CONCRETO HECHO EN OBRA              PROPORCIONES DE ACUERDO A RESISTENCIA                                    50 Kg     Bot...
Upcoming SlideShare
Loading in...5
×

Concreto hecho en obra

3,112

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
3,112
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
28
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Concreto hecho en obra"

  1. 1. CONCRETO HECHO EN OBRA PROPORCIONES DE ACUERDO A RESISTENCIA 50 Kg Botes de Botes de Botes deRESISTENCIA REVENIMIENTO Cemento Grava 20lt Arena 20lt Agua 20lt100 Kg/cm2 8 a 10 cm 1 bulto 7 5 2100 Kg/cm2 12 a 15 cm 1 bulto 6.5 5 2150 Kg/cm2 8 a 10 cm 1 bulto 5.5 4 1.75150 Kg/cm2 12 a 15 cm 1 bulto 5 3.5 1.75200 Kg/cm2 8 a 10 cm 1 bulto 4 3 1200 Kg/cm2 12 a 15 cm 1 bulto 4 3 1.25250 Kg/cm2 8 a 10 cm 1 bulto 3.5 2.5 1250 Kg/cm2 12 a 15 cm 1 bulto 3.5 2.5 1.25 MEZCLA CEMENTO - ARENA CERNIDA PROPORCIONES DE ACUERDO A RESISTENCIA 50 Kg Botes de Botes de Proporción Cemento Arena 20lt Agua 20lt 1:2 1 bulto 4.25 1.25 1:3 1 bulto 5.25 1.5 1:4 1 bulto 6.75 1.75 1:5 1 bulto 8 2 1:6 1 bulto 10 2.25

×