IDMP CEE Activity 1.2 by Elena Fatulova
Upcoming SlideShare
Loading in...5
×
 

IDMP CEE Activity 1.2 by Elena Fatulova

on

  • 282 views

Activity 1.2 Review

Activity 1.2 Review

Statistics

Views

Total Views
282
Views on SlideShare
278
Embed Views
4

Actions

Likes
0
Downloads
1
Comments
0

1 Embed 4

http://unjobs.org 4

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    IDMP CEE Activity 1.2 by Elena Fatulova IDMP CEE Activity 1.2 by Elena Fatulova Presentation Transcript

    • Act. 1.2 Review of the current status of the implementation of DM plans and measures within RBMP according to EU WFD First IDMP workshop – 15-16 October, Hodrusa Hamre, Slovakia Elena Fatulova, GWP Slovakia
    • Content ● Background information on EU drought policy ● Activity 1.2 – aim, tasks, timetable, partners, outputs ● Questionnaire – draft on place
    • What is EU Drought Policy? ● EU Drought Policy - based on drought risk management ● Legal framework – Water Framework Directive ● Drought management plan – part of River Basin Management Plan
    • Water scarcity and drought policy Water scarcity Drought man-made phenomenon - recurrent imbalance that arises from an overuse of water resources, caused by consumption being significantly higher than the natural renewable availability natural phenomenon - temporary, negative and severe deviation along a significant time period and over a large region from average precipitation values (a rainfall deficit), which might lead to meteorological, agricultural, hydrological and socioeconomic drought, depending on its severity and duration
    • WS&D policy – milestones at EU level ● 2001 - Common implementation Strategy for WFD (CIS) launched ● 2003– WS&D expert group established ● 2007 – Communication „Addressing the challenge of water scarcity and droughts in the European Union” (COM/2007/0414 final) ● 2012 – “A Blueprint to Safeguard Europe's Water Resources” (COM/2012/673 final)
    • Communication 2007 – policy options ● Putting the right price tag on water ● Allocating water and water-related funding more efficiently ● Improving drought risk management Developing drought risk management plans (by 2009) ● Considering additional water supply infrastructures ● Fostering water efficient technologies and practices ● Fostering the emergence of a water-saving culture in Europe ● Improve knowledge and data collection
    • Blueprint – problems and solutions ● Land use and ecological status of EU waters ● Chemical status and pollution of EU waters ● EU water efficiency ● Vulnerability of EU waters ● Knowledge base and improving governance ● Global aspects – access to safe drinking water and basic sanitation services
    • What are main outputs of WS&D EG? Drought Management Plan Report Including Agricultural, Drought Indicators and Climate Change Aspects EU indicators: General guidelines for DMP: Indicators and thresholds establishing onset, ending, and severity levels Measures to be taken in each drought phase Organizational framework to deal with drought • Standardized Precipitation Index (SPI) • Fraction of Absorbed Photosynthetically Active Solar Radiation (fAPAR) • Water Exploitation Index Plus (WEI+)
    • Activity 1.2 Review of the current status .... Objective To gather information and analyse the current situation in preparation of the DMP and implementation of mitigation measures Methodology Questionnaire E-mail communication Output Report on the review of the current status of implementation of the Drought Management plans and measures
    • Activity 1.2 Review of the current status .... Partners Timetable SK, CZ, HU, PL, LIT, ROM, BG, UA, MD, SLO Draft of the questionnaire – 10/10/2013 Comments to questionnaire - 20/10/2013 Questionnaire completed - 31/10/2013 Filling in questionnaire – 31/12/13 Draft of the report for comments – 1/3/2014 Comments to the report – 15/3/2014 Report completed – 31/3/2014
    • Questionnaire Part 1 Part 2 Personal data Information on the development of DMP or WRMPs ●Has the DMP/WRMP been developed? - Which items does it contain? - On which level has it been developed? ●Has the DMP been included in the RBMP? ●Have the water scarcity issues been identified as relevant? - If yes, which effects have been identified? ●Have the drought issues been identified as relevant? - If yes, which effects have been identified? - If no, are there evident drought impacts on society, nature, economy? ●Have water scarcity and drought aspects been distinguished in DMP or WRMP?
    • Questionnaire Part 2 ● Are the data on water demand included in the RBMP or WRMP? ● Are the data on water availability included in the RBMP or WRMP? ● Which parameters indicating the drought period are being monitored? ● Which parameters characterising the drought impact are being recorded and assessed? ● Which of the under mentioned EU indicators have been assessed?
    • Questionnaire Part 2 ● Has an early warning indicator system been developed? - If yes, for which drought indicators have the thresholds been established? - If yes, which categories of the drought stages have been classified? ● Has another plan independent of DMP been developed? ● Have the drought risk maps been developed? ● Have some guidelines for DMP/WRMP or drought risk maps been developed?
    • Questionnaire Part 2 ● Are there ongoing activities focused on the development or updating DMP or WRMP? ● Have the National Action Programmes (NAP) key instruments in the implementation of the Convention been developed? Institutional analysis Part 3 ● Which istitutions are mostly dealing with the drought management issues?
    • Questionnaire Part 3 Part 4 ● Has the drought management organisational structure been established? ● Has the competent entity for the DMP development been established? ● Has the working group for identification of drought impacts and development of the DMP – composition been established ? Analysis of management measures ● Which measures to deal with WS&D have been implemented or are planned?
    • Questionnaire Part 5 Transparency and public participation in the development of the DMP ●Are the RBMP, DMP, WRMP publicly available? ●Have the contact points been determined for making information accessible? ●Which are the main weaknesses in preparation of the DMP or WRMP? Part 6 Remarks
    • Questionnaire – next steps ● By 20 October 2013 – send a comments to draft of the questionnaire ● By 15 December 2013 – fill in the questionnaire