• Save
Cv presentation jun13
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Cv presentation jun13

  • 1,469 views
Uploaded on

This presentation is a visual demonstration of my experience. ...

This presentation is a visual demonstration of my experience.
It contains photographs of some of the exciting projects I have had the privilege of being involved in and details of some of the employers I have had the pleasure to work for.
It also shows the durations I have spent in each of the various categories.

More in: Career , Business , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,469
On Slideshare
1,434
From Embeds
35
Number of Embeds
2

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 35

http://www.linkedin.com 26
https://www.linkedin.com 9

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Iain R M CameronPresentation of ProfessionalExperience
  • 2. Introduction• This presentation is an attempt to demonstrate myexperience visually and pictorially.• I have apportioned my experience into a number ofcategories as shown on the following slide.
  • 3. Experience Categories• Project Management• Construction Management• Business Development• Contract Administration• Highways and Transportation• Rail• Water and Drainage• Structures• Health & Safety• Environmental• Education and Training
  • 4. Employment List• The following slides show details of my employmentlisted chronologically, starting from the present.• Each employment period is broken down into time spenton the various experience categories.
  • 5. Employment ListPeriod Duration(mths)Employer Post Projects ExperienceCategory mthsSept 12 –To date9ParsonsBrinckerhoff, Doha,QatarConstruction ManagerLocal Roads &DrainageProgrammeConstruction Management 9Aug 11 –Jun 1211CPG – Global,Auckland, NZTransport Sector Manager -NZRoads, Rail,Marine &AirportsProjectsHighways & Transportation 11Project Management 6Business Development 8Jul 10 –Jul 1112 QPM Doha, Qatar Infrastructure Director Lusail Light RailNetwork BidHighways & Transportation 9Contract Administration 6Business Development 9Feb 09 –Jul 1018KiwiRail, Auckland,NZProject Interface ManagerNew Lynn RailTrenchRail 18Project Management 18Contract Administration 5Nov 07 –Nov 0812EC Harris, AbuDhabi, UAEService Delivery TeamLeader (Snr ProjectManager)Shopping Malland HotelDevelopment,Abu DhabiProject Management 12Contract Administration 6Business Development 6Oct 06 -Nov 0713Hyder Consulting,Abu Dhabi, UAEConstruction DirectorResponsible forover 200 sitestaff – Projectsincl. 60 storeytowers, marineworks,infrastructureworksConstruction Management 12Project Management 10Contract Administration 6Health & Safety 6Environmental 3Education & Training 3Jan 06 -Oct 0610MWH, Hawkes Bay,NZGroup Manager - LocalGovernmentResponsible forteams involvedininfrastructureworks andenvironmentalProject Management 10Contract Administration 5Water & Drainage 6Environmental 4Business Development 5
  • 6. Elwood Engineering Services Ltd – Own Ltd Company• Between Oct 1991 (on returning to Scotland from the Middle East)and January 2006 when I took up the post in New Zealand I ran myown Consultancy (EES Ltd). I generally contracted my servicesout to one major client at a time (as listed below). Theseappointments were generally of a fairly senior nature withsignificant staff management responsibility. The length of time foreach of these posts was very much dependent on the clients’staffing needs and policy.• I also carried out work on an ongoing basis for a considerablenumber of smaller clients, particularly for Structural and CivilDesigns. I received regular commissions for Tender Preparationand Assessment and also for Claims Evaluation andReporting.
  • 7. EES Ltd Projects ListPeriod Duration(mths)Client Post Projects ExperienceCategory mthsOct 91 -Jan 06170EES Ltd, Linlithgow,ScotlandDirectorFor details ofEES Projectsrefer below.Business Development 50May 04 –Jan 0620West Lothian CouncilRoads OperationsProgramme ManagerRoads CapitalProgrammeHighways & Transportation 20Project Management 20Contract Administration 10Education & Training 4Sept 03 –May 048Northern IrelandRailResident Project ManagerUpgrade of 22No. Stations inNorthernIrelandProject Management 8Rail 8Contract Administration 6Construction Management 6Health & Safety 6Sept 00 –Aug 0335Babtie (Jacobs)Group, Glasgow forRailtrack ScotlandBridge Engineering ProjectManagerRail BridgeInspections andAssessmentsthroughoutScotlandProject Management 35Rail 35Structures 8Health & Safety 20Jun 97 –Sept 0039East of ScotlandWaterProject ManagerBonnybridgeWWTW, Falkirk,ScotlandProject Management 39Contract Administration 10Water & Drainage 39Health & Safety 8Environmental 6Sept 95 -Jun 9721Brand Leonard,ConsultingEngineers, ScotlandResident EngineerBuchananGalleries,GlasgowConstruction Management 21Contract Administration 15Structures 9
  • 8. EES Ltd Projects List, Cont’dPeriod Duration(mths)Client Post Projects ExperienceCategory mthsOct 91 –Sept 95 47Carl Bro Group,Stirling and Glasgow Project ManagerD & B Projectfor 3 WaterTreatmentPlantsProject Management 36Construction Management 24Water & Drainage 30Structures 20Business Development 12Employment List, Cont’dJun 90 –Oct 91 16Sir M MacDonald &Partners (MMP), AbuDhabi, UAEWater ManagerInfrastructureProjects forWED, AbuDhabi; LeakdetectionProject Management 12Construction Management 6Water & Drainage 16Business Development 6Oct 88 -Jun 9020De Leuw CatherInternational Ltd,Abu Dhabi, UAEResident EngineerAl Salaam St.upgradingproject, AbuDhabiConstruction Management 20Contract Administration 12Highways & Transportation 20Jan 88 –Sept 8810Asco ConsultingEngineers, Doha,QatarSenior Design EngineerInfrastructureProjects forArmy Camps inQatarWater & Drainage 6Highways & Transportation 4Contract Administration 4Jan 87 –Dec 8712Bullen & Ptnrs,Glasgow, ScotlandSenior Highway EngineerA96 KintoreBypass,ScotlandHighways & Transportation 12Environmental 4
  • 9. Employment List, Cont’dPeriod Duration(mths)Client Post Projects ExperienceCategory mthsSept 84 –Jan 8728Waterman & Ptnrs,Edinburgh, ScotlandSection EngineerStructural andInfrastructureProjects forMinistry ofDefenceStructures 14Water & Drainage 12Highways & Transportation 8Aug 81 -Sept 84 37Central RegionCouncil Roads Dept,ScotlandHighway EngineerTown CentreRelief Roads &Trunk RoadImprovementSchemesHighways & Transportation 37Contract Administration 6Construction Management 91976 -1981Paisley University,ScotlandApr 74 -Sept 7629South-East ScotlandWater BoardCivil EngineeringTechnicianWater SupplyProjectsWater & Drainage 29Structures 6Contract Administration 6
  • 10. Total Experience per CategoryCategory MonthsProject Management 204Construction Management 84Business Development 95Contract Administration 93Highways and Transportation 117Rail 55Water and Drainage 138Structures 57Health & Safety 46Environmental 17Education and Training 13
  • 11. Construction of over 4 km of mainly 1600mm diameter sewers by micro-tunnellingConstruction of 33 No. GRP lined very deep manholesParsons Brinckerhoff – Constuction ManagerConstruction Manager for Doha West Area for the Local Roads andDrainage Programme in QatarConstruction of deep interceptor trunk sewer varying from 9 metres to 18metres deep in the Al Gharrafa area.Start of drilling operations 1600mm diameter TBMI am currently scheduling $2 billion roads and drainage projects for the next two years.
  • 12. CPG Global – Transport Sector Manager - NZ• Overall responsibility for the Transport business for the whole of NewZealand, with around 70 Transportation staff in 8 offices.• Responsible for Management of Local Authority networks & assets for7 councils throughout NZ.• Responsible for around 60 projects covering Roads, Rail, Marine andAirports.• Project Director for a number of capital projects including WarrambooMine Haul Road in Western Australia and realignment of State Highway2 at Manawatu Hill in North Island, New Zealand.Realignment ofSH2 Manawatu HillMining Haul Road - Warramboo, AustraliaClient – Rio Tinto
  • 13. KiwiRail - PROJECT INTERFACE MANAGEREmployed by KiwiRail for the proposed $40 million (NZ) new RailStation at New Lynn, West Auckland as part of the New Lynn RailDuplication Project.Duties & Responsibilities:• Manage the Interface with Principal Stakeholders to ensure continued inputand co-operation.• Draft NZS 3910 Professional Services Contract to procure a ContractAdministration Consultant.• Provide co-ordination between Contractor and Stakeholders to manageproject risk, implement change control and explore value engineeringopportunities.• Set up a financial reporting mechanism for project.• Carry out Hazard Identification and Risk Assessment for Station andprepare Safety Case and Evacuation Plan.
  • 14. New Lynn Rail Station prior to commencement of project –single track, ground level.
  • 15. New Lynn Rail Trench during construction (Sept 09)showing diaphragm walls, high level permanent props, midlevel temporary props and platform walls.
  • 16. First Train in Trench Milestone (March 2010)
  • 17. Artists Impression of Completed Station (due August 2010)
  • 18. EC Harris - Senior Project Manager• Proposed Marina Mall Extension and Hotel Towers Development
  • 19. Hyder Consulting - Construction Director• Acted as Senior Project Manager, responsible for the planningand execution of large high-rise residential / commercialdevelopment (2 Billion AED) on Reem Island, Abu Dhabi.
  • 20. West Lothian Council Roads Operations -Programme Manager• In 2004 an additional £83m (Dh 500m) was identified by WLC toeliminate backlog of repairs necessary to bring roads, footways,street lighting and structures up to standard. This resulted in thecreation of a 3 year Capital Programme for road maintenanceworks.• I was appointed to advise the client on every aspect of deliveringthis project from the initial establishment of the project team,through the planning stage and on to delivery.• This was a very ambitious programme but innovative ideas andprudent management ensured successful delivery of 20% additionalwork over target for budget cost.• WLC were named as UK Council of the year in 2006 due to thesuccess of this project.
  • 21. West Lothian Council Roads Operations -Programme Manager – cont’dDuties & Responsibilities:• Advising on Staff structures and establishment of teams for designand supervision of contracts and to provide effective managementand co-ordination of the Project and Project Team• Liaison with Statutory Undertakers and other Council Departments.• Monitor progress and financial targets utilising excel spreadsheetsand Ms Project Gantt Charts.• Monitor performance of Design Teams and Contractors againstProgramme• Management of Task Execution Contract to utilise 17 Contractors inthe execution of the maintenance works.• Training of Council Staff – delivered a highway engineering courseto the design teams• Training of staff in use of Ms project and excel.
  • 22. Northern Ireland Rail - Resident Project Manager• Responsible for planning, administering and supervising theContract to upgrade 22 No. stations in Northern Ireland on behalf ofNorthern Ireland Rail.• Belfast Central – Platform Alterations
  • 23. Antrim Station –ReconstructionLurgan Station –Platform Extension Detail
  • 24. Babtie Group - Bridge Engineering Project ManagerCarried out bridge inspections and assessments for Railtrack Scotland.Dunblane Station FootbridgeSouth Elevation Corrosion to U/S X-Bracing
  • 25. Newmill RoadOverbridge, Keith –General view of theWest elevation.Characteristic freeze-thaw damage at edgesof the arch brickworkmasonry.
  • 26. East of Scotland Water - Project Manager• Upgrade to Bonny bridge WWTWDuties & Responsibilities:• Liaison with ESW Designers (Civil, Structural and Process) and co-ordinate with ESW Operations (end users) to develop and finalisescope of works.• Procurement of Lead Design Contractor.• Agree scope of work and fee with MEP Consultant.• Managing client’s Project Team.• Liaison with Environmental Authority and HSE in development ofRisk Assessment.
  • 27. Construction of Pumping Chamber
  • 28. Outlet from Pumping Chamber
  • 29. Inlet Pipework
  • 30. Inlet Works
  • 31. Brand Leonard - Resident Engineer£150m, Buchanan Galleries Project, Glasgow. This is now Glasgow’spremier shopping mall, containing numerous large, top-branddepartment stores.Duties & Responsibilities:• Design approval, supervision and checking of all piling, foundation,sub-structure and super-structure works.• Monitored Quality and Progress of Construction and reported onsame.• Overall approval of Contractor’s method statements.
  • 32. South AreaConstruction of Tower Crane Base and MiniPiling Rigs for Piling adjacent to Railway Lines
  • 33. North Area with Steel Framed Loading Areaand Concrete Framed Shopping Mall
  • 34. This was the largest crane in Scotland
  • 35. 4.5 m deep Girders to carry Multi Storey CarPark over Main Glasgow – Edinburgh RailwayLine
  • 36. Congratulations All Round after SuccessfulRemoval of 120 year old Cast Iron Road Bridgefrom over Main Glasgow – Edinburgh RailwayLine
  • 37. Large Diameter Piling Rig
  • 38. Carl Bro Group - Project ManagerDesign and Build project in consortium with Trafalgar House toconstruct 3 No. Water Treatment Plants for Strathclyde Water -value £14 million stg.Duties & Responsibilities:• Co-ordination between consortium partners.• Agree detailed scope of work and share of responsibilities for eachparty.• Management of B/CE design and coordination of design teams inCarl Bro’s Edinburgh and Glasgow offices and procurement ofexternal Architectural services.• Liaison with Water Authority, Statutory and EnvironmentalAuthorities and Planners.• Management of Programme.
  • 39. WTW at Picketlaw
  • 40. Sludge Treatment Building with Sludge Press
  • 41. Sedimentation Tanks
  • 42. Sir M MacDonald & Partners, Abu Dhabi - Water Manager• Responsible for all design and site supervisory staff for variouswater supply, pipe laying and rehabilitation projects for the Waterand Electricity Department, Abu Dhabi.• Also involved in ‘leak detection’ studies for Abu Dhabi, a damrehabilitation project for the Dubai government, and preparation ofprequalification document for Consultancy Services for Al Ain City.• Worked closely with WED, Abu Dhabi to develop water policy andwrite specifications. I visited the Bayard Fire Hydrant Factory inLyon, France and the Vanadour Valve Factory in Pau, France toensure compliance with the specification.<Bayard Fire HydrantsVanadour ButterflyValves >
  • 43. De Leuw Cather, Abu Dhabi - Resident EngineerAl Salaam Street widening and upgrading project.Al Salaam Street looking north.
  • 44. Al Salaam Street – Pavement Construction
  • 45. Al Salaam Street –Construction of StormWater DrainageAl Salaam Street –Asphalt Operations