Your SlideShare is downloading. ×
0
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Office365 case intro petra stojanovic van kan
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Office365 case intro petra stojanovic van kan

404

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
404
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • petra
  • petra
  • BastiaanIn ieder project adresseren we 3 aspecten, technologie is een enabler maar zonder de juisteadoptie of plaatsing in de organisatiezalditniet tot zijnrechtkomen.
  • Transcript

    • 1. human software organisation<br />vanaf1991<br /> circa 100 professionals<br />MicrosoftGold Certified Partner<br />Microsoft | IBM | Mobile<br />projectorganisatie en beheer<br />.net<br />SharePoint<br />Lync<br />Exchange<br />infrastructuur<br />configuratie<br />maatwerk<br />invoering<br />design<br />projectleiding<br />consultancy<br />
    • 2.
    • 3. mens<br />technologie<br />organisatie<br />
    • 4. 1990<br />
    • 5. 2011<br />
    • 6.
    • 7. BYOD<br />innovation<br />department<br />unified communications<br />going green<br />wireless<br />procedure<br />feedback<br />rewards<br />coffee&more<br />budget<br />creativity<br />flex-work<br />process<br />function<br />structure<br />TRUST<br />command and control<br />360<br />freedom<br />inspiration<br />task<br />career<br />social media<br />management<br />CO2 reduction<br />
    • 8.
    • 9. corporate brain<br />activity<br />result<br />

    ×