• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
RBR Profile Aug 2013
 

RBR Profile Aug 2013

on

  • 390 views

 

Statistics

Views

Total Views
390
Views on SlideShare
390
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    RBR Profile Aug 2013 RBR Profile Aug 2013 Presentation Transcript

    • August 2013 Presentation Primark, Market St., Manchester – Completed April 2013
    • RBR Construction is a building and restoration company with a unified management which enables a consistent and flexible level of service across the company to all clients with the benefits of our collective experience being brought to bear on each and every project. We pride ourselves on our flexible, collaborative and consensual approach. Our approach to every project is uncompromisingly focused on delivering the very best for our Clients. Over the last decade, RBR has developed a strong track record in the delivery of retail façade refurbishment schemes for operators, owners and developers, including National and International Global brands. Primark, Market St., Manchester
    •        
    • Directors OperationalAdministration Accounts General Admin Personnel Purchasing Health & Safety Business Dev Minor Works Major Projects Restoration Refurbishment & Fit Out Responsive Repairs Metalwork Senior Accountant PA Personnel Manager Buyer H&S Manager Manager Minor Works Manager Manager External Auditor Receptionist Chief Estimator Training Client Liaison Snr. Contracts Manager Project Manager Quantity Surveyor Quantity Surveyor Snr. Surveying Manager Snr. Contracts Manager Project Manager Trades / Craftsmen Foreman Supervisor 1 Foreman Supervisor 2 Foreman Supervisor 3 Foreman Supervisor 4
    • Ireland United Kingdom Continental Europe
    • HIGH STREET RETAIL FACADES & LISTED BUILDING FAÇADE RESTORATION LISTED BUILDINGS CIVIC BUILDINGS RETAIL STORE FIT OUT COMMERCIAL OFFICE FIT OUT HISTORIC BUILDINGS STONE CARVING & REHABILITATION METALWORK RESTORATION FAITH BUILDINGS COUNTRY ESTATE HOUSES STONE & LEAD RESTORATION
    • Primark, Dunfermline, Scotland Façade Rehabilitation & Structural Defect Repairs The façade works include the realignment and structural re-fixing of existing precast concrete panels, concrete repairs and the application of a new insulated render system to all building elevations to improve the appearance and thermal performance of the Primark store. • Client: Primark Stores • Contractor: RBR • Client Rep.: The Property Butler • Value: GBP £2.40m • Completion: CURRENT
    • 10 Trinity Square, London EC3M Restoration of Grade II Listed Architectural Elements The demounting, secure transportation and off-site refurbishment & subsequent re-fitting of architectural elements including: • Client: KOP Properties and Reignwood Group • Architect: Woods Bagot • Contractor: Donban Contracting • Value: GBP £0.85m • Completion: CURRENT  Laylights (rooflights)  Steel Windows  Wrought Iron stair balustrading Architect Woods Bagot Principal, Rob Steul, says: “10 Trinity Square is one of the most iconic Grade II* listed buildings in London and indeed is of national importance given its history of being the first headquarters of the Port of London Authority. The original design was approved in 1912 and exactly 100 years later we have embarked on securing its next century as one of the Capital’s finest hotels and residence developments. The scheme restores the original plan form which was lost in the blitz, and creates a dynamic courtyard space which serves as the public heart of the hotel.”
    • Primark, Piccadilly, Manchester Façade Restoration & Structural Defect Repairs Our flagship project comprising over 300 street front metres of 5 storey elevations. The façade works included cleaning, re- pointing, stone restoration, sealing, lead work, window restoration & specialist stone fabrication. Internal works included stabilisation and repair of the buildings structure. • Client: Primark Stores • Contractor: ISG Pearce • Client Rep.: Consurv Ltd. • Value: GBP £2.81m • Completion: April 2013
    • Primark, Essen, Germany Façade Restoration & Structural Defect Repairs The façade works include Rotec cleaning, re- pointing, stone cladding restoration, sealing & window restoration & sealing. Internal works included stabilisation and repair of the buildings structure. RBR also carried out internal fit out works - Partitions, Ceilings and Decoration • Client: Primark Stores • Contractor: Akor Bouw • Client Rep.: Consurv Ltd. • Value: €0.60m • Completion: November 2011
    • Penneys, Dun Laoghaire, Dublin Façade Structural Stabilisation & Restoration The façade works include cleaning, re-pointing of the brick and stone, stone restoration, sealing and window restoration. The façade was stabilised to the building by tying it by structural steel installed in the floors of the building. The parapet balustrade was dismantled and reconstructed with new lead work installed as appropriate. • Client: Primark Stores • Client Rep.: Consurv Ltd. • Value: €0.30m • Completion: September 2012
    • Primark, Saarbrücken, Germany Building Façade & Terrazzo Stair Restoration The façade works include Stone cleaning, Stone polishing, painting the facade and window restoration. Internally RBR carried out the restoration of the Terrazzo Stairs. • Client: Primark Stores • Contractor: Patton • Client Rep.: Consurv Ltd. • Value: €0.12m • Completion: October 2011
    • Blarney Castle Façade Restoration Project Façade works included, cleaning, re- pointing, stone restoration, stone carving, sealing and replacement lead work. RBR also installed drainage and green roof technology. All work carried out on a live tourist facility. • Client: Blarney Castle • Client Rep.: Southgate & Associates Conservation Specialists • Value: €1.2m • Completion: Ongoing
    • St. Fin Barre’s Cathedral Façade Restoration Project The façade works included, cleaning, re-pointing, stone restoration, stone carving, sealing, replacement lead work, window restoration & specialist stone fabrication . Erection and management of a 78m high access scaffold at this live major tourist venue was also required. • Client: Saint Finn Barre’s Cathedral • Client Rep.: Southgate & Associates Conservation Specialists • Value: €1.20m • Completion: Ongoing
    • Ballinderry Period House Building Envelope Restoration Project The façade works included, cleaning, re- pointing, lime render, weather sealing, replacement lead work, window restoration & specialist stone fabrication. Roof restoration works were also included in the scope of works. • Client: Private Client • Client Rep.: Southgate & Associates Conservation Specialists • Value: €0.32m • Completion: December 2012
    • Castlehyde Period House Building Envelope Restoration Project The façade works included, cleaning, re- pointing, lime render, weather sealing, replacement lead work, window restoration & specialist stone fabrication. The construction of a new limestone gate entrance was also included in the scope of works. • Client: Private Client • Value: €0.25m • Completion: July 2008
    • Kilkenny Courthouse, Kilkenny Façade Stonework & Lead work Restoration The project involved the restoration and refurbishment of the existing Courthouse building envelope dating from 1792, including façade restoration to the building's classical austerity. The parapet balustrade was dismantled and reconstructed with new lead work installed as appropriate. • Client: Primark Stores • Client Rep.: Bluett O’Donoghue Architects • Value: €0.65m • Completion: April 2010
    • Supernova, Ballincollig, Cork New Build Family Entertainment Centre As Main Contractor, RBR were responsible for the structural modifications and interior fit out of this two storey / 20,000 sq. ft. childrens play and activity centre. The works included alterations to the main building and the addition of sports changing facilities and the fit out of the childrens play area and visitor café. • Client: Private Client • Client Rep.: Callanan & Mirner Cost Consultants • Value: €2.0m • Completion: August 2008
    • Fitzgeralds Menswear, Patrick St., Cork Refurb & Fit Out of High Street Retail Unit As Main Contractor, RBR carried out the extension, structural modification and fit out works including the installation of a new lift shaft in a live retail environment. Critical tasks include micro piling under the raft ground floor slab of the extension, construction of a new roof, structural upgrade of floors and fire regs compliance. • Client: Eddie Mullins, Fitzgerald Menswear • Value: €2.0m • Completion: November 2006
    • Elgin Road, Ballsbridge, Dublin Refurbishment of Victorian Residence Full hard & soft strip out and refurbishment of this period dwelling. • Structural timber in floors and roof examined and repaired/replaced as necessary. • Plumbing and electrical services were installed to include features such as the smart homes system. • Windows were replaced with timber clad aluminium. • Walls were re-plastered and each room was fitted out with new cornices and walnut joinery. • Bathrooms were refitted with contemporary white sanitary ware and a marble finish was installed on the floors and walls. • Client: PRIVATE • Value: €0.18m • Completion: August 2008
    • • • • •