Your SlideShare is downloading. ×
Content Development WBS
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Content Development WBS

634
views

Published on

WBS for training content development project

WBS for training content development project


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
634
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Performance‐Driven Instruction;  Development Project WBS  1. PLANNING PHASE  1.1. Project objectives  1.2. Project scope  1.3. Project resource plan  1.4. Project communications plan  1.5. Project schedule  1.6. Project budget  1.7. Project kick‐off  2. ANALYSIS PHASE – Design Training Requirements   2.1. Review proponent technologies  2.1.1. Identify impacted personnel  2.1.2. Identify department liaison  2.2. Review existing skill sets  2.3. Review technology skill requirements  2.4. Skills gap analysis 3. DESIGN PHASE – Write Instructional Design   3.1. Produce design document  3.1.1. Course description and goals  3.1.2. Define technical requirements    3.1.3. Identify learning outcomes and objectives    3.1.4. Sequence activities/topics    3.1.5. Define assessment and activity rubrics    3.1.6. Identify technology treatment     3.1.7. Draft training delivery schedule (daily event structure)  3.2. Draft instructional technology specification  3.2.1. Write learning technology/application specification   3.2.2. Commit technology design and developers to deliverables  3.3 Hold instructional design review  3.3.1. Obtain Development Advisor/SME agreement  1 
  • 2. 3.3.2. Commit SME/instructor(s) to the design and project  3.3.3. Obtain endorsement by content development lead 4. DEVELOPMENT PHASE – Develop Course Content   4.1. Draft general training activities and scenarios  4.1.1. Define objectives and requirements  4.1.2. Create activity procedures  4.1.3. Write rubrics   4.2. Develop instructional technology   4.3. Draft content and aids  4.3.2. Presentations   4.3.3. Handouts and case materials  4.3.4. Instructional graphics   4.3.5. Participant manual   4.3.6. Instructor guide  4.3.7. Participant orientation  4.4. Review training activities and scenarios  4.5. Review instructional technology   4.6. Review content and aids  4.7. Edit training activities and scenarios  4.8. Correct instructional technology problems  4.9. Edit content and aids  4.10 Signoff by appropriate signatories  5. IMPLEMENTATION PHASE –   5.1. Scheduling/registration (post content to LMS/notify delivery personnel)  5.2. Train the trainers (as needed)  5.3 Training rehearsal (dry run)  5.3.1. Technology administrators  5.3.2. System users – SMEs/instructor(s)  5.4 Deliver pilot 6. EVALUATION PHASE –   6.1. Evaluate feedback  6.2. Detail project lessons learned  6.3. Write handover document for content work‐over project  2