Summary of reactor unit status at 20-march-13-00 utc
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,420
On Slideshare
1,420
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
103
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • 03/20/11 19:25
  • 03/20/11 19:25

Transcript

  • 1. 3/20/2011 13:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel Damaged Damaged Damaged No fuel rods RPV & RCS integrity Unknown Unknown Unknown Not applicable due to outage plant status Containment integrity No damage reported Damage suspected No information AC Power Substation connected Substation connected Not available Not available Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel (Stable) Around half of Fuel (Stable) Around half of Fuel (Stable) Not applicable due to outage plant status Pressure of RPV Stabilized Unreliable Elevated CV Pressure Drywell Stable Stable Elevated Water injection to RPV Seawater Seawater Seawater Water injection to CV No information No information No information Spent Fuel Pool Status No information No information Sprayed from outside Spraying from outside
  • 2. Date : March 20 Reporting time: 03/20/2011 13:00 Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel No damage expected No damage expected RPV & RCS integrity Intact Intact Containment int. No damage expected No damage expected AC Power 2nd Emergency diesel from unit 6 Emergency diesel Building No damage reported No damage reported Water level of RPV Above fuel Above fuel Pressure of RPV Cooling restored Cooling restored Containment Pressure No information No information Water injection to RPV Injection in Progress Injection in Progress Water injection to CV Not needed now Not needed now Spent Fuel Pool Status Cooling restored Cooling restored Severe condition Concern No immediate concern