Product ValidationCommunication S.B.U.Horngyuh KuoJul, 2005
Objective Assure product quality. Reduce Product return rate. Analyze and Trace product Bugs. Meet up and reduce Targe...
Activities Test Plan define Test Case development MMI Test (system test) Stress test (auto test) HW Test (BB / RF) R...
Road Map / MilestonePhase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Test DesignPhaseBug Findi...
Phase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Action1. Review Spec. &highlight theproblem f...
MMI Test (system test) Basic FunctionSS / USSD / Call Forward …. Etc (all ETSI standard)GUI (user interface spec) / Lan...
Test case / Test Plan / IOT / Field TrialPlease see example I given yesterday, there are total more then8000 test items in...
HW Test (BB / RF)Radio frequency Power Level Phase error Frequency error Burst Timing (Ramp Up / Down) Timing Advance...
Reliability Test Function Test Durability Tests (Life of operating elements) Chemical Tests Mechanical tests Climatic...
Stress test (auto test) MO call rate. MT call rate. SMS rate. EMS / MMS rate. WAP / GPRS rate. Dynamic call test. S...
Thank YouCommunication S.B.U.Horngyuh KuoHORNGYUH@GMAIL.COMJul, 2005
Upcoming SlideShare
Loading in...5
×

Pv task work flow

133

Published on

Mobile Phone Field trial plan Team work follow

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
133
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Pv task work flow"

  1. 1. Product ValidationCommunication S.B.U.Horngyuh KuoJul, 2005
  2. 2. Objective Assure product quality. Reduce Product return rate. Analyze and Trace product Bugs. Meet up and reduce Target lead time.Milestone define.Alarm on Project review. Negotiate with client on customization.Deal with customer while Bug review either project reviewNew feature follow up To observe StandardKeep product follow up ALL standard, such as ETSI / GSM / EDGE / BT …..this part will also cover basic IOT test
  3. 3. Activities Test Plan define Test Case development MMI Test (system test) Stress test (auto test) HW Test (BB / RF) Reliability Test Global Field Trial IOT (Interoperability-Testing) FTA Develop Testing Tool Problem Tracing / Analyze Test report Provide
  4. 4. Road Map / MilestonePhase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Test DesignPhaseBug Finding/FunctionTestProblemAnalysis/Combination TestValidation Test Regression Test/MP StageReview StageDuration/ Manpower2 - 3 weeks/ 1 -3persons2 -3 weeks/ 4 -5persons3 - 4 weeks/ 4 -5persons1 - 2 weeks/ 4 persons 4 weeks/ 4 - 5persons1 week/ All EngineersMission1. Testing Plan:Schedule, Resource,Test SkillTraining…2. Review Spec.3. Optimize Test Case1. Finish the firstround of TestCase.2. Find out all issuesinside theproduct.1. Issues Analysis &ReproduceProcessFinding2. Complexcombinationtest executes.1. Final verificationfor thesoftware toconfirm thequality.1. Quick response toall the issuesfrom Field side& End-Userside.1. Review overallitemshappenedduring the testperiod, andthen makeimprovementon it.Input1. MRS (MarketingRequestSpec.)/ ProductSpec.2. Software DesignSpec./ MMIFunctionalSpec.3. Standard Test Case4. User Manual5. Senario Flow Chart1. Test Case Excel &Test CaseDatabase.2. SoftwareFunctionalPriority List.3. Software version:Alpha/ Beta.1. Issue List.2. Software version:ESR1. Updated Test CaseDatabase.2. Issue List.3. Software version:ETR1. Remainder issuelist.2. Field or End-UserFeedback IssueReport.3. Software version:Delta.1. Field FeedbackIssue Report.2. End-UserFeedback IssueReport.
  5. 5. Phase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)Action1. Review Spec. &highlight theproblem fromtest of view.2. Plan the testschedule, testresource &finish theSystem TestPlan3. Base on STP tocreate TestDesign Spec.4. Base on TDS tocreate TestCase Spec.5. Generate Test CaseExcel file.6. Submit ProjectPTS database.7. Create ProjectInformationsharingdatabase.8. Test Case Training.1. Run Test Case &fill in theresult.2. Bug review.3. Generate Auto TestScript.1. Analysis the“Random”/“Once” issue;try to find outrules.2. Identify the rootcause of issues.3. Clarify discussionissues.4. Modify the testcase.1.Go through all theitems in finaltest casedatabase.2. Field Trial1. Field Test2. Analysis End-UserReport issue.3. Verify the Deltaversion afterMP.4. Execute the AutoTest Script tocover the lackof resource.1. Review the NotSuitable TestCase.2. Review the NotAvailable TestCase.3. Check the coverageof Test Planwhich is basedon Customer/Field/ End-User Report.4. Modify thestandard TestPlan.5. Plan the testtraining.Road Map / Milestone
  6. 6. MMI Test (system test) Basic FunctionSS / USSD / Call Forward …. Etc (all ETSI standard)GUI (user interface spec) / Language checkAll interrupt passibilityFollowing up test case. Advance featureWAP / GPRDJAVADownloadMMS / EMSPoC / PTTIMPSUSB / IrDA / BlueTooth / synchronization etc..
  7. 7. Test case / Test Plan / IOT / Field TrialPlease see example I given yesterday, there are total more then8000 test items in test case.
  8. 8. HW Test (BB / RF)Radio frequency Power Level Phase error Frequency error Burst Timing (Ramp Up / Down) Timing Advance Spectrum due to modulation Spectrum due to switching transient Bit Error Rate Rx Level Accuracy Usable receiver input level range Inter-Modulation Rejection Co-Channel Rejection Class Ib RBER Co-Channel Rejection Class II RBER Adjacent Channel Rejection Class IbRBER Adjacent Channel Rejection Class IIRBER RF Exposure Limits (SAR) Handover Check blocking and Spurious Response AM suppression Conduct Spurious Emissions (Active-mode) Conduct Spurious Emissions ( Idle-mode) Radiated Spurious Emissions (Active-mode) Radiated Spurious Emissions ( Idle-mode)Bese Band Acoustic SLR Sending Freq. Response Acoustic RLR Receiving Freq. Response Acoustic STMR Acoustic Stability Margin Sending Distortion Audio Signal Output Current Consumption Full Power Phone OFF maximum current Stand-by current Talking Time Stanby Time Charger Algorithm
  9. 9. Reliability Test Function Test Durability Tests (Life of operating elements) Chemical Tests Mechanical tests Climatic testing of cellular phones Aging of cellular phones Package Test Individual components Radio frequency test
  10. 10. Stress test (auto test) MO call rate. MT call rate. SMS rate. EMS / MMS rate. WAP / GPRS rate. Dynamic call test. Speech quality. Auto test will be included.
  11. 11. Thank YouCommunication S.B.U.Horngyuh KuoHORNGYUH@GMAIL.COMJul, 2005

×