Get Easier to Manager High Load Test Oriented IT projects
Upcoming SlideShare
Loading in...5
×
 

Get Easier to Manager High Load Test Oriented IT projects

on

  • 903 views

A case study on creating a reporting based design approach for Bank Asya using HP Quality Center

A case study on creating a reporting based design approach for Bank Asya using HP Quality Center

Statistics

Views

Total Views
903
Views on SlideShare
903
Embed Views
0

Actions

Likes
0
Downloads
5
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Get Easier to Manager High Load Test Oriented IT projects Get Easier to Manager High Load Test Oriented IT projects Presentation Transcript

    • Session ID:BTOT-TU-1700/8
      Twitter hashtag #HPSWU
    • Get Easier to Manage High Load Test Oriented IT projects: Reporting Based Design Approach Using HP Quality Center
      Speaker Name: IBRAHIM ULUSOY
      Date: 30 November 2010
      Session ID:BTOT-TU-1700/8
    • 3
      Agenda
      Bank Asya
      Bank Asya’sVision
      Bank Asya IT, IT Factory, MajorOutcomes
      Software Development Life Cycle
      FundamentalSteps of Software Testing
      Bank Asya’sQualityProcess
      Bank Asya’sTestingMethodology
      TestingStrategyandReportingBasedDesignApproach
      ManagementReports
    • 4
      Bank Asya
      • Founded in 1996
      • #13 bank in Turkey (basedon asset size over7B Euros -2010 Q3 )
      • Ranked #473 in theworld (based on asset size, accordingtothe Banker Magazine)
      • Over 1.7 millioncreditcards
      • Number of branches : 173
      • Total # of employees : 4240
      • IT Staff : 253
    • Bank Asya’s Vision
      Being a keyplayer in bothretailandcorporatebanking in Turkey
      Growing in Africa, Middle East andparts of Asia
      • Acquired 4 banks in West Africa
      • PlansforNorthernIraqandIndia
      Being a wellknown global player in certaininnovativeareaslikecardtechnology
      • Thefirstcontactlessprepaidcardwithdebitfeature in theworld
      • Thefirstcomprehensivecard program in theworldfeaturinghighwaytollsystem, andcitytransportation (bus, ferries, taxis, parking)
      • Wide set of contactlesscardproducts (CampusCard, AllowanceCardforteenagers,GiftCard )
      • One of theleaders in NearFieldCommunication (NFC) technology
      5
    • 6
      Awards
      CardsandPayments
      Best New CreditCardProductLounch/2009
    • Bank Asya IT
      Staff of 253
      • 78 employees in Operationand Risk Management
      • 175 forDevelopment, Analysis, Qualityand Project Management
      Weorganizedour IT based on a manufacturingbusiness model, called
      IT Factory
      7
    • IT Factory
      8
      IT Factory
      Project Management
      SLA
      OLA
      Mngt
      Lean IT
      ProductionLine
      Strategy
      Business Applications Production Line
      Demand
      Management
      Processes
      Operations
      Card Technologies Production Line
      Tools
      Organization
      SLA Mngt
      CustomerManagement
    • 9
      IT Factory
      IT Factory
    • IT Factory Major Outcomes
      Theratio of operationalwork vs newprojectwork is nowmeasured as %57-%43 in 2010 Q3 (Ourtargetwastoachievetheratio of %60-%40 at theend of 2010)
      Targetratiofortheend of 2011 is %50-%50
      # of untoucheddemandsreducedby %65 since the start of IT factory
      Time spentforreworkreduceddramaticallywhileincreasingproductquality (betterdefectmanagement)
      Transparencyover IT processescontributedtoIT’simagewithinthe bank andmotivation of IT team is directlyeffectedbythis.
      10
    • 11
      Software Development Life Cycle
      Project
      Build
      Test
      Go-Live
      Design
      Test
    • 12
      Fundamental Steps of Software Testing
    • 13
      IT Factory Quality Process
    • 14
      Releases
      IT Factory Testing Methodology
      CR_09.05.19
      New Features
      Regression
      Cycles
      Performance
      Security
      UAT
      Requirements
      Assign To Release
      RQ1
      RQ2
      Assign To Cycle
      Test / Requirment
      Covarage
      RQ3
      Test Plan
      TP1
      TP2
      TP3
      Test Lab
      Issue / Change Demand
      New Features Folder
      Regression Folder
      Performance Folder
      Defects
      Security Folder
      DF1
      UAT Folder
      DF2
      DFN
    • Managing High Load Test Projects Means
      15
      • managingprojectactors in differentdepartments
      • managing lots of tasks
      • managinglots of scenarios
      • managingbusinesscriticalityandfailure
      probabilityrisks
      • managing time to deliver
    • Testing Strategy and Reporting Based Design Approach
      16
      “Countwhat is countable,measurewhat is measurable, andwhat is not measurable, makemeasurable.”
      -Galileo
      • Prepare an excel file thatincludethetasks. Define the risk valuesaccordingtothebusinesscriticalityandfailureprobabilitythenassignthesetaskstothetesters .
      • Ifrequired, estimatethetesting time withrespecttothe risk values
      • Createthereportinghierarchy
      • Preparetherequirementsandscenariosthen define theworkflow of taskscenarioswithrespecttothe risk values of thescenarios
      • Start test executionandfollowdefectmanagement
      • GenerateHierarchyReports
    • Management Reports
      Create an Excel Report in QC that generates the Management Reports with respect to the hierarchy design (advanced SQL knowledge required)
      These report(s) must include the values for
      • Project
      • Departments
      • Services
      • Applications
      • Testers
      17
      • Transparency of QualityProcessesincreased
      • Estimatingtesting time correctly
      • BetterQualityManagement
      • BetterResourceManagement
      • Abilitytoanalyzetheperformance of theactors
      • Better Risk Management
      • On-time delivery
      • ReliableManagementReports
      18
      WhatWeHaveAchieved at theEnd
    • Wethink,
      Wecontributedto Bank Asya’smovingfrom 755th placeto 473rd placebetween 2008 and 2010 bytimelyandhighqualityproducts
    • Continue the conversation with your peers at the HP Software Community hp.com/go/swcommunity