ondelivering the highest business value in the shortest time.• It allows us to rapidly and repeatedly inspect actualworking software (every two weeks to one month).• The business sets the priorities. Teams self-organize todetermine the best way to deliver the highest priorityfeatures.• Every two weeks to a month anyone can see real workingsoftware and decide to release it as is or continue toenhance it for another sprint.Scrum in 100 words
  • Scrum has been used by:•Microsoft•Yahoo•Google•Electronic Arts•High Moon Studios•Lockheed Martin•Philips•Siemens•Nokia•Capital One•BBC•Intuit•Intuit•Nielsen Media•First American Real Estate•BMC Software•Ipswitch•John Deere•Lexis Nexis•Sabre•Salesforce.com•Time Warner•Turner Broadcasting•Oce
  • Scrum has been used for:Commercial softwareIn-house developmentContract developmentFixed-price projectsFinancial applicationsISO 9001-certifiedapplicationsEmbedded systems24x7 systems with 99.999%uptime requirementsthe Joint Strike FighterVideo game developmentFDA-approved, life-criticalsystemsSatellite-control softwareWebsitesHandheld softwareMobile phonesNetwork switching applicationsISV applicationsSome of the largest applications inuse
  • CharacteristicsSelf-organizing teamsProduct progresses in a series of month-long “sprints”Requirements are captured as items in alist of “product backlog”No specific engineering practicesprescribedUses generative rules to create an agileenvironment for delivering projectsOne of the “agile processes”
  • ScrumCancelGift wrapReturnSprint2-4 weeksReturnSprint goalSprintbacklogPotentially shippableproduct incrementProductbacklogCouponsGift wrapCouponsCancel24 hours
  • Putting it all together
  • Sprints• Scrum projects make progress in a series of“sprints”• Analogous to Extreme Programming iterations• Typical duration is 2–4 weeks or a calendar monthat most• A constant duration leads to a better rhythm• Product is designed, coded, and tested during thesprint
  • No changes during a sprint• Plan sprint durations around how long you can committo keeping change out of the sprintChange
  • Scrum framework•Product owner•ScrumMaster•TeamRoles•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meetingCeremonies•Product backlog•Sprint backlog•Burndown chartsArtifacts
  • Scrum framework•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meetingCeremonies•Product backlog•Sprint backlog•Burndown chartsArtifacts•Product owner•ScrumMaster•TeamRoles
  • Product owner• Define the features of the product• Decide on release date and content• Be responsible for the profitability of the product(ROI)• Prioritize features according to market value• Adjust features and priority every iteration, asneeded• Accept or reject work results
  • The ScrumMaster• Represents management to the project• Responsible for enacting Scrum valuesand practices• Removes impediments• Ensure that the team is fully functionaland productive• Enable close cooperation across allroles and functions• Shield the team from externalinterferences
  • The team• Typically 5-9 people• Cross-functional:• Programmers, testers, user experiencedesigners, etc.• Members should be full-time• May be exceptions (e.g., database administrator)
  • The team• Teams are self-organizing• Ideally, no titles but rarely a possibility• Membership should change only betweensprints
  • •Product owner•ScrumMaster•TeamRolesScrum framework•Product backlog•Sprint backlog•Burndown chartsArtifacts•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meetingCeremonies
  • Sprint planning• Team selects items from the product backlogthey can commit to completing• Sprint backlog is created• Tasks are identified and each is estimated (1-16hours)• Collaboratively, not done alone by the ScrumMaster• High-level design is consideredAs a vacation planner, I wantto see photos of the hotels. Code the middle tier (8 hours)Code the user interface (4)Write test fixtures (4)Code the foo class (6)Update performance tests (4)
  • The daily scrum• Parameters• Daily• 15-minutes• Stand-up• Not for problem solving• Whole world is invited• Only team members, ScrumMaster, product owner, cantalk• Helps avoid other unnecessary meetings
  • Everyone answers 3questions• These are not status for the ScrumMaster• They are commitments in front of peersWhat did you do yesterday?1What will you do today?2Is anything in your way?3
  • The sprint demo• Team presents what it accomplished during thesprint• Typically takes the form of a demo of newfeatures or underlying architecture• Informal• 2-hour prep time rule• No slides• Whole team participates• Invite the world
  • Sprint retrospective• Periodically take a look at what is and is not working• Typically 15–30 minutes• Done after every sprint• Whole team participates• ScrumMaster• Product owner• Team• Possibly customers and others
  • •Product owner•ScrumMaster•TeamRolesScrum framework•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meetingCeremonies•Product backlog•Sprint backlog•Burndown chartsArtifacts
  • Product backlog• The requirements• A list of all desired work onthe project• Ideally expressed suchthat each item has valueto the users or customersof the product• Prioritized by the productowner• Reprioritized at the start ofeach sprintThis is theproduct backlog
  • A sample product backlogBacklog item EstimateAllow a guest to make a reservation 3As a guest, I want to cancel areservation.5As a guest, I want to change the dates ofa reservation.3As a hotel employee, I can run RevPARreports (revenue-per-available-room)8Improve exception handling 8... 30... 50
  • A sprint burndown chartHours
  • Prototyping