• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Pv task work flow
 

Pv task work flow

on

  • 144 views

Mobile Phone Field trial plan Team work follow

Mobile Phone Field trial plan Team work follow

Statistics

Views

Total Views
144
Views on SlideShare
144
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Pv task work flow Pv task work flow Presentation Transcript

    • Product ValidationCommunication S.B.U.Horngyuh KuoJul, 2005
    • Objective Assure product quality. Reduce Product return rate. Analyze and Trace product Bugs. Meet up and reduce Target lead time.Milestone define.Alarm on Project review. Negotiate with client on customization.Deal with customer while Bug review either project reviewNew feature follow up To observe StandardKeep product follow up ALL standard, such as ETSI / GSM / EDGE / BT …..this part will also cover basic IOT test
    • Activities Test Plan define Test Case development MMI Test (system test) Stress test (auto test) HW Test (BB / RF) Reliability Test Global Field Trial IOT (Interoperability-Testing) FTA Develop Testing Tool Problem Tracing / Analyze Test report Provide
    • Road Map / MilestonePhase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Test DesignPhaseBug Finding/FunctionTestProblemAnalysis/Combination TestValidation Test Regression Test/MP StageReview StageDuration/ Manpower2 - 3 weeks/ 1 -3persons2 -3 weeks/ 4 -5persons3 - 4 weeks/ 4 -5persons1 - 2 weeks/ 4 persons 4 weeks/ 4 - 5persons1 week/ All EngineersMission1. Testing Plan:Schedule, Resource,Test SkillTraining…2. Review Spec.3. Optimize Test Case1. Finish the firstround of TestCase.2. Find out all issuesinside theproduct.1. Issues Analysis &ReproduceProcessFinding2. Complexcombinationtest executes.1. Final verificationfor thesoftware toconfirm thequality.1. Quick response toall the issuesfrom Field side& End-Userside.1. Review overallitemshappenedduring the testperiod, andthen makeimprovementon it.Input1. MRS (MarketingRequestSpec.)/ ProductSpec.2. Software DesignSpec./ MMIFunctionalSpec.3. Standard Test Case4. User Manual5. Senario Flow Chart1. Test Case Excel &Test CaseDatabase.2. SoftwareFunctionalPriority List.3. Software version:Alpha/ Beta.1. Issue List.2. Software version:ESR1. Updated Test CaseDatabase.2. Issue List.3. Software version:ETR1. Remainder issuelist.2. Field or End-UserFeedback IssueReport.3. Software version:Delta.1. Field FeedbackIssue Report.2. End-UserFeedback IssueReport.
    • Phase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Action1. Review Spec. &highlight theproblem fromtest of view.2. Plan the testschedule, testresource &finish theSystem TestPlan3. Base on STP tocreate TestDesign Spec.4. Base on TDS tocreate TestCase Spec.5. Generate Test CaseExcel file.6. Submit ProjectPTS database.7. Create ProjectInformationsharingdatabase.8. Test Case Training.1. Run Test Case &fill in theresult.2. Bug review.3. Generate Auto TestScript.1. Analysis the“Random”/“Once” issue;try to find outrules.2. Identify the rootcause of issues.3. Clarify discussionissues.4. Modify the testcase.1.Go through all theitems in finaltest casedatabase.2. Field Trial1. Field Test2. Analysis End-UserReport issue.3. Verify the Deltaversion afterMP.4. Execute the AutoTest Script tocover the lackof resource.1. Review the NotSuitable TestCase.2. Review the NotAvailable TestCase.3. Check the coverageof Test Planwhich is basedon Customer/Field/ End-User Report.4. Modify thestandard TestPlan.5. Plan the testtraining.Road Map / Milestone
    • MMI Test (system test) Basic FunctionSS / USSD / Call Forward …. Etc (all ETSI standard)GUI (user interface spec) / Language checkAll interrupt passibilityFollowing up test case. Advance featureWAP / GPRDJAVADownloadMMS / EMSPoC / PTTIMPSUSB / IrDA / BlueTooth / synchronization etc..
    • Test case / Test Plan / IOT / Field TrialPlease see example I given yesterday, there are total more then8000 test items in test case.
    • HW Test (BB / RF)Radio frequency Power Level Phase error Frequency error Burst Timing (Ramp Up / Down) Timing Advance Spectrum due to modulation Spectrum due to switching transient Bit Error Rate Rx Level Accuracy Usable receiver input level range Inter-Modulation Rejection Co-Channel Rejection Class Ib RBER Co-Channel Rejection Class II RBER Adjacent Channel Rejection Class IbRBER Adjacent Channel Rejection Class IIRBER RF Exposure Limits (SAR) Handover Check blocking and Spurious Response AM suppression Conduct Spurious Emissions (Active-mode) Conduct Spurious Emissions ( Idle-mode) Radiated Spurious Emissions (Active-mode) Radiated Spurious Emissions ( Idle-mode)Bese Band Acoustic SLR Sending Freq. Response Acoustic RLR Receiving Freq. Response Acoustic STMR Acoustic Stability Margin Sending Distortion Audio Signal Output Current Consumption Full Power Phone OFF maximum current Stand-by current Talking Time Stanby Time Charger Algorithm
    • Reliability Test Function Test Durability Tests (Life of operating elements) Chemical Tests Mechanical tests Climatic testing of cellular phones Aging of cellular phones Package Test Individual components Radio frequency test
    • Stress test (auto test) MO call rate. MT call rate. SMS rate. EMS / MMS rate. WAP / GPRS rate. Dynamic call test. Speech quality. Auto test will be included.
    • Thank YouCommunication S.B.U.Horngyuh KuoHORNGYUH@GMAIL.COMJul, 2005