Your SlideShare is downloading. ×
Msexcel 11 Npv Irr Feasibility
Msexcel 11 Npv Irr Feasibility
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Msexcel 11 Npv Irr Feasibility

507

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
507
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Disc Rate 15 Project A Project B -500 -500 420 780 420 780 420 780 420 780 420 780 NPV (29.50) (28.00) IRR Err:523 Err:523 Feasible Project : B
  • 2. Project A Project B -1000 -1000 420 420 410 430 300 520 250 620 0 630 -100 650 IRR Err:523 Err:523 NPV 15% (60.75) (60.75) NPV14% (64.67) (64.66) NPV 13% (69.13) (69.11) NPV12% (74.24) (74.22) NPV 11% (80.16) (80.14) NPV 10% (87.11) (87.08) Feasible Project: B Feasible Projects 700 600 Discount Rate: 500 15 14 400 13 300 Output 12 Column B 200 11 Column C 10 100 0 -100 -200 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Years

×