Best ofshowschedule 0314

  • 959 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
959
On Slideshare
0
From Embeds
0
Number of Embeds
4

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. 8TH ANNUAL Third Year “Best of Show” SUPER REVIEW SCHEDULE• KTGY GALLERY — 9:00AM – 5:30PM FRIDAY March 14th , 2014 All Students to HANG WORK (no exceptions to this!) THURS (March 13th) KTGY GALLERY 9-11AM & 12-2 PM • 21 Total Student Projects to Review (3 PROJECTS from each design studio) 2014 BOSSR - Page 1 – 3/06/14 ! PRESENTATION SPACE o ALL STUDENTS MUST HAVE THEIR WORK PINNED UP BY NO LATER THAN THURSDAY BY 2PM (NO EXCEPTIONS TO THIS! IF YOU ARE NOT UP, YOU WILL NOT BE ALLOWED TO PRESENT TO JURY ON FRIDAY.) Students SHALL PINUP IN DESIGNATED SPACES. o Each student has 4’ Wide x 8’ Height pin up space + 4’ Depth from Wall for models. PRESENTATION SUMMARY: 30 minutes for each studio presentation block — - 2 mins. For ECS/Design Instructors Overview - 9 mins. For Student Project Overviews (3 students @ 3 minutes each) - 19 mins. For Jurors Questions/Comments for ALL 3 Projects ! PRESENTATION TIME BLOCKS [Presentations are in alphabetical order by instructor. PLEASE CONFIRM TIME SLOT!] o TOTAL TIME ALLOCATION per STUDIO is 30 minutes. This time includes instructor’s overviews, students’ presentations and jury comments. o EACH STUDENT will be allowed NO MORE THAN 3 minutes each to provide overview of project. Students will present IN SESSION and then critics will review these THREE projects together. o INSTRUCTORs (Design + ECS) will introduce the studio project with a NO MORE THAN a 2-minute overview. ! PRESENTATION STRATEGY o Each student should provide enough of the project’s site context along with explaining the design process to get to the final state of development for project. Students’ are encouraged to bring edited props as needed (process models, early sketches, precedent studies, etc.) to tell the FULL STORY of their project. Faculty coaching is strongly encouraged to assist students in preparing presentations and filling in gaps in the project’s story telling and keeping to the established time limits for presenting of work. SCHEDULE [ IN ALPHABETICAL ORDER BY DESIGN INSTRUCTOR’S LAST NAME ]: BREAKFAST (KTGY) 09:00AM – 09:15AM JURY INTRODUCTION 09:15AM – 9:30AM MORNING SESSION: 9:30AM – 10:00AM — #1 (BELLER) Studio Presented (3 projects: 3 of 21) 10:05AM – 10:35AM — #2 (CABRINHA) Studio Presented (3 projects: 6 of 21) 10:40AM – 11:10AM — #3 (FOWLER) Studio Presented (3 projects: 9 of 21) 11:15AM – 11:45AM — #4 (LANGE) Studio Presented (3 projects: 12 of 21) LUNCH 11:45AM – 012:30PM AFTERNOON SESSION 12:30PM – 01:00PM — #5 (WYNN) Studio Presented (3 projects: 15 of 21) 01:05PM – 01:35PM — #6 (YIN) Studio Presented (3 projects: 18 of 21) 01:40PM – 02:10PM — #7 (KILLING) Studio Presented (3 projects: 21 of 21) COFFEE BREAK 02:10PM – 02:30PM BEST of SHOW Voting 02:30PM – 03:30PM [Jury Members Only] FINAL DISCUSSION 03:30PM — 04:30PM [Jury, Students and Faculty] “BEST OF SHOW” 04:30PM — 05:00PM AWARDS CEREMONY ALL STUDENT WORK 05:00PM — 05:30PM MUST BE REMOVED DINNER (for Jurors) 06:30PM [TBD]
  • 2. 8TH ANNUAL Third Year “Best of Show” SUPER REVIEW SCHEDULE• KTGY GALLERY — 9:00AM – 5:30PM FRIDAY March 14th , 2014 All Students to HANG WORK (no exceptions to this!) THURS (March 13th) KTGY GALLERY 9-11AM & 12-2 PM • 21 Total Student Projects to Review (3 PROJECTS from each design studio) 2014 BOSSR - Page 2 – 3/06/14 STUDIO (ECS instructor): [By instructor in alphabetical order] 9:30*am Beller (Beller) 10:00am Cabrinha (Beller) 10:35am Fowler (Williams) 11:10am Lange (Lange) 12:30pm Wynn (Wynn) 1:05pm Yin (Yin) 1:40pm Killing (Killing) *Note times are approximate; we will try to keep reviews on time, but may go longer. Students are encouraged to attend as much of the reviews as possible. 3:30-4:30pm Final Discussion and Awards* *All should attend! 5:00-5:30pm: All Student Work must be removed
  • 3. 8TH ANNUAL Third Year “Best of Show” SUPER REVIEW SCHEDULE• KTGY GALLERY — 9:00AM – 5:30PM FRIDAY March 14th , 2014 All Students to HANG WORK (no exceptions to this!) THURS (March 13th) KTGY GALLERY 9-11AM & 12-2 PM • 21 Total Student Projects to Review (3 PROJECTS from each design studio) 2014 BOSSR - Page 3 – 3/06/14 KTGY Gallery Diagram* (The actual gallery will be clearly labeled for placement of ALL student work) *This diagram is not to scale and is an approximate location for where students will pin up work per studio section. Each project has 32 SF of pin-up space = 4’ wide by 8’ high. However, back wall (Lange and Wynn) has a clerestory above, so pin-up space is only 6’ high. These students can either be 5’ 4” wide x 6’ or have an additional 2’ high by 4’ wide area to the right of their 4’ wide x 6’ high wall, if this space is needed. 3 projects 3 Projects 3 Project KILLING YIN CABRINHA BELLER 3rd Year Section Posters In Alcove FOWLER 3 Projects 3 Projects 3 projects No project pinup in corner No project pinup over double door 3 Projects LANGE* WYNN* KTGY Gallery entry / Glass Wall