Your SlideShare is downloading. ×
Bi methodology
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Bi methodology

1,250
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,250
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
33
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Pre Study Merupakan fase awal yang ditujukan untuk mengumpulkan sebanyak mungkin informasi tentang tujuan projek, sasaran dan ruang lingkup kerja seperti : mengidentifikasi kebutuhan masa depan, mengumpulkan data yang berhubungan dengan kondisi teknikal yang sudah ada di lapangan.
  • Analysis Wawancara dengan manajer dan Bagian EDP Memahami secara komprehensif mengenai tantangan besar yang dihadapi oleh pihak manajemen dalam pengambilan keputusan dan pihak EDP dalam menyajikan informasi bagaimana permasalahan itu diatasi dengan proyek Business Intelligence Melakukan pengenalan struktur database yang sudah ada Design Membuat Matriks yang menghubungkan business process (cube) yang ada dengan objek dimensi di aplikasi Business Intelligence
  • Transcript

    • 1.  
    • 2. Project Map BI Blueprint Pre Project Realization Final Preparation Go Live & Guidance Post Project Implementation Methodology Pre Study Contract Project Preparation Kick Off Meeting Analysis & Design Dimensional Design Physical Design ETL Design BI Application Dev Installation User Acceptance Test Training Delivery Live preparation Live Guidance Hands Over Project Evaluation On Going Support
    • 3. Pre Project Pre Study Contract Project Preparation Kick Off Meeting
    • 4. BI Blueprint
      • Analysis
      • Conduct Executives Interview
      • IT Interviews
      • Group interview summaries by analytic themes
      • Do data profiling to research data sources as needed
      • Identify business process based on analytic themes
      • Design
      • Build initial Bus Matrix
      • Conduct Prioritization Session
    • 5. BI Blueprint Final Deliverables Business Process Summaries Bus Matrix Prioritized results Interviews Summaries
    • 6. Realization BI Application Development Project Management Dimensional Modeling ETL Modeling Physical Design
    • 7. Final Preparation Installation Training Delivery Live Preparation UAT
    • 8. Go Live & Guidance Installation Training Delivery Live Preparation
    • 9. Post Project On Going Support Software: - New BI Version will be Available every 6 month Project Evaluation
    • 10. Dimensional Modeling Process Final Deliverables Initial High Level Data Map Dimension + Fact table Diagram Attributes Descriptions
    • 11. Physical Design Process Final Deliverables All Physical design documentation
    • 12. ETL Modeling Process Final Deliverables High level data map
    • 13. BI Application Dev. Final Deliverables User Acceptance document