SlideShare a Scribd company logo
1 of 18
Download to read offline
MARINE CYBERNETICS

     Company presentation




 2012 © Marine Cybernetics | www.marinecyb.com
MARINE CYBERNETICS




                2012 © Marine Cybernetics | www.marinecyb.com
THE TECHNOLOGICAL EVOLUTION




Machines




Software
                2012 © Marine Cybernetics | www.marinecyb.com
WHO IS OUR CUSTOMER?




              2012 © Marine Cybernetics | www.marinecyb.com
ERROR MESSAGES




                 2012 © Marine Cybernetics | www.marinecyb.com
BLUE-SCREEN




              2012 © Marine Cybernetics | www.marinecyb.com
WHAT IS THE SOFTWARE CHALLENGE?




                                                        IO /
                                                      Network




                                   Operating
                                    System


                                                                Application
If (requiredPower >= MAX_POWER * 0.8)                         (DP, PMS, BOP,
{                                                                DCS, ...)
       shutdownGenerators(); //remember to remove
before final compilation
       …



                                2012 © Marine Cybernetics | www.marinecyb.com
CONSEQUENCES OF LOSS OF POSITION
CASE FOR ACTION




                2012 © Marine Cybernetics | www.marinecyb.com
LISTING INCIDENT DUE TO CONTROL SYSTEM FAULT




                 2012 © Marine Cybernetics | www.marinecyb.com
LOSS OF POSITION




                   2012 © Marine Cybernetics | www.marinecyb.com
CONSEQUENCES OF LOSS OF POSITION
CASE FOR ACTION




                2012 © Marine Cybernetics | www.marinecyb.com
CONTROL SYSTEM INTERDEPENDENCIES

                                         Dynamic
                       Power            positioning
                     management          system               Thruster
                       system                                  control
                                                              system
    Crane control
       system                                                           Integrated
                                                                        automation
                                                                          system
                              Testing and
 Drill floor                 verification of                                Emergency
  control
  system
                            SW has not kept                                  shutdown
                                                                              system
                             pace with the
                             development                                   Diving
                                                                           control
      Well control                                                         system
       systems

                                                              Ballast
                                                              control
                     Offloading                               system
                      system          BOP control
                                        system


                          2012 © Marine Cybernetics | www.marinecyb.com
WHAT IS HIL TESTING?
CONTROL SYSTEM IN NORMAL OPERATION - CONTROLLING REAL VESSEL




                     2012 © Marine Cybernetics | www.marinecyb.com
WHAT IS HIL TESTING?
CONTROL SYSTEM IN NORMAL OPERATION – CONTROLLING SIMULATED VESSEL




                       2012 © Marine Cybernetics | www.marinecyb.com
102 NEW BUILDINGS/RETROFITS



            21 Platform Supply Vessels (PSV)


            14 Anchor Handling Tug Supply (AHTS)


            6 Emergency Rescue Recovery Vessels (ERRV)

            19 Offshore Construction Vessels
            • ROV, Diving, IMR, Well intervention


            31 Drilling units (semi/drillship/jack-up)


            1 Seismic Vessel


            10 Shuttle Tankers

                   2012 © Marine Cybernetics | www.marinecyb.com
REFERENCES

E & P Companies




Vessel owners




                  2012 © Marine Cybernetics | www.marinecyb.com
REFERENCES
Vendors




Yards




             2012 © Marine Cybernetics | www.marinecyb.com
2012 © Marine Cybernetics | www.marinecyb.com

More Related Content

Similar to Company Presentation

System Center 2012 Overview
System Center 2012 OverviewSystem Center 2012 Overview
System Center 2012 OverviewAmit Gatenyo
 
2012 09-27 opening-owi-lab-zf
2012 09-27 opening-owi-lab-zf2012 09-27 opening-owi-lab-zf
2012 09-27 opening-owi-lab-zfSirris
 
Automated Conveyor Inspection Services
Automated Conveyor Inspection ServicesAutomated Conveyor Inspection Services
Automated Conveyor Inspection ServicesDon Tassic
 
Controller MIgration & Connectivity 11.10.09
Controller MIgration & Connectivity 11.10.09Controller MIgration & Connectivity 11.10.09
Controller MIgration & Connectivity 11.10.09mgk918
 
System Center 2012 Ürün Ailesi
System Center 2012 Ürün AilesiSystem Center 2012 Ürün Ailesi
System Center 2012 Ürün AilesiMustafa
 
Model-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityModel-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityFrancesco Flammini
 
Design and Development of Real Time Mission Software for wire guided underwat...
Design and Development of Real Time Mission Software for wire guided underwat...Design and Development of Real Time Mission Software for wire guided underwat...
Design and Development of Real Time Mission Software for wire guided underwat...IJERA Editor
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXBAmor Group
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013Uwe Kurfurst
 
Viking Aerospace - Company Overview
Viking Aerospace - Company OverviewViking Aerospace - Company Overview
Viking Aerospace - Company OverviewVikingAero
 
Control Compliance Suite 10
Control Compliance Suite 10Control Compliance Suite 10
Control Compliance Suite 10Symantec
 
Dp.dynamic.positioning.system.converteam.training
Dp.dynamic.positioning.system.converteam.trainingDp.dynamic.positioning.system.converteam.training
Dp.dynamic.positioning.system.converteam.trainingZaw Aung
 
WQD2011 - Kaizen case study by DEWA - Access Control System
WQD2011 - Kaizen case study by DEWA - Access Control SystemWQD2011 - Kaizen case study by DEWA - Access Control System
WQD2011 - Kaizen case study by DEWA - Access Control SystemDubai Quality Group
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...RekaNext Capital
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationRekaNext Capital
 
Aleem Ullah Azam CV
Aleem Ullah Azam CVAleem Ullah Azam CV
Aleem Ullah Azam CVAleem Ullah
 

Similar to Company Presentation (20)

System Center 2012 Overview
System Center 2012 OverviewSystem Center 2012 Overview
System Center 2012 Overview
 
2012 09-27 opening-owi-lab-zf
2012 09-27 opening-owi-lab-zf2012 09-27 opening-owi-lab-zf
2012 09-27 opening-owi-lab-zf
 
Automated Conveyor Inspection Services
Automated Conveyor Inspection ServicesAutomated Conveyor Inspection Services
Automated Conveyor Inspection Services
 
Controller MIgration & Connectivity 11.10.09
Controller MIgration & Connectivity 11.10.09Controller MIgration & Connectivity 11.10.09
Controller MIgration & Connectivity 11.10.09
 
kDoc 2
kDoc 2kDoc 2
kDoc 2
 
Doc 2
Doc 2Doc 2
Doc 2
 
System Center 2012 Ürün Ailesi
System Center 2012 Ürün AilesiSystem Center 2012 Ürün Ailesi
System Center 2012 Ürün Ailesi
 
Scada assessment case study
Scada assessment case studyScada assessment case study
Scada assessment case study
 
Model-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityModel-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & Security
 
Design and Development of Real Time Mission Software for wire guided underwat...
Design and Development of Real Time Mission Software for wire guided underwat...Design and Development of Real Time Mission Software for wire guided underwat...
Design and Development of Real Time Mission Software for wire guided underwat...
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXB
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013
 
Viking Aerospace - Company Overview
Viking Aerospace - Company OverviewViking Aerospace - Company Overview
Viking Aerospace - Company Overview
 
Control Compliance Suite 10
Control Compliance Suite 10Control Compliance Suite 10
Control Compliance Suite 10
 
Dp.dynamic.positioning.system.converteam.training
Dp.dynamic.positioning.system.converteam.trainingDp.dynamic.positioning.system.converteam.training
Dp.dynamic.positioning.system.converteam.training
 
WQD2011 - Kaizen case study by DEWA - Access Control System
WQD2011 - Kaizen case study by DEWA - Access Control SystemWQD2011 - Kaizen case study by DEWA - Access Control System
WQD2011 - Kaizen case study by DEWA - Access Control System
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
Aleem Ullah Azam CV
Aleem Ullah Azam CVAleem Ullah Azam CV
Aleem Ullah Azam CV
 

Company Presentation

  • 1. MARINE CYBERNETICS Company presentation 2012 © Marine Cybernetics | www.marinecyb.com
  • 2. MARINE CYBERNETICS 2012 © Marine Cybernetics | www.marinecyb.com
  • 3. THE TECHNOLOGICAL EVOLUTION Machines Software 2012 © Marine Cybernetics | www.marinecyb.com
  • 4. WHO IS OUR CUSTOMER? 2012 © Marine Cybernetics | www.marinecyb.com
  • 5. ERROR MESSAGES 2012 © Marine Cybernetics | www.marinecyb.com
  • 6. BLUE-SCREEN 2012 © Marine Cybernetics | www.marinecyb.com
  • 7. WHAT IS THE SOFTWARE CHALLENGE? IO / Network Operating System Application If (requiredPower >= MAX_POWER * 0.8) (DP, PMS, BOP, { DCS, ...) shutdownGenerators(); //remember to remove before final compilation … 2012 © Marine Cybernetics | www.marinecyb.com
  • 8. CONSEQUENCES OF LOSS OF POSITION CASE FOR ACTION 2012 © Marine Cybernetics | www.marinecyb.com
  • 9. LISTING INCIDENT DUE TO CONTROL SYSTEM FAULT 2012 © Marine Cybernetics | www.marinecyb.com
  • 10. LOSS OF POSITION 2012 © Marine Cybernetics | www.marinecyb.com
  • 11. CONSEQUENCES OF LOSS OF POSITION CASE FOR ACTION 2012 © Marine Cybernetics | www.marinecyb.com
  • 12. CONTROL SYSTEM INTERDEPENDENCIES Dynamic Power positioning management system Thruster system control system Crane control system Integrated automation system Testing and Drill floor verification of Emergency control system SW has not kept shutdown system pace with the development Diving control Well control system systems Ballast control Offloading system system BOP control system 2012 © Marine Cybernetics | www.marinecyb.com
  • 13. WHAT IS HIL TESTING? CONTROL SYSTEM IN NORMAL OPERATION - CONTROLLING REAL VESSEL 2012 © Marine Cybernetics | www.marinecyb.com
  • 14. WHAT IS HIL TESTING? CONTROL SYSTEM IN NORMAL OPERATION – CONTROLLING SIMULATED VESSEL 2012 © Marine Cybernetics | www.marinecyb.com
  • 15. 102 NEW BUILDINGS/RETROFITS 21 Platform Supply Vessels (PSV) 14 Anchor Handling Tug Supply (AHTS) 6 Emergency Rescue Recovery Vessels (ERRV) 19 Offshore Construction Vessels • ROV, Diving, IMR, Well intervention 31 Drilling units (semi/drillship/jack-up) 1 Seismic Vessel 10 Shuttle Tankers 2012 © Marine Cybernetics | www.marinecyb.com
  • 16. REFERENCES E & P Companies Vessel owners 2012 © Marine Cybernetics | www.marinecyb.com
  • 17. REFERENCES Vendors Yards 2012 © Marine Cybernetics | www.marinecyb.com
  • 18. 2012 © Marine Cybernetics | www.marinecyb.com