Your SlideShare is downloading. ×
0
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
portland cement
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

portland cement

1,303

Published on

manufacturing of portland cement

manufacturing of portland cement

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,303
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
106
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Manufacturing Portland Cement <br />Ahmad Moufleh<br />Construction, Civil Engineering<br />April 11, 2011<br />
  • 2. Outline:<br />1. Introduction <br />2. Definition<br />Stagesof Manufacturing<br /> A. Stage one : <br />A.1 Calcareous and Argillaceous<br /> A.2 Preliminary Crushing<br /> A.3 Fine Grinding Mills<br /> B. Stage two :<br /> B.1 The Elevators<br /> B.2 Correction Silos<br /> C. Stage three :<br />C.1 Rotary Kiln<br /> D. Stage four : <br />D.1 Elevator Clinker Storage<br />D.2 Adding Gypsum<br /> D.3 Grinding<br /> E. Stage five :<br />E.1 Elevator Cement Silos<br />E.2 Weighing and Packing<br />E.3 Supply<br /> 4. Conclusion <br />
  • 3. 1- Introduction <br />
  • 4. 2- Definition<br /><ul><li>Binder
  • 5. Glued </li></li></ul><li>3- Way of Manufacturing<br /> A. Stage one : <br /> A.1 Calcareous and Argillaceous<br /> A.2 Preliminary Crushing<br /> A.3 Fine Grinding Mills<br /> B. Stage two :<br /> B.1 The Elevators<br /> B.2 Correction Silos<br /> C. Stage three :<br /> C.1 Rotary Kiln<br /> D. Stage four : <br /> D.1 Elevator Clinker Storage<br /> D.2 Adding Gypsum<br /> D.3 Grinding<br /> E. Stage five :<br /> E.1 Elevator Cement Silos<br /> E.2 Weighing and Packing<br /> E.3 Supply<br />
  • 6. A. Stage one: <br />1.1 Calcareous and Argillaceous<br />- Calcareous : limestone , marl , chalk<br />- Argillaceous : silicates of alumina<br />1.2 Preliminary crushing<br />- Crushing <br />1.3 Fine grinding mills<br />- Grinding<br />
  • 7. B. Stage two : <br />2.1 The elevators<br /><ul><li>lime slurry and clay slurry
  • 8. correction silos</li></ul>2.2 Correction silos<br />- ratio of the components<br />
  • 9. C. Stage three: <br />3.1 Rotary kiln<br />- Dried Clinker<br />- 1400 - 1500 c<br />
  • 10. D. Stage four: <br />4.1 Elevator clinker storage<br />- Storage in the huge tank <br />4.2 Adding gypsum<br />- Purpose : protect clinker <br />97% clinker 3% gypsum<br />95% clinker 5% gypsum<br />4.3 Grinding<br />- Powdering the cement<br />
  • 11. E. Stage five : <br />5.1 Elevator cement silos<br />- Storage <br />5.2 Weighing and packing<br />- Packing in 50kg bags <br />- Re-weighting <br />5.3 Supply<br />- giving out to the companies<br />
  • 12. 6- Conclusion<br />- Review <br />- Questions ??<br />
  • 13. Thank you <br />

×