• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Risk assessment
 

Risk assessment

on

  • 42 views

 

Statistics

Views

Total Views
42
Views on SlideShare
42
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Risk assessment Risk assessment Document Transcript

    • Risk Assessment Scene: Director: Date: Activity Risk Preventative Measure Filming interviews. Camera wire across the floor. People can trip over the wire and can badly hurt themselves. Put the wire to one side and notify people to not walk on that side of the room. Filming the chess pieces. There is a risk of damaging the container, which contains the chess pieces by tripping over your laces and hitting the glass. Make sure your laces are tied and also make sure you have sufficient space around yourself. Moving around with equipment. Tripod legs hitting the general public and the museum walls. Also dropping the camera and other equipments. Close the tripod legs and fold it up and put it in the tripod case. Make sure the camera is strapped around your neck or it is in the camera bag. Filming general public. British museum Amad Islam 4/12/13