Your SlideShare is downloading. ×
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Design Group Corporate Profile

1,232

Published on

DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to cater to the Design Engineering needs of small civil Engineering and Electrical Engineering projects, has now growth …

DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to cater to the Design Engineering needs of small civil Engineering and Electrical Engineering projects, has now growth into a full fledged Consultancy Organisation, providing its Design Engineering Consultancy services in various fields of Engineering related to very large projects.

Presently the DESIGN GROUP has been registered as a private limited company in the name and style of DESIGN GROUP Project Consultants Private Limited. ISO 9001-2000 Certificate has been conferred on the Organisation in the year 2004.

DESIGN GROUP has been providing various consultancy services required for the implementation of power projects from conceptual stage to completion and comissioning stage and operation and maintenance stage, Energy Audit and Modernisation Schemes for Electrical & Mechanical installations.

The firm has been retained by large industrial houses, firms and independent power producers in India, to extend planning and design engineering services for various projects.

The true strength of DESIGN GROUP is its dedicated and talented team members with more than 30 years of experience in the field of investigation, planning, design, implementation, management and operation and maintenance of large and small power plants and the engineering projects.

DESIGN GROUP is associated with various technical and professional institutions such as the Consulting Engineers Association of India, Central Power Research Institute, Bangalore, to keep abreast with the latest developments and practices in the various fields of engineering. It has entered into MOU with leading overseas consulting firms for providing specialised consultancy services and for taking up overseas projects.

DESIGN GROUP has been successfully providing pre-tender and post-tender services for various public sector undertakings such as Karnataka Power Transmission Corporation Ltd, Visweshwaraiah Vidyuth Nigam Ltd., and several private sector undertakings, for the bid preparation and analysis. These services include assessment of costs, detailed specifications of various items of work, conditions of contracts, tender documents, tender analysis and reports leading to selection of construction and supply agencies as per time bound schedules and needs of clients.

DESIGN GROUP has embarked upon extending its activities to overseas projects, especially in the Middle East Countries such as Saudi Arabia, Oman, United Arab Emirates and neighboring country Nepal.

With the backing of wealth of experience and dedicated service to its clients, DESIGN GROUP has become the most preferred Consultancy firm for extending Consultancy Services for Power Projects and other Engineering Projects.

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,232
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. An Engineering Consulting Company
  • 2. Content Sl. No.  Description  Page No.  1  Design Group – A Profile  1  2  ISO Certificate  4  3  Certificate of Consulting Engineers Association of India  5  4  Certificate of  Incorporation  6  5  Empanelment with BHEL   7  6  Empanelment with Construction Industry Development  8  Council  7  Merger of M/s. Subhadra Consulting Engineers with M/s.  9  Design Group Project Consultants Pvt Ltd  8  Experience ‐ write up on Sample Projects  11  9  List of Project on Hand  26  10  Organization Structure      A. Panel of Consultants / Advisors   30    B. Technical Personnel   32  11  List of Project /Assignments Successfully Completed      A. Desk Study Report   34    B. Detailed Engineering of Projects  36    C. Preparation of Detailed Project Reports  43    D. Pre‐Feasibility Studies of Power Projects  50    E. Pre‐ Tender Services  59    F. Due Diligence Report  67  12  A few Certificates for Successfully Completed  Projects  72  13  Brief Profile of Advisor / Consultants      a) Advisor      H.V. Eswaraiah, Hydro Power Projects  89    Shankar V. Nesargi, Wind Energy  90    P.R. Balasubramanian, Gas Based Power Plant  91    B.V Ramakrishnaiah,  Gates & Penstocks  92    Balachandran. V, Engineering Geology  93    C.R. Venkatesh , Hydro Power Projects  94  Content   
  • 3. Sl. No.  Description  Page No.    M.C. Rangarajan, E & M Works  95    S. Ramanan, Hydro Power Projects  96    Umashankar, Steel Structure  97    Narayanan V, Transmission Line  98    Channakeshava C, Computer aided designs  99    Shridhar Prabhu, Legal Advisor, PPA  100    Srinath. N, Environmental Engineering  101    b) Consultants     C.S. Hebli, Chairman  102   B.L Lakshminarasimha, Chief Executive Officer  103   P.R Mallikarjuna, Executive Director (Design Head)  104   P.K. Rupangudi , Director (Gates, Dams design)  105   Chikkaguddappa Director (Project Development  106   Raghavendra Rao H, Director (Electrical Generation)  107   M.M. Reddy, Director (Transmission line,  108  Switchyard & Sub‐Station)   R .Vasudevan, Deputy Director (Water & Waste  109  Water)   U.R. Raghotham , Director (Tunnel and Dam design)  111   G. Penchalaiah, Irrigation Project – Investigation  112   Suryanarayana, Engineering Geology  113   K. T. Sreedhara, Deputy Director (Irrigation)  114   Achutha Narayana, Deputy Director (Hydro civil  116  design)   T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based  117  Power Plant)   P Sudarshan Rao, Manager (Electrical Generation)  118  Content   
  • 4.     1. DESIGN GROUP –A PROFILE   was  established  in  1979  to  offer  consultancy DESIGN GROUP  services  for  civil  and  electrical  engineering projects. Having completed over 100 prestigious and varied assignments in the last 5 years,  DG  is  a  leading  consultancy  firm,  offering  full‐fledged  consultancy  services across various fields of engineering in India and Abroad.   Equipped to provide design consultancy on very large engineering projects, DG has been  providing  technical  consultancy  services  to  various  organizations  and companies  for  planning,  detailed  design,  and  implementation  of  Hydel,  thermal, and other power projects. These services include analysis of financial aspects, design engineering  for  electrical  installation  of  substations,  switchyards  and  transmission lines,  design  engineering  for  civil  engineering  structures  including  large  dams, tunnels  ,  canals,  power  canals,  cross  drainage  works,  surge  tanks,  penstock  ,  and power houses. DG also provides services related to other civil engineering fields of Irrigation, Water Supply, and Waste Water Treatment.    DG,  which  has  an  annual  turnover  of  over  Rs.400  lakhs,  provides  consultancy services  required  for  the  implementation  of  projects,  right  from  concept  to completion,  commissioning,  operation  and  maintenance,  thereafter.  DG’s  services have  been  utilized  by  Large  Industrial  Houses,  Firms,  and  Independent  Power Producers in India, and elsewhere, for the planning and design engineering of their projects.  In  year  2004,  DG  was  honored  with  an  ISO  9001:2008  certification  for  its design engineering services and continues to hold the certification.  DG  have  entered  into  MOU/  JV  with  number  of  large  institution  to  name  a  few Messers:   1) WAPCO New Delhi.  2) ILF Consulting Engineer, Austria  A Profile  1 
  • 5.   3) GEM Engineering Company Ltd., Uganda  4) IL&FS Ltd., Hyderabad   5) NihamShand Cape town South Africa  6) Land Mark Holding Ltd. Nairobi, Kenya  7) SSDC Damam KSA     Corporate Office DG has been empanelled in a few public sector undertakings.  1) BHEL for extending design engineering services in Hydro Power projects   2) Karnataka  Neeravari  Nigam  Limited  for  engineering  services  for  Water  Resources Projects.  3) PFC consulting Limited, New Delhi for Power Projects.   Our clients include Messers  1) Nuclear Power Corporation Limited.  2) Gammon India Limited.  3) Fichtner Limited.  A Profile  2 
  • 6.   4) GMR Energy Limited.  5) ILFS Infra Limited.  6) WAPCO  7) NTPC  8) BHEL  9) Ritwik Energy Limited Hyderabad  10) Greenko Energy Limited Hyderabad  11) AMR Mitra JV Ltd., Hyderabad   More than 100 engineering  software’s have been developed  in house over a period of 20 years. In addition, more than a dozen engineering design softwares have been acquired and are in use for day to day work .State of Art facilities have been created to take up large Water Resources Projects.  Presently the major Detailed Engineering works on hand are   1.   Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in  Saudi Arabia.  2.   Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at  Rafha Saudi Arabia.  3.   Two Irrigation Projects in Afghanistan namely   a. Machalgho Multipurpose Project, near Kabul  b.  Pashdan Multipurpose Project in Herat region.  4.   81 MW Tinget HEP in Himachal Pradesh, India.  5.   75 MW Trishuli Galachhi HEP in Nepal, India.  6.   25 MW Mahan‐3 HEP in Chhattisgarh, India.  7.   12 MW Gatambe HEP in Kandy Sri Lanka.  8.   Balance  of  Plant  for  32  MW  wind  mill  under  phase  II  near  Chikkodi  near  Belgaum, Karnataka, India.   In addition 31 assignments are in different stages of implementation   A Profile  3 
  • 7.    A Profile  4 
  • 8.      A Profile  5 
  • 9.      A Profile  6 
  • 10.    A Profile  7 
  • 11.        A Profile  8 
  • 12.       A Profile  9 
  • 13.      A Profile  10 
  • 14.  8.  EXPERIENCE  IN  DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT PROJECTS  8.1   Balance of Plant of Hail – 2 Power Plant  M/s.  Alfanar  one  of  the  leading  EPC  contractors  in  Kingdom  Saudi  Arabia  was awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi Electric  Company.  M/s  ILF  Abu  Dubai,  UAE,  were  the  principal  consultants,  M/s. DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and to  issue  all  construction  drawings  and  designs  for  complete  plan  except  GTG. Siemens were the GTG equipment suppliers.   This  was a fast track  project, involving  issue of  more than 600 drawings  in a  short span  of  4  months.  The  project  was  successfully  commissioned  on  schedule  in  the month of July 2011. The assignment included interaction with clients / SEC (Owners) during approval stage.  The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 kV GIS and 380 kV AIS. The extension project consisted of –   1. 132  kV,  220MVA  Generator  Transformer,  13.8kV  /  4.16kV  15MVA  unit  auxiliary  transformers,  10  nos.  service  transformers,  MV  &  LV  Switchgears  and other BOP.  2. Crude  oil  /  Distillate  oil  fired  Gas  Turbine  Generator  units  of  55/70MW  output – 2nos.  3. Crude oil treatment and forwarding and distillate oil forwarding system for  new units.  4. Associated piping, cabling & services     A Profile  11 
  • 15.     GTG Building under Construction   The Engineering services for the project consisted of –    • Civil  Engineering  involving  structural  designs,  Architectural  layouts,  equipment  foundations,  for  GTG  Building,  FOTP  Building  &  Switchgear  Building, etc,.  • Mechanical  Engineering  involving  plant  Layouts,  piping,  equipment  sizing,  fire fighting system, HVAC, etc,.   • Process Engineering involving overall process flow discussions, P & ID’s, etc,.   • Electrical  Engineering  involving  system  studies,  development  of  SLD’s,  equipment  sizing,  for  transformers,  MV  &  LV,  Switchgears,  DC  &  UPS  Systems, Cable & inter connection schedules.  • IAC  illumination  Engineering  involving  interfacing  new  unit  &  BOP  to  existing CLR.    A Profile  12 
  • 16.     8. 2   Sea Water Intake for PFBR Plant Systems:    Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling  Water  System  under  ambitious  plan  of  generating  power  through  Plutonium  Fast  Breeder  Reactor  Project  (PFBR)  to  M/s.  Gammon  India  Limited.    The  major  components of the scheme  were off‐shore  intake shaft, on‐shore outlet shaft, and a  submarine tunnel connecting the two structures at about 45m below sea level.  M/s.  Design  Group  Project  Consultants  Pvt  Limited,  were  involved  in  detailed  engineering services for the sub marine tunnel and shafts.  The project is since been  successfully completed.       The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm  dia  finished  diameter.    The  outer  diameter  varied  from  4300mm  to  4600mm,  thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate  rock  cover  region,  using  M‐45  grade  cement  concrete.     The tunnel  passes  through  Charnockyte type II  rock  medium having  modulas of elasticity  is 0.46 to 3.34  x 106   tons  per  square  meter.  The  poisons’  ratio  adopted  ranged  between  0.14  to  0.25  in  A Profile  13 
  • 17.  rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of insitu rock is 75.60 Mpa.   Submarine Tunnel      Outlet Shaft as Viewed from Submarine Tunnel       As  per  report  investigation  report  the  dry  density  of  rock  is  2.66  to  2.99  gms  per cubic  centimeter.  The  tunnel  was  driven  45m  below  the  sea  level  without  any geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling  A Profile  14 
  • 18.  the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to be 1.024 ton per cum.  In  addition,  inlet  shaft  (4250  /  5250  mm  dia)  and  outlet  shaft  (6000 /  7000  mm  dia) were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade concrete.   8.3    Varahi Tail Race Mini Hydel Scheme:   River  Varahi  is  an  important  West  flowing  river  of  Karnataka  State  with  large Hydel  power  potential.  Power  development  in  the  Varahi  Valley  with  an  installed capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x 115=  230  MW  at  Varahi  Underground  Power  House  was  completed  by  Karnataka Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd. Varahi  Tail  Race  Mini  Hydel  Scheme  utilizes  the  tailrace  discharges  of  Varahi Underground  Power  house  and  the  available  level  difference  between  the  point  of confluence of tailrace of Under round Power House with Varahi River and the FRL of  Varahi  Irrigation  Dam  proposed  downstream,  for  generation  of  power.  The proposed  scheme  comprises  of  the  construction  of  a  diversion  weir  across  Varahi river just downstream of the confluence of tail race of VUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m Dia  simple  type  surge  tank,  7m  dia  penstock  tunnel,  3  Nos.  steel  penstocks  and  a power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW capacity each under phase I and a tail race joining the Varahi River on its right flank.  Under Phase II, two more units of similar capacity have been added.            A Profile  15 
  • 19.     View of Diversion Weir Structure with radial gates           Power House under Construction                   Overview of Power House   A Profile  16 
  • 20.    The  cost  of  the  project  inclusive  of  escalation  in  costs  during  construction  and financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of completion and is to be commissioned during the year 2005.   Penstock Tunnel, Concrete Lining under Construction                                                                           22m dia Shaft    A Profile  17 
  • 21.   8.4   AMR/ SHAMBURI Mini Hydel Scheme   M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24  MW  (5  x4.8  MW)  Mini  Hydel Scheme  across  river  Nethravathi,  a  major  west  flowing  river  in  Karnataka.  The design  flood  at  the  barrage  is  11500  cumecs.  The  plant  is  situated  35  km  from Mangalore,  a  major  costal  city  in  west  Karnataka.  The  project  has  a  low  head fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a large flow.  The design discharges utilized for power draft is 78.47 cumecs per unit. The  units  are  capable  of  running  at  15%  continuous  overload.  ‘S’  type  Kaplan turbine  coupled  to  4800  KW  synchronous  generator  through  the  gear  box  are adopted.  During  the  construction,  another  developer  M/s.  Rithwik  Energy Generation proposed a 24 MW capacity power plant on the other bank. After mutual discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.      Thus,  a  power  house  accommodating  10  x  4.8  MW  was  planned  and  developed, with  a  combined  annual  generation  of  115.14  GWHr.  The  scheme  comprises  of,  a barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs flood, non‐overflow sections, a power block on the left bank, a surface power house, and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river.  A Profile  18 
  • 22.  The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 KV  rating.  The  construction  took  27  months  and  the  plant  was  synchronized.  DG provided the design engineering services.  8.5   Modernisation of Shivanasamudram Power Channel.  Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of the existing Shivanasamudram Hydro Power Project, had proposed to  increase the water carrying capacity of the power channel upto the Shivanasamudram Balancing Reservoir  and  also  increasing  the  live  capacity  of  the  Shivanasamudram  Balancing Reservoir to cater to the increased needs of the power channel and also the increased needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of planning  for  the  improvements  and  the  detailed  engineering  for  the  same  to Shivanasamudram Power Project is the earliest of the power projects constructed in India,  way  back  in  the  year  1902,  to  supply  electrical  power  to  Kolar  Gold  Mines situated 85 kms away.    Divider wall under Construction                    Originally a 2000m long power channel connecting Shiva head works and the Shiva Balancing  Reservoir  had  been  constructed  with  a  central  earthen  divider  wall  and side slopes lined with  stone pitching.   A Profile  19 
  • 23.   The central divider wall was an earthen bund with stone pitching on the side slopes the overall  dimensions of the divider wall has been 3.7m at the top and 8.2m at the bottom.  Over a  period of the  last 100  years, the  water carrying capacity of the channel had been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, vegetation  growth,  etc.    In  order  to  increase  the  discharge  carrying  capacity  of  the channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of the side slopes was  reset and covered  with RCC lining.  The  vegetation  growth  was completely removed.  After modernization, discharge carrying capacity of the power channel has increased to 59.5 cumecs.  The live capacity of Shiva Balancing Reservoir has  been  substantially  increased  by  desilting  the  reservoir  and  removal  of  weed growth.    In  addition,  DG  was  asked  to  suggest  simple  method  of  desilting  of  the Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made out of a battery of empty steel drums was suggested and used along with ejection of the  silt  by  a  mud  pump  and  a  pipe  line  supported  on  empty  floating  drums,  and taken to the shores.  8.6   Link Canal Mini Hydel Scheme:  Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar project irrigation Canal System, took up the scheme to construct a link canal taking off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of the  link  canal  and  the  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.    A Profile  20 
  • 24.      View of Power House as seen from Downstream    Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar project irrigation Canal System, took up the scheme to construct a link canal taking off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of the  link  canal  and  he  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.    The scheme is simple with minimum civil engineering works. The civil engineering components  comprise  of  a  70m  long  approach  channel,  intake  structure,  gated bypass  weir  with provision of automatic falling shutters, surface power house, tail channel  leading  the  water  back  to  the  branch  canal.  The  installed  capacity  of  the scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The  A Profile  21 
  • 25.  average annual energy  generation  is 10.10 GWHr.  The cost of the scheme  is Rs. 80 Million. The Project was completed in the year 2003 by the Developers M/s Graphite India  Ltd.,  Bangalore,  The  civil  engineering  works  were  contracted  to  M/s  Mysore Construction  Co.,  Bangalore.    The  Planning  and  Detailed  Design  Engineering  was handled by Design Group.    8.7   Captive  Power  Plant  of  5.8  MW  capacity  at  John  Welch  Research  Centre, Whitefield, Bangalore for M/s General Electric:   Overall view of DG Plant   Inside view of Generator Room  Design  Group  was  associated  as  a  major  leader  for  the  Planning,  Detailed Engineering  and  construction  co‐ordination  of  the  5.8  MW  Diesel  Engine  based  A Profile  22 
  • 26.  Captive Thermal Station of the GE India Technology Centre at Bangalore, which has been completed on a time bound schedule of 6 months.  8.8  Windmill Power  M/s.  Doddanavar  Brothers,  who  have  Plan  to  develop  100MW  Wind  Farm  in Chikkodi,  Belgaum  district  of  Karnataka,  India,  availed  our  technical  support  for Engineering of balance of a plant. Critical  main equipment of capacity 10 x 1.5 MW was sourced from M/s. Sinovel, China, while the rest was sourced locally.  Foundation of Wind Mill           DG  assisted  the  developers  by  drafting  technical  specifications,  preparing  data sheets,  floating  tender  for  fabrication  of  towers,  tower  internals  and  electrical right from 690 volts to the grid connection. In addition, assistance was extended for  procurement  activities.  The  Civil  Raft  Foundation  drawings  were  provided after  detail  designs,  for  local  sub‐surface  soil  conditions.  The  entire  assignment was completed in 9 months.            A Profile  23 
  • 27.   Wind Turbine Generator Hub    1. DG designed 33 kV outdoor yard sub‐station at  Wind farm, 33 kV transmission  line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard  pooling  station  and  110  kV  transmission  line  from  pooling  station  to  KPTCL  evacuating 110 kV sub‐station. 2. DG  prepared  technical  specification  for  33  kV  substation  at  Wind  farm,  33  kV  transmission  line,  33  /  110  kV  pooling  station  and  floated  enquiry  for  the  procurement  and  scrutinized  the  Vendor  offers  and  finalized  the  orders  on  suppliers. 3. Vendor drawings and specification scrutinized. 4. Assisted in commissioning the sub‐station and transmission line.  The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x 1.6  MW  GE  machines  have  been  selected,  the  civil  foundation  is  under construction.   8.9  Design of Vacuum Chambers   M/s.  Hind  High  Vacuum  Co.  Pvt.  Ltd.,  specializing  in  manufacture  of  Pressure Vessels  and  Vacuum  Chambers  for  defence,  pharmaceuticals,  and  solar  panels, entrusted to DG, design and  preparation of fabrication  drawings for a Robotic  TIG  A Profile  24 
  • 28.  Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for negative  pressure  of  1  kg  per  sq.cm,  with  a  rider  that  the  defection  of  internal structural members must be limited to 0.5 mm.     The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit chambers, tool chambers, etc. The  robotic arm  moves on rails. The  welding  will  be carried out  under Argon  gas atmosphere.  The chamber  were analysed  using NISA Software package and the analysis has been validated by Indian Institute of Science, Bangalore,  the  pioneer  research  institute,  by  using  ETAB  software.  The  analysis, design, and fabrication  drawings have been forwarded to M/s. Hind High Vacuum Co.  Pvt.  Ltd.  The  fabrication  of  chamber  is  in  advance  state  of  complexion.  The Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the world.   8.10  Design  Group  has  been  successfully  providing  pre‐tender  and  post‐tender services  for  various  public  sector  undertakings  and  several  private  sector undertakings,  in  as  much  as  assessment  of  costs,  detailed  specifications  of  various items  of  work,  conditions  of  contracts,  tender  documents,  tender  analysis  and reports  leading to selection of construction and  supply agencies as  per time bound schedules and needs of clients.  A Profile  25 
  • 29.   Annexure – I 9. LIST OF PROJECTS ON HAND   A. POWER PROJECTS – DETAILED ENGINEERING    Sl.  Name of the Project  Installed  Project  Clients No.  Capacity  Cost in Rs.  in MW  Lakhs  1.  Lower  UHL  SHEP  Project,  13.00  9500  M/s. Trident Power Systems Ltd.,  Himachal Pradesh.  Himachal Pradesh  2.  Singatalur‐Huligudda  Mini  Hydel  18.00  6000  M/s..Tungabhadra Power Projects  Scheme, Karnataka‐  Ltd., Bangalore.  3.  Lambadug Hydro Electric Project,  25.00  12250  M/s. Himachal Sorang Power Pvt.  Himachal Pradesh.  Ltd, Shimla, Himachal Pradesh  4.  Cauvery  Small  Hydel  Project,  24.00  13000  M/s. XS Hydro Energy Private Ltd.,  Karnataka.  Bangalore  5.  Huvinahedagi  Mini  Hydel  24.75  13500  M/s. XS Hydro Power Pvt. Ltd,  Scheme, Karnataka.  Bangalore  6.  Agrahara MHSI & II, Karnataka.  1.475  700  Sarovara Energy Pvt Ltd.,  Bangalore.  7.  Water Supply System for Bharathi  Water  ‐  M/s. Bharathi Cement Corporation  Cement  Plant  at  Cuddapha,  Supply  Ltd Andhra Pradesh  Andhra Pradesh   Scheme  8.  Paudital  Lassa  Hydro‐Electric  24  19200  M/s. Greenko Hatkoti Energy Pvt  Project, Himachal Pradesh.  Ltd., Hyderabad.  9.  Jeori  Lower  Mangalad  SHPP,  15  12000  M/s. Techology House (India) Pvt  Himachal Pradesh.  Ltd., Hyderabad. 10.  Nimishamba  Mini  Hydel  Scheme,  3  1700  M/s. Nimishamba Energy India  Karnataka,  Private Ltd., Bangalore 11.  Kollya  Mini  Hydel  Scheme,  24  19200  M/s. Kumaradhara Power Pvt Ltd  Karnataka.  Bangalore 12.  Chikkodi  Windmill  Project,  100  6000  M/s.Doddanavar Brothers, Belgaum  Karnataka. 13.  Mahan  Hydro  Electric  Project,  24  2000  M/s.Venika Hydro projects Pvt Ltd,  Chathisgard.  Bangalore  Projects on Hand  26 
  • 30.  Sl.  Installed  Project No.  Name of the Project  Capacity  Cost in Rs.  Clients   in MW  Lakhs 14.  Trishuli  Galchhi  Hydro  Electric  75  80000  M/s. Siddhakali Power Pvt. Ltd.,  Project, Nepal.  Nepal 15.  Kukke 1 & 2 MHS, Karnataka.  24  14400  M/s. Kukke Hydro Projects Pvt Ltd,  Bangalore. 16.  Anusha  Mini  Hydel  Scheme,  4  1600  M/s. Dhenu Hydro Pvt Ltd  Andhra Pradesh.  Hyderabad 17.  Navya  Mini  Hydel  Scheme,  2.60  1300  M/s. Mitra Energy Pvt Ltd  Andhra Pradesh.  Hyderabad 18.  Ramya MHS, Andhra Pradesh.  3.80  1900  M/s. Kurnool Energies Pvt Ltd  Hyderabad 19.  Koilakunte  Mini  Hydel  Scheme,  12    M/s. Dhenu Hydro Power Private  Andhra Pradesh.  Ltd., Hyderabad. 20.  Halsur  Diversion  weir  under    400  M/s. Karnataka Neeravari Nigam  Shiggon  lift  Irrigation  Scheme,  Ltd., Karnataka  Savanur, Karnataka 21.  River  Water  Intake  Pump  House  2 X 270  300  M/s. GVK Ltd through M/s. Fichtner  and Approach Bridge, Punjab.  Consulting Engineers (India) Pvt    Bangalore 22.  Machalgho  Multipurpose  Project,    US $ 95  M/s. Gulf Civil Engineering &  Machalgho, Afghanistan.  Million  construction Co. Kabul, Afghanistan 23.  Pashdan  Irrigation  Project,  near    US $ 180  M/s. Hewadwal Group Afghanistan  Heart, Afghanistan. 24.  Tinget‐2  Hydro  Electric  Project  in  81  60000  M/s. AMR—Mitra JV, Hyderabad  Himachal Pradesh 25.  Balance  of  Plant  for  Rafha  Gas  2 x 75 + 2 x    M/s. SSEM Riyadh through M/s. ILF  based Power Plant, Saudi Arabia.  75  Abu Dhabi 26.  Study  Report  on  Gandak  Canal  3 X 5    M/s. WAPCOS New Delhi  HEP  in  Valmikinagar,  West  Champaran District, Bihar. 27.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services  for  Kurtha  SHP  in  Hyderabad  Himachal Pradesh. 28.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services for Kuril SHP in Himachal  Hyderabad  Pradesh.    Projects on Hand  27 
  • 31.   Sl.  Name of the Project  Installed  Project  Clients No.  Capacity  Cost in Rs.  in MW  Lakhs  29.  Detailed  Design  Engineering  3 X 5  1200  M/s. Parvat Hydro Power Pvt Ltd.,  services for Chhoned SHP.  Hyderabad  30.  Detailed  Design  Engineering  3 X 8  19200  M/s. Pavanganga Power Private  services  for  Sangam  SHP  Raichur,  Ltd., Hyderabad.  Karnataka.  31.  Review  Consultants  for  Umjaut  160  100000  M/s ETA Star Ltd,. Dubai  (70MW) & Umduma HEP (90MW)  in Meghalaya   B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT   Sl.  Installed  Project  Clients No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs 1  Bellary Solar Power Project,  5  7500  M/s.Vishrutha Power Pvt. Ltd.,  Karnataka.  Bellary 2  Proposal to bring 10 TMC of Raw  ‐  ‐  M/s. Larsen & Toubro Limited,  water from Sakleshpura to  Bangalore  Chikkaballapur & Kolar District &  T.G. Halli  C. PRE TENDER ENGINEERING SERVICES    Sl.  Installed  Project  Clients No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs  Upper  Narmada  Irrigation  Project  Irrigation  ‐  M/s. Gammon India Ltd. Mumbai  1.  Madhya Pradesh – EPC Bid  Project  60MGD  River  water.  Pipeline‐ ‐  M/s. Gammon India Ltd. Mumbai  Water  2.  73kms for VSNL Ltd, at Salboni in  Supply  West Bengal – EPC Bid  Agra Water Supply Project in Agra  Water  ‐  M/s. Gammon India Ltd. Mumbai  3.  – EPC Bid  Supply  Raw  water  supply  system  for  4  x  ‐  M/s. Gammon India Ltd. Mumbai  Water  4.  300  MW  Raigarh  SKS  Power  Supply  Generation (Chattisgarh) Ltd   Projects on Hand  28 
  • 32.   D. PREPARATION OF TENDER DOCUMENT     Sl.  Installed  Project  Clients No Name of the Project  Capacity  Cost in  in MW  Rs. Lakhs  1.  Dagmara HEP – Preparation of bid  25 x 5  ‐  M/s. Bihar Electricity Board,  document for Civil, E&M, H&M  through M/s. WAPCOS   Transmission Line Component  New Delhi.  works   E. OTHERS  Sl.  Installed  Project  Clients No Name of the Project  Capacity in  Cost in  MW  Rs. Lakhs  1.  Design  and  drawings  of  Electrical  Electrical  ‐  M/s. Doddanavar Nanjinzhao  System  for  Beneficiation  Plant,  Distribution  Mining and Metallurgy (P) Ltd.,  Bagalkot, Karnataka  Belgaum Karnataka.  2.  Detailed  Civil  Engineering  for  Two  Coal  ‐  M/s. Multi Design Infra Works Pvt.  Transfer  points.  Tunnel  in  cut  &  Handling  Ltd. Bangalore  cover,  Box  Pulsing  for  coal  System  conveyor system  for addition  of 2 x  250  MW  to  Sikka  Thermal  Power  Plant in Jamnagar District Gujarat   3.  Design  of  35.58  MLD  capacity  ‐  ‐  M/s. GVPR  Sewage  Treatment  Plant  under  UGD Scheme to Shimoga City    Projects on Hand  29 
  • 33.    Annexure – II (A) 10. ORGANISATION STRUCTURE A. PANEL OF CONSULTANTS/ADVISORS   Sl. No.  Name & Qualification  Designation  1.  Sri C.S. Hebli    Director Technical (Retd),  Chairman &  Karnataka Power Corporation Ltd.  Chief Consultant.  Bangalore.  2.  Sri H.V. Eswaraiah  Director Technical (Retd),  Consultant –Hydro Civil  Karnataka Power Corporation Ltd.,  Designs.  Bangalore.  3.  Sri G.N. Yoganarasimhan,  Director (Retd),  Advisor‐Hydrology.  WRTD, Rourke,  Bangalore.  4.  Sri. P.R. Balasubramanian,   CMD (Retd), FACT,   Advisor‐ Gas Based Power  Triavaneore, Kerala.  Plant.  Bangalore.  5.  Dr.  D.N. Seshagiri, PhD Harvard, USA.   Director (Retd),  Advisor – Engineering Geology.  Engineering Geology,  Geological Survey of India.  6.  Sri.Vishwanath Balachandran,  Advisor‐ Engineering  Director General, GIS (Retd).  Geology.  Chennai.    7.  Sri. Shankar Nesargi  Managing Director (Retd.)  Advisor ‐Wind Energy  VVNL, Bangalore.  8.  Sri. C. R. Venkatesh  Executive Director (Retd.)  Advisor ‐Hydro Power  NHPC Ltd., New Delhi,  Projects.  Bangalore.  9.  Sri. H. Rangarajan, B.Sc, B.E.  Executive Director(Retd),   Executive Director (Elec.)  KPCL, Bangalore.  Panel of Consultants / Advisors  30 
  • 34.    Sl. No.  Name & Qualification  Designation  10.  Sri B.V. Ramakrishnaiah,  Advisor – Gates.  Bangalore.  11.  Sri Srinath Anekal, ME (Civil), MS(Environment)  USA.  Advisor‐Environment.  Bangalore.  12.  Sri. M. M. Kamath,   Advisor – Marine Engineering.  Chief Engineer (Retd),  NMPT, Mangalore.  13.  Sanker Pradesh, M.Tech  (Roorkee),    Consultant‐ Geology.  New Delhi.  14.  Sri. Thippeswamy  Advisor –Water and Waste  Chief Engineer (Retd.)  Water System.  BWSSB, Bangalore.  15.  Sri. V. Suresh Kumar, M.Tech (Khargpur),  Advisor – GIS  Bangalore.    16.  Sri V. Narayanan,  Advisor – Transmission  General Manager, SAE (I) Ltd (Retd),  Lines.  Bangalore.  17.  Sri. Ramanan  Chief Engineer (Retd.)  Consultant‐Hydro  NHPC Ltd., New Delhi,  Bangalore.  18.  Dr. Y. Lingaraju.  Advisor ‐  Ground Water  19.  Sri. Umashankara , B.E. (Civil)    Ex‐Mecon.  Advisor ‐Steel Structure.  20.  Sri. G. Rajagopalan,  Director (Retd),  Consultant – Engineering  Engineering Geology,  Geology  Geological Survey of India, Chennai.  21.  Sri. Krishnappa,  Advisor – Finance.  Financial Controller(Retd),    KPCL, Bangalore.  22.  Sri. Sridhar Prabhu – Legal Adviser   Advisor –PPA  23.  Sri. Venkateshwar Rao  Consultant (Liaison)  New Delhi.  24.  Sri T.S. Somanathan, B.E. (Mech).  Advisor –Welding.  Foremerly NLPC Ltd.,   Panel of Consultants / Advisors  31 
  • 35.    Annexure – II (B)   B. TECHNICAL PERSONNEL    Sl. No.  Name & Qualification  Designation  1  Sri C.S. Hebli, B.E(Hons)  Chairman.  2  Sri B.L. Lakshminarasimha,  Chief Executive Officer              B.Sc., B.E., M.E., MIE, AIV, MASCE.     3  Sri. P.R.Mallikarjuna    Executive Director (Design Head)    M.E.(I.I.Sc.), MIE, MIWRS, MISEO.     4  Sri. Chikkaguddappa  B.E. (Civil)  Director (Project Development)  5  Sri. H.Raghavendra Rao B.E. (Elec)  Director (Electrical Generation.)  6  Sri M.M. Reddy, B.E.(Elecl)  Director (Electrical Power Evacuation)  7  Sri.P.K.Rupangudi, M.E. (Civil)  Director (Gates, Dams design)  8  Sri.U.R.Raghotham, M.Tech. (Civil)   Director (Tunnel and Dam design)  9  Sri.R.Vasudevan B.E. (Elec)  Deputy Director (Water & Waste Water)  10  Sri.K.T.Sreedhara, B.Tech (Civil)  Deputy Director (Irrigation)  11  Sri. Narayana  Achutha  Deputy Director (Hydro civil design)    M.Tech, IIT Kanpur, (Hydraulics)    12  Sri.T.S.Srinivasa, B.E (Civil), M.E  Deputy Director ‐‐Civil (Gas)       13  Sri.Sudarshan Rao B.E. (Elec)  Manager (Electrical Generation)  14  Mr.Gangadar Pattanashetti  Senior Design Engineer (Irrigation)    M.Tech, IIT Guwahati, (Water Resources)    15  Sri. Anantha Murthy,   General Manager (Civil Designs)  B.Sc AMIE (Civil)  16  Ms.Kavitha.M,  B.E, MBA  Administrative Officer   17  Sri. R. Suryanarayana, M.Sc (Geology)  Consultants (Engineering Geology)  18  Ms. Sneha Dandavathe., B.E.(Civil)  Design Engineer (Hydrology)  19  Mr. K.V. Chandrakanth B.E. (Elec)  Design Engineer (Elec.)  20  Mr. Vasanth Kumar B.E (Civil)  Design Engineer (Project Planning)  21  Mr. Shivanand, B.E (Civil)  Design Engineer (Water conductor system)  22  Mr. Pramod Kumar, B.E.(Civil)  Design Engineer (Power House & Tail Race)  23  Mr. Lokesh  B.E (Civil)  Design Engineer (Dam Design)  24  Mr. Sudeendra, M.Tech (Structures)  Design Engineer (Gas Power Plant)  Technical Personnel  32 
  • 36.    Sl. No.  Name & Qualification  Designation  25  Mr. Mohan Kumar, M.Tech (Structures)  Design Engineer (Gas Power Plant)  26  Mr. Puneeth. S, B.E(Elec)  Design Engineer (Elec.)  27  Mr. Naveen V. B.E.(Mech)  Piping Engineer (Mechanical)  28  Mr. Yoghesh K ,B.E.(Civil)  Design Engineer (Planning)  29  Ms. Anusha Hegde K. B.E.(Elec)  Design Engineer (Electrical)  30  Ms. Smitha Nagaraj B.E.(Elec)  Design Engineer (Electrical)  31  Ms. Kumari Diptimayee, B.E.(Civil)  Design Engineer (Irrigation)  32  Ms. Poonam U Jadhav, B.E (Civil)  Design Engineer   33  Mr. Pradyumna K, B.E.(Civil)  Design Engineer (Trainee)  34   Mr. Vinay M V  B.E .(Civil)   Design Engineer (Trainee)  35  Mr. Saravanan S   Design Engineer (Hydro Civil)   36  Ms.Sunita G Galgali, B.E (Civil)  Assistant Design Engineer   37  Sri Mahesh Desai  Manager (Drawings‐ Section)  38  Mr.Prasanna.T  CAD Engineer (Electrical)  39  Mr.M.Shashi Kumar  Junior Design Engineer (Drawings)  40  Mr.Manthesh.M  CAD Engineer (Mechanical Piping)   41  Mr.Praveen.S.Ladva  CAD Operator (Civil)  42  Mr.Nagashetty S   CAD Engineer (Hydro)  43  Mr.Sangashetty V Biradar  CAD Operator (Gas Power Plant)  44  Mrs. Sharadhamma H   CAD Engineer (Civil)    Office Support Staff:    45  Sri. Nagesh, S  Officer / Manager / Accountant  46  Sri Suresh   Accountant  47  Ms. Thara. R  Receptionist  48  Mrs. Geetha N  Personal  Secretary  49  Sri. Ravi Kumar K   Stenographer Cum Secretary  50  Ms. Sowmya A  Personal  Secretary     Technical Personnel  33 
  • 37.    Annexure – III (A)  11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED     A. Preparation of Desk Study Report on Hydro  Power  Projects self identified by DG to  various IPP’s in Nepal and India.      Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  1.  Jaleswar HEP, Nepal.  200.00  US $400  2008  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  2.  Taksindu HEP, Nepal.  270.00  US $540  2008  M/s. Nandadevi Agro‐ Million  Farms Pvt Ltd., Hyderabad.  3.  Syar Khola ‘A’ HEP, Nepal  140.00  US $280  2008  M/s. Dunagiri Pvt Ltd.,  Million  Hyderabad.  4.  Syar Khola ‘B’ HEP, Nepal.  360.00  US $720  2008  M/s. Harmosha Pvt Ltd.,  Million  Hyderabad.  5.  Prok HEP, Nepal.  480.00  US $960  2008  M/s. Nandadevi Pvt Ltd.,  Million  Hyderabad.  6.  Jogimara  Trisuli  HEP,  240.00  US $480  2008  M/s. Haramosh Agro‐Farms  Nepal.  Million  Pvt Ltd., Hyderabad.  7.  Bihi HEP, Nepal.  270.00  US $540  2008  M/s. Dunagiri Agro‐Farms  Million  Pvt Ltd., Hyderabad.  8.  Kappe  HEP,  Arunachal  98.00  73900  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd  9.  Champung  Pobe  HEP,  140.00  105500  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  10.  Changlai  HEP,  Arunachal  48.00  36200  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  11.  Braing  pube  HEP,  48.00  36200  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  12.  Pakke  HEP,  Arunachal  70.00  52800  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  13.  Nargum  HEP,  Arunachal  84.00  63300  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.    14.  Chann  Siang  HEP  66.00  50557  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  Desk Study Report  34 
  • 38.    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  15.  Papu  HEP  Arunachal  110.00  88000  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  16.  Arket Bazar HEP, Nepal.  110.00  US $220  2007  M/s. Parasnath Greenlands  Million  Pvt Ltd., Hyderabad.  17.  Uiya HEP, Nepal.  105.00  US $210  2007  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  18.  Phillim HEP, Nepal.  150.00  US $300  2007  M/s. MMS Steel & Power  Million  Ltd.,Hyderabad.  19.  Amras HEP, Nepal.  150.00  US $300  2007  M/s. Maytas Properties Pvt  Million  Ltd., Hyderabad.  20.  Budhi  Gandaki  HEP,  600.00  US $1200  2007  M/s. RVK Energy Pvt Ltd.,  Nepal.  Million  Andhra Pradesh   Desk Study Report  35 
  • 39.    B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED      Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  1.  Balance  of  Plant  for  Hail‐2  2 x55/75    2011  M/s. Alfanar Riyadh through  Gas based Power Plant, Saudi  M/s. ILF Abu Dhabi  Arabia.  2.  Computation  of  HFL,  Irrigation  4000  2011  M/s. Karnataka Neeravari  elevation capacity of barrage,  Nigama Limited, Karnataka.  design of barrage for Halasur    Barrage  across  Varada  River  ‐  Shiggaon  Lift  Irrigation  Scheme  Dharwar  District,  Karnataka  3.  Detailed  Analysis,Design  Mechanical  5200  2010  M/s. Hind High Vacuum Co.  and  Preparation  of  Pvt. Ltd. Bangalore  Fabrication  of  TIG  Welding    Chamber.  4.  Balance  of  civil  works  for  —  —  2010  M/s. Delkor Technik India  Horizonal  Belt  Filter  Station  Pvt Ltd., Bangalore.  Building  including  Equipment  and  Accessories  Foundation Cango.  5.  Al‐Gubrah  Mobile  SWRO  —  —  2010  M/s. ILF Abu Dhabi.  Plant Civil Design, Muscat.  6.  Dandavathi  Reservoir  Irrigation  10200  2009  M/s. Karnataka Neeravari  Irrigation Project Karnataka  Nigam Ltd., Bangalore  7.  Varahi  Underground  Power  2 x 215  2500  2009  M/s. Karnataka Power  House Stage‐II Karnataka.  Corporation Ltd., Bangalore  8.  Energy  Audit  of  Fiber  Glass  Energy  60  2009  M/s. ICP(India) Private Ltd.,  Product  Manufacturing  Audit  Bangalore.  Units, Bangalore    9.  35  MLD/STP  for  Shimoga  —  —  2009  M/s. GVPRS Hyderabad.  Town,  Shimoga  District,  Karnataka.    Detailed Engineering – Completed  36 
  • 40.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 10.  Balance  of  civil  works  for  18  —  —  2009  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application. 11.  Detailed  Engineering  for      2009  Sharavathy Conductors Pvt  Transmission  line  including  Ltd, Bangalore  Foundation  Designs  for  the  20km,  double  circuit  transmission  line  connecting  Vajamangala  220kV  station  to Kachakola 220kV station. 12.  25  mtr  dia  x  3.0  SWD  —  —  2009  M/s. Delkor Technik India  130TPH  capacity  RCC  tank  Pvt Ltd., Bangalore.  with  tunnel  and  overflow  launder  for  thickener  application 13.  100MW  Wind  Farm  10 x 1.65  10000  2009  M/s.Doddanavar Brothers,  development‐1phase  Belgaum Karnataka  16.5MW  Chikkodi  Belgaum    District, Karnataka 14.  Energy  Audit  of  steel  Energy  50  2008  M/s. Goel Engineering  Fabrication  Manufacturing  Audit  Private Ltd., Bangalore.  Unit, Bangalore. 15.  Design  and Drawing for DM  —  —  2008  M/s. Velath Engineering  Vessel.  Works, Sharjah UAE 16.  Construction  Water  supply  3 x 350  450000  2008  M/s. GMR Energy Limited,  for  Kamalanga  Thermal  Bangalore  Power Plant, Orissa. 17.  Somanamaradi  Small  Hydel  1 x 6  1500  2007  M/s. Narayanapur Power  Project‐  Stage‐II,  in  Raichur  Co. Pvt. Ltd, Bangalore  District, Karnataka. 18.  Balance  of  civil  works  for  —  —  2007  M/s. Velath Engineering  Design  and  Drawing  for  Works, Sharjah UAE  Sulphur Storage Tank. 19.  Design  and  Drawing  of  Flue      2007  M/s. Velath Engineering  Gas  Scrubber  (V‐1507)  Works, Sharjah UAE  Vessel.  Detailed Engineering – Completed  37 
  • 41.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 20.  Detailed  Engineering  for  —  —  2007  Sharavathy Conductors Pvt  Transmission  line  towers  Ltd, Bangalore  including  Foundation  Designs for 50kms of Hiriyur  –  Kudithini  440kV  Transmission line. 21.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Meclin Fabricators  Bhavani  Barrage  Hydro  Private Limited Chennai.  Electric Project I. 22.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Sri Saravana  Bhavani  Barrage  Hydro  Engineering Works  Electric Project II.  company Pvt Ltd. Bhavani  Tamil Nadu 23.  Construction  of  earthen  —  —  2007  M/s. ECC‐‐CPPL Pvt Ltd.,  bund  for  Sarvaraja  Sarovara  Hyderabad. through M/s.  Reservoir  near  Cuddaph,  SM Constructions Bangalore.  Chittur  District,  Andhra  Pradesh. 24.  Shamburi  MHS,  Dakshina  5 x 4.80  9726  2006  M/s.Rithwik Energy  Kannada District, Karnataka.  Generation Pvt. Ltd.  Hyderabad. 25.  Design  and  Drawing  for  —  —  2006  M/s. Velath Engineering  Natural  Gas  Storage  (Buffer)  Works, Sharjah UAE  Pressure vessel. 26.  Balance of Civil Works for 13  —  —  2006  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application. 27.  Balance  of  Civil Works  for 4  —  —  2006  M/s.Rolls‐Royce Energy  x  B35:  40V‐12G  Genset  Gas  Systems India Pvt.Ltd.,  Power Plant at Sudan.  New Delhi 28.  Detailed  Engineering  for  —  —  2006  Sharavathy Conductors Pvt  Transmission  line  Towers  Ltd, Bangalore  including Foundation Design  for  132/66/11  kV  Kolar  Sub‐ Station works.    Detailed Engineering – Completed  38 
  • 42.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 29.  Perla  Mini  Hydel  Scheme,  5 x 4.80  9726  2005  M/s.AMR Power Pvt. Ltd.  Dakshina  Kannada  District,  Hyderabad.  Karnataka. 30.  Nagarjuna  Sagar  Tail  Pond  2 x 25  42500  2005  M/s. STUP Consultants  Dam  and  Hydro  Power  Private Ltd., Bangalore  Station,  Nalgonda,  Andhra  Pradesh 31.  Construction  of  Gandikota  Irrigation  5500  2005  M/s. STUP Consultants  Dam  across  Pennar  River,  Private Ltd., Bangalore  Kadapa, Andhra Pradesh. 32.  Yakla  Micro  Hydel  Scheme  2 x 250  100  2005  M/s. Raj Kumar and  in Dargeling West Bengal.  Company, Bangalore 33.  Somanamaradi  Small  Hydel  2 x 6  4800  2004  M/s. Narayanapur Power  Scheme,  Raichur  District,  Co. Pvt. Ltd., Bangalore  Karnataka. 34.  Hullahalla  Mini  Hydel  3 x 4  4740  2004  M/s.Limbavali Power Pvt.  Scheme,  Mandya  District,  Ltd., Bangalore  Karnataka. 35.  Somavathi  Mini  Hydel  2 x 3  2746  2004  M/s.SRM Power Pvt. Ltd.  Scheme,  Chickmagalur  Bangalore  District, Karnataka. 36.  Gugal  Small  Hydel  Scheme,  4 x 2.5  4000  2004  M/s.SRS Energy Pvt. Ltd.  Gulbarga District, Karnataka.  Bangalore 37.  Design  of  Anchor  Blocks  for  —  —  2004  M/s. Quest‐GE‐Global  Birkapilli  HEP Turkey  (  XLS  Engineering Development  generation)  Centre,Bangalore. 38.  Koynad  MHS,  Kodagu  2 x 2  1800  2004  M/s. Sadguru Saai Energies  District, Karnataka.  Pvt. Ltd., Bangalore. 39.  Design  and  Preparation  of  Tank Farm    2004  M/s. Velath Engineering  GA  drawings  for  following  Works Sharju, UAE.  tanks.  Crude  Oil  Tank  Slop  Crude  Oil  Tank  Crude  Oil  /  Water  Tank  Product  Water  Tank Fire Water Tank  Diesel Oil Tank.  Detailed Engineering – Completed  39 
  • 43.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 40.  110 kV Switchyard  extension  Switchyard  100  2003  M/s. Bhowalaka Steels,  at  Bellary  Steels,  Bellary  Bangalore, through LEG.  District, Karnataka.   41.  Pre‐Cast  RCC  Bridge  over      2003  M/s. Mysore construction Co  Upper  Tunga  barrage  across  Ltd., Bangalore.  River  Tunga,  Shimoga  District, Karnataka. 42.  Architural  and  Structural    300  2003  M/s. Nandalal Mohan Lal  services  for  Construction  of  Jairani Kapur Charitable  Pediatric  Ward  at  Kidwai  Trust Bangalore.  Memorial  Institute  of  Oncology  –  Honorary  Assignment 43.  Link  Canal  MHS  2001,  1 x 1.5  700  2002  M/s.Graphite India Ltd.,  Mandya District, Karnataka.  Bangalore. 44.  Varahi  Tail  Race  MHS,  5 x 7.5  13439  2002  M/s. Sandur Power Co. Pvt.  Udupi District, Karnataka.  Ltd., Bangalore. 45.  Civil  works  for  the proposed  —  —  2002  M/s. ASEA Brown Boveri  132/33kV ODY at INDALCO.  Ltd., Bangalore. 46.  132  KV  Switchyard  Switchyard    2002  M/s. BHEL Bangalore.  Capacitor  Bank  for  HINLCO  Renukot. 47.  132  kV  Switchyard  near  Switchyard  300  2001  M/s.Bharat Heavy Electricals  Samayanallur,  Madurai,  Ltd.  Tamil Nadu. 48.  110 kV Switchyard  extension  Switchyard  300  2001  M/s. BHEL, Bangalore,  connected  with  128  MW  DG  through M/s.. MECON,  set  installation  for  KSEB,  Bangalore  Kozikhode. 49.  110  KV  Substation  at  Substation    2001  M/s. LEG Bangalore  Navakarnataka  Steels,  Bellary District, Karnataka. 50.  66  KV  outdoor  Switchyard  Switchyard    2001  M/s. GEPC Ltd., Bangalore  and  Substation  at  NAL  Bangalore.  Detailed Engineering – Completed  40 
  • 44.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 51.  DG  Plant  at  GE  ITC  Ltd.,  7.4  4000  2000  M/s. GEITC Ltd., Bangalore  Whitefield, Bangalore 52.  Design  of  Supplying  Switchyard  800  2000  M/s.. AEG‐NGEF Limited  Structures  of  220kV  Switch  Bangalore.  yard  for  M/s.  Nippon  Denro  Ispat Ltd., Dolvi, Maharastra. 53.  110  kV  Switchyard  at  Switchyard  250  2000  M/s. Bharat Heavy  HINDALCO,  Renukoot,  Electricals Ltd. Bangalore.  Uttar Pradesh. 54.  Design  of  Supplying  Switchyard  200  1999  M/s. Kirloskar Electric  Structures  for  the  proposed  Company Ltd., Bangalore.  66  KV  Outdoor  Switchyard  at a very Cycles Ludhiana. 55.  Harangi  HEP  at  Harangi  2 x 4.5  3200  1999  M/s. Sulzer Flovel Hydro  Dam,  Kushalnagar  District,    Ltd., Faridabad, Haryana.  Karnataka 56.  Sheshadri Iyer MHS Mandya  3 x 2  1200  1999  M/s. Atria Power  District, Karnataka.    Corporation Limited,  Bangalore. 57.  Remodeling  of  Shiva  Power  —  1000  1998  M/s. Karnataka Power  Channel  at    Transmission Corporation  Shivanasamudram,  Mandya  Ltd., Bangalore.  District, Karnataka. 58.  Dumkar  Hydro‐Electric  3 x 1.5  300  1998  Chief Project Engineer,  Project  at  Leh,  Ladakh,  J&K  Power Development  State.  Corporation Ltd., Kargil,  J&K State. 60.  Civil  works  for  De‐Bottle  —  —  1995  M/s. NGEF Ltd., Bangalore  Neck  Project  MSDS‐4,  Electrical  works  of  Bokaro  Steel Plant, Bihar. 61.  110/33KV  Switchyard  and  Switchyard  300  1989  M/s. NGEF Ltd., Bangalore  Substation  at  Xeldem  Madgon  Goa  for  Goa  Electricity Board.  Detailed Engineering – Completed  41 
  • 45.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 62.  110  KV  Outdoor  Yard  Switchyard  150  1988  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Madras  Refineries  Ltd.,  Manali  Chennai. 63.  132  KV  Outdoor  Yard  and  Switchyard  200  1987  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Petrofills  Co‐operatives  Ltd.,  Kalewar,  Gujrat.    Detailed Engineering – Completed  42 
  • 46.    C. PREPARATION OF DETAILED PROJECT REPORTS     Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW    Kukke  Hydro  Projects  Stage  8 x 3      M/s. Kukke Hydro Projects  1.  1  Dakshina  Kannada  12714    Pvt Ltd., Bangalore  District, Karnataka  2011    Kukke  Hydro  Projects  Stage  4 x 3      M/s. Kukke Hydro Projects  2.  2  Dakshina  Kannada  7113    Pvt Ltd., Bangalore  District, Karnataka  2011    Lower  UHL,  Mandi  District,  2 x 7.5      M/s. Trident Power Systems  3.  Himachal Pradesh  9435  2011  Pvt Ltd., Hyderabad    Dananahalli  MHS,  Mandya    4750  2011  M/s. Punam power Pvt Ltd,  4.  District, Karnataka  2 x 3  Bangalore.    Feasibility  Study  on  water      2010  M/s.Bharathi Cement  5.  Supply  lines  for  Bharathi  Corporation Limited  Cement  Factory  from  Hyderabad  Saravaraju  Sarovar  De  Reservoir  near  Cuddaph  Andhra Pradesh.    Navya  Mini  Hydel  Scheme  2 x 1.3  2281    M/s. Mitra Energy Pvt Ltd  6.  near  Kurnool,  Andhra  2010  Hyderabad  Pradesh    Augmentation  of  Water  —  —    M/s. Hutti Gold Mines Co  7.  Supply  Scheme  at  Hutti  2010  Ltd. Bangalore  Gold  Mines  Raichur  District,  Karnataka    Kollaya  MHS  near        M/s. Kumaradhara Power  8.  Kumaradhara  Dakshina  6 x 4  12000  2010  Co.Pvt Ltd., Bangalore.  Kannada District, Karnataka    Solar  Power  Plant  at  Bellary  5 x 1      M/s. Vishrutha Power Pvt  9.  District, Karnataka  600  2009  Ltd., Bangalore    Anusha  Mini  Hydel  Scheme  2 x 1.9      M/s. Dhenu Hydro Pvt Ltd  10.  near  Kurnool,  Andhra  2778  2009  Hyderabad  Pradesh  11.  Ramya  MHS  near  2 x 2  2900    M/s. Kurnool Energies Pvt  Kurnool,Andhra Pradesh  2009  Ltd Hyderabad  Preparation of DPR  43 
  • 47.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No  Capacity in  in Rs. Lakhs  MW 12.  Kodekal Basaveshwara MHS  2 x 5      M/s. Kodekal Basaveshwara  Near  Narayanapur  Dam,  4500    Power Generation Pvt  Gulbarga  District,  2009  Ltd.,Bangalore  Karnataka.    Magundi  MHS  near        M/s. Shakuntalam Power 13.  Magundi  Village,  Mudigere  3 x 3  5200  2009  Pvt Ltd., Bangalore.  Taluk,  Chikkamangalur  District, Karnataka.    Dabevadi  MHS  Uttara        M/s.Dabevadi Hydel Power 14.  Kannada District, Karnataka.  3 x 4  6271  2008  Pvt. Ltd., Uttara Kannada  Karnataka.    Yadekumari  MHS  Hassan  2 x 10.5  8200    M/s. Sri Maruthi Power Gen 15.  District, Karnataka.  2008  India Pvt Ltd., Bangalore    Devargaddi  MHS,  Uttara        M/s.Baliyan Power Private 16.  Kannada District, Karnataka.  2 x 3  3000  2008  Limited  Bangalore.    Perdur  MHS,  Dakshina  2 x 3  3000  2008  M/s. Dishaa Power 17.  Kannada District, Karnataka.  Corporation Private Ltd.,  Bangalore.    H.  Malligeri  MHS,  near  1 x 1  461  2007  M/s. Venika Green Power 18.  Maddur  branch  canal,  Pvt Ltd., Bangalore.  Mandya District, Karnataka.    Hosamatha  MHS,  near  3 x 1.2  1807  2007  M/s.Vakkal Power 19.  Hosamatha  village  Dakshina  Corporation Ltd.,  Kannada District, Karnataka.  Bangalore.    Devarabetta  MHS,  Hassan  2 x 6.5  3910  2007  M/s. Pinnacle Green Power 20.  District, Karnataka.  Pvt. Ltd., Bangalore.    Addhole  MHS,  near  Bisale  3 x 8  8676  2007  M/s. Trimurthy Power Pvt. 21.  village,  Hassan  District,  Ltd., Bangalore.  Karnataka. 22.  Hongadahalli  Mini  Hydel        M/s. Sri. Maruthi Power  Scheme,  Hassan  District,  18.9  7200  2007  Gen India Pvt Ltd.,  Karnataka.  Bangalore 23.  Mallahalli  MHS,  near        M/s. Nandini Power Co.  Patla,Kodagu  District,  3 x 8.39  9778  2007  Bangalore Pvt. Ltd.,  Karnataka.  Bangalore.  Preparation of DPR  44 
  • 48.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No  Capacity in  in Rs. Lakhs  MW 24.  Hathipathar MHS        M/s. Shasta Investment and  Chathisgarh State.  2 x 6  7000  2007  Initiation Company Pvt Ltd  Hyderabad. 25.  Benchagaddi  MHS,        M/s. Pusala Power  Dakshina  Kannada  District,  12  6000  2007  Company Pvt Ltd.,  Karnataka  Hyderabad. 26.  Talthare  MHS  in  Kodagu        M/s. GM Property  District, Karnataka.  2 x 3.7  3000  2007  Developers Pvt. Ltd,  Bangalore. 27.  Kanchimane  MHS,  Shimoga        M/s. Sagar Power (Dandela)  District, Karnataka  2 x 2  2000  2007  Pvt. Ltd Hyderabad    Tomabattu  MHS,  Shimoga        M/s. Siddhi Vinayaka 28.  District, Karnataka.  2 x 2.5  2500  2007  Spechem (P) Ltd.,  Bangalore 29.  Havinahedgi  MHS,        M/s. XS Power company  Hospet,Bellary  District,  4 x 6  12000  2007  Pvt Ltd Hyderabad.  Karnataka. 30.  Construction  of  weir  across        M/s. Mangalore City  across  River  Nethravathi  at    Corporation, Mangalore.  Thumbe for providing Water  2007    Supply  to  Mangalore  City  Mangalore  District,  Karnataka. 31.  Shamburi  MHS,  near  5 x 4.80  9733  2006  M/s. Rithwik Energy  Shamburi  /  Kamthi  Bazar  Generation Pvt. Ltd.,  village  Dakshina  Kannada  Hyderabad  District, Karnataka, 32.  Varahi  MHS,  near  2 x 4.50  4926  2006  M/s. South Canara Electric  Hosangadi  village  Udupi  Power Ltd., Bangalore.  District, Karnataka, 33.  Handihalla  MHS,  Mandya    12000  2006  M/s.Penna Cement  District, Karnataka.  3 x 8.25  Industries (P) Ltd.,  Bangalore 34.  Sorang  HEP,  near        M/s. Himachal Sorang  Barakhamba  village,  Mandi  2 x 50  58600  2006  Power Pvt. Ltd., Hyderabad  Himachal Pradesh  Preparation of DPR  45 
  • 49.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No  Capacity in  in Rs. Lakhs  MW 35.  Maranahalli  MHS  near  3 x 4.70  5313  2006  M/s.Deepak Cables,  Maranahalli, Hassan District,  Bangalore.  Karnataka. 36.  Iggalur  Barrage  MHS,  near        M/s. Saroj Energy Co. Pvt.  Iggalur  village,  Bangalore  1 x1.50  861  2006  Ltd., Bangalore.  District, Karnataka. 37.  Adishakthi  Maramma  MHS,  4 x 6      M/s. Pioneer Genco Private  Mandya District, Karnataka.  9600  2006  Ltd., Hyderabad 38.  Shalvi  MHS  Shimla  District,        M/s. Oriental Structural  Himachal Pradesh State.  2 x 3.5  4859  2006  Engineers Pvt. Ltd., New  Delhi.    Yatanur  MHS,  near  2 x 3  2000  2006  M/s. SKN Hydro Energy 39.  Gulbarga District Karnataka.  Pvt Ltd.    Yatanur Mini Hydel Scheme,  2 x 2      M/s. SKN Hydro Energy 40  Bijapur District, Karnataka.  1600  2005  Pvt Ltd., Bangalore    Kallaja  MHS,  near  Kallaja  3 x 2.5  3943  2005  M/s.Srishti Power Pvt. Ltd., 41.  village  Dakshina  Kannada  Bangalore.  District, Karnataka.    Kollya  MHS,  near  Kollya  /  6 x 3  9671  2005  M/s.SNC Power 42.  Veeramangala  village  Corporation Pvt. Ltd.,  Dakshina  Kannada  District,  Bangalore  Karnataka.    Neerukatte  MHS,  4 x 3.75  8185  2005  M/s..Sagar Power 43.  Neerukatte Village Dakshina  (Neerukatte) Ltd.,  Kannada District, Karnataka.  Bangalore.    Perla  MHS,  near  Perla  5 x 4.80  9901  2005  M/s. AMR Power Pvt. Ltd., 44.  village  Dakshina  Kannada  Bangalore  District, Karnataka. 45.  Durgadahalla  MHS,  near  2 x 9  9377  2005  M/s. Corporate Hydro  Charmadi  village  Dakshina  Energy Pvt. Ltd.,  Kannada District, Karnataka.  Hyderabad. 46.  Dodda  Betta  MHS,  Hassan  3 x 7  7871  2005  M/s. Sanjeevini Power Pvt.  District, Karnataka.  Ltd., Bangalore. 47.  Somavathi  MHS,  2 x 3  2746  2005  M/s. SRM Power Pvt. Lt.,  Chikkamangalur  District,  Bangalore.  Karnataka.  Preparation of DPR  46 
  • 50.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No  Capacity in  in Rs. Lakhs  MW 48.  Astalakshmi  MHS,  near  2 x 3.5  1816  2005  M/s..Shankaranarayana  Kumbaradi  village,  Power Enterprises Pvt Ltd.,  Chikkamangalur  District,  Bangalore.  Karnataka. 49.  Uyamballi  MHS,  near        M/s. SNS Power Project  Koggedoddi,  Bangalore  2 x 5  5512  2005  Pvt., Bangalore.  District, Karnataka 50.  Surlabi  MHS  in  Somavarpet        M/s. Core Green Hydro  Taluk,  Kodagu  District,  2 x 2  1600  2005  Power India Pvt Ltd.,  Karnataka  Hyderabad 51.  Gondi  MHS  near        M/s. Bhadragiri Power Pvt  Sidlipura,Tarikere  Taluk  2 x 1.5  1500  2005  Ltd., Bangalore.  Chikkamangalur  District,  Karnataka 52.  Detailed  Survey  and        M/s. NTPC Hydro Ltd.,  Investigation  work,  EIA        Noid, NCR Delhi  Study  and  Preparation  of        DPR for following Projects.        a) Belliyur HEP  15  8200  2005  b) Neerukatte HEP  15  8200  2005 53.  Adahole MHS Phase 1 and 2        M/s.  Trimurthi  Power  Pvt  near  Dakshina  Kannada        Ltd., Bangalore.  District, Karnataka.  2 x 12.5  12500  2005 54.  Gugal  Small  Hydel        M/s. SRS Energy Private Ltd.,  Scheme,Gulbarga  District,  3 x 3.34  4958  2004  Bangalore.  Karnataka. 55.  Somanamaradi  Small  Hydel    9600  2004  M/s. Narayanapur Power Co.  Project  on  Upper  Krishna    Pvt. Ltd., Bangalore  Right  Bank  Canal,  Raichur  4 x 6  District, Karnataka. 56.  Baje  MHS  Udupi  District,  3 x 1  1456  2004  M/s. Devar Power Pvt. Ltd.,  Karnataka.  Bangalore. 58.  Kadamane  MHS‐II,  Hassan  2 x 7.5  8500  2004  M/s.Nagarjuna Holdings (P)  District, Karnataka.  Ltd., Hyderabad. 59.  Hullahalli  MHS,  near  2x1  800  2004  M/s.Karnataka Renewable  Hullahalli/  Ramapura  village,  Energy Development Ltd.,  Mysore District, Karnataka.  Bangalore.  Preparation of DPR  47 
  • 51.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No  Capacity in  in Rs. Lakhs  MW 60.  Shivanasamudram  MHS,  1 x 1  452  2004  M/s.Vakkal Power    Malavalli  Taluk,  Mandya  Corporation Ltd., Bangalore.  District, Karnataka 61.  Chikkmandya  MHS,  1 x 0.50  471  2004  M/s.Adichunchanagiri    Chikkmandya,  Mandya  Energy Projects Pvt. Ltd.,  District, Karnataka.  Mandya. 62.  Hullahalla MHS, Dhanagere,  3 x 4  4740  2004  M/s. Limbavali Power Pvt.  Mandya District, Karnataka.  Ltd., Bangalore.    Dinnekere  MHS,        M/s. Vejetha Glazed Tiles 63.  Chikkamangalur  District,  2 x 3  3000  2004  Industries, Hyderabad,    Karnataka.  Andhra Pradesh. 64.  Afzalpur  MHS,  near        M/s. Jasper Energy Pvt Ltd.,  Afzalpur,Gulbarga  District,  2 x 4  4520  2004  Bangalore  Karnataka. 65.  Sonna  MHS,  near  soma        M/s. Jasper Energy Pvt Ltd.,    villege  Gulbarga  District,  2 x 3  3300  2004  Bangalore  Karnataka. 66.  Singatalur‐Huligudda  MHS        M/s. Tungabhadra Power  near  Thimmalapur  village,  3 x 6  6000  2003  Co. Private Ltd., Bangalore.  Bellary District, Karnataka 67  Mannapitlu  MHS,  near  3 x 5  6320  2003  M/s.Bobba Power Projects,  Arambodi  village  Dakshina  Bangalore.  Kannada District, Karnataka. 68.  Mulibettu  MHS,  near        M/s.Mount Kailash Power  Mulibettu  village  Dakshina  2 x 4.5  4282  2003  Projects Pvt. Ltd. Bangalore.  Kannada District,Karnataka. 69.  Kilanjara  MHS,  near  Kalladi  2 x 3  3052  2003  M/s.Phalguni Power    village  Dakshina  Kannada  Projects‐1, Bangalore.  District, Karnataka. 70.  Kolavur MHS., near Niralike        M/s.Phalguni Power    village  Dakshina  Kannada  2 x 4.5  4368  2003  Projects‐2, Bangalore.  District, Karnataka. 71.  Horiabbe  MHS,  near  2 x 3  2596  2003  M/s. S.K. Farms, Hubli.    Siddapur  village  Udupi  District, Karnataka.  Preparation of DPR  48 
  • 52.    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  72.  MGHE  MHS  Shimoga  2 x 10  11500  2003  M/s.Suchindra Investment  District, Karnataka.  & Financial Services,  Bangalore  73.  Abilbiru  MHS,  Hassan  2 x 3  2273  2003  M/s. South‐West Hydro  District, Karnataka.  Power Pvt. Ltd., Bangalore.  74.  Somavathi  MHS,  2 x 3  2698  2003  M/s. SRM Power Pvt. Lt.,    Chikkamangalur  District,  Bangalore.  Karnataka.  75.  Akkihebbal  MHS,  Mandya  2 x 1.25      M/s. Cauvery Hydro  District, Karnataka.  700  2002  Energy Ltd Bangalore  76.  Kadamane  MHS‐I,  Hassan  2 x 4.5  5200  2001  M/s.Paschim Hydro Energy    District, Karnataka.  (P) Ltd., Hyderabad.  77.  Kumudavati  Mini  Hydel  2 x 0.250  361.98    M/s. Krisri Power Tech Pvt    Scheme,Haveri  District,  2001  Ltd, Bellary Karnataka  Karnataka.  78.  Keertihole  MHS  near        M/s. Subash Project &    Kutupuzha  village,Virajpet  3 x 8  7200  2001  Marketing Co Pvt Ltd.,  Taluk,  Kodugu  District  Bangalore,  Karnataka.  79.  Hemavathi  High  Level  2 x 2  600    M/s. Flax India Limited    Canal  MHP,Gorur,  Hassan  2000  Bangalore  District, Karnataka.    Hebbakawadi  MHSMandya    400  1999  M/s. Jayalakshmi Power Co  80.  District, Karnataka.  2 x 1  Private Ltd., Bangalore  81.  Maddur  Canal  MHSMandya  2 x 1.5  500  1998  M/s. Khodays Ltd.,    District, Karnataka.  Bangalore  82.  New  Ganderbal  Hydro        M/s. Chief Engineer PDC    Electric  Project,  near  Jammu,  3 x 15  4000  1996  J&K State. Through M/s.  Jammu and Kashmir State    THC New Delhi.   Preparation of DPR  49 
  • 53.   D. PRE‐FEASIBILITY STUDIES OF POWER PROJECT   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW  1  Baje‐Hiriadka MHS, Udupi    1425    M/s. Aparimita Power  District, Karnataka.  2 x 1.5  2011  Ventures PVt Ltd.,  Bangalore  2  Gulisattenhalli  MHS,    3185    M/s. Aparimita Power  Hasan District, Karnataka.  2 x 2.5  2011  Ventures PVt Ltd.,  Bangalore  3  Kuppahalli  MHS,  Mandya    2123    M/s. Aparimita Power  District, Karnataka.  2 x 2  2011  Ventures PVt Ltd.,  Bangalore  4  Bellur  MHS,  Dakshina    1500    M/s. Muktar Power (India)  Kannada  District,  2 x 1.5  2010  Private Ltd., Goa  Karnataka.  5  Mundaja  Hole  MHS,    1000    M/s. Muktar Power (India)  Dakshina  Kannada  2 x 1  2010  Private Ltd., Goa  District, Karnataka.  6  Ujre  MHS,  Dakshina    1500    M/s. Muktar Power (India)  Kannada  District,  2 x 1.5  2010  Private Ltd., Goa  Karnataka.  7  Kumadvati  MHS  near        M/s. Brigade Infra Pvt Ltd  Anjanapura  2 x 1.5  1400  2010  Bangalore  Chnnarayapatna,  Karnataka.  8  Um‐Lunar  SHEP,  2 x 12  20000  2009  M/s. Green Valliey  Meghalaya  Northeast  Industries Private Ltd.,  State.  Kolkatha.  9  Gurkhi  MHS,  Belgaum    9000  2009  M/s. Aditya Infrastructure  District, Karnataka.  3 x 6  Hyderabad  10  Potli  MHS,  Belgaum  3 x 6  9000  2009  M/s. Aditya Infrastructure  District, Karnataka.  Hyderabad  11  Chagotkallu  MHS,  Raichur    600    M/s. Samvah Energy Pvt Ltd  District, Karnataka.  2  2009  Bangalore  12  Hurley  MHS  Hassan  1  540  2009  M/s. Classic Group Pvt Ltd.,  District, Karnataka.  Bangalore 13.  Kangtangshiri  HEP  2 x 17.5  20000  2008  M/s. Raajratna Metal  Arunachal Pradesh.  Industries, Hyderabad  Pre‐Feasibility Study Report  50 
  • 54.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 14.  Ropum  HEP  Arunachal  40  32000  2008  M/s. Raajratna Metal  Pradesh.  Industries, Hyderabad 15.  Barpu  HEP  Arunachal  135  111645    M/s. Raajratna Metal  Pradesh.  2008  Industries, Hyderabad 16.  Par  HEP  Arunachal  96  79400  2008  M/s. Par Infra Limited,  Pradesh  Hyderabad. 17.  Dardu  HEP  Arunachal  3 x 25  52000  2008  M/s. Dardu Power Pvt Ltd.,  Pradesh.  Hyderabad. 18.  Alavalli  MHS  Hassan  2 x2  1600  2008  M/s. Hotel Maruthi Pvt. Ltd.  District Karnataka.  Bangalore. 19.  Pema  Shelphu  ‐  HEP.  97.5  61900  2008  M/s. Raajratna Energy  Arunachal Pradesh.  Holdings Pvt. Ltd.  Hyderabad. 20.  Marwari  HEP,  8  4000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 21.  Balganga‐II  HEP.  7  3500  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 22.  Doodh  Ganga  /  Meena  6  3000  2008  M/s. R.R. Construction &  HEP. Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 23.  Bernigad HEP,  6.5  3300  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 24.  Vijaya Nagar‐Rampur HEP  20  1000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 25.  Rampur‐Tilwari HEP  25  12500  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 26.  Madya  Maheshwar  HEP  18  9000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad 27.  Kepjog  Mini  Hydel  10  4800  2008  M/s. Vensai Power Projects  Scheme,Jog,  Shimoga  Pvt Limited, Hyderabad  District Karnataka.  Pre‐Feasibility Study Report  51 
  • 55.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 28.  35  MW  Bio  Mass  Power  35  US $ 700,000  2008  M/s. Dass Green Energy  Plant  near  eggbough,  Inc., Boston, USA.  Leeds, U.K 29.  Baipadi  MHS,  Dakshina  2 x 3  2682  2007  M/s. Srishti Power Pvt. Ltd.,  Kannada  District,  Bangalore.  Karnataka. 30.  Hemavathi  Right  Bank    1350    M/s. Sri Maruthi Power Gen  Canal  MHS  Stage‐II.  2 x 1  2007  India Pvt. Ltd. Bangalore.  Hassan District, Karnataka. 31.  Kela  Chavadi    1200    M/s. Delmon Energy Pvt.  MHS,Agumbe,  Shimoga  2 x 2  2007  Ltd. Bangalore.  District, Karnataka. 32.  Hosakambi  MHS,Uttara    1200    M/s. Mysore Mercantile Co.  Kannada  District,  2 x 2  2007  Ltd. Bangalore.  Karnataka. 33.  Dugganballu  MHS,  Uttara    3141    M/s. Mysore Mercantile Co.  Kannada  District,  2 x 2.5  2007  Ltd. Bangalore.  Karnataka. 34.  Tombattu  Hole  MHS,    1000    M/s. Siddhi Vinayaka  Shimoga  District,  1 x 2  2007  Spechem Pvt Ltd.,  Karnataka.  Bangalore 35.  Bairekoppa MHS, Dharwar    3320    M/s. Mysore Mercantile Co.  District, Karnataka.  2 x 2.5  2007  Ltd. Bangalore. 36.  Kalgodu  MHS,    1080    M/s. Saisri Power Projects &  Chikkamagalur  District,  2 x 1  2007  System Pvt Ltd Bangalore  Karnataka.   37.  Sondahalla  MHS,  Uttara    2555  2007  M/s. Disha Power  Kannada  District,  2 x 3.5  Corporation Pvt Ltd  Karnataka.  Bangalore 38.  Kelasi  MHS,  Hubli‐   3036    M/s. Abletech Electro  Dharwar  District,  2 x 2.5  2007  Engineers Pvt Ltd Bangalore  Karnataka. 39.  Kallur  B  MHS,  Gulbarga    6181    M/s. Jasper Energy Pvt Ltd.,  District, Karnataka.  4 x 4  2007  Bangalore    Pre‐Feasibility Study Report  52 
  • 56.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 40.  Gundiadka  Small  5  1790  2007  M/s. Saileela Power Pvt.  Hydropower  Project.  Ltd. Bangalore  Dakshina  Kannada  District, Karnataka. 41.  Kottanadka  Mini  Hydel  2 x 1  1200  2007  M/s. AMR Power Private  Scheme,  Kodagu  District,  Ltd. Bangalore.  Karnataka. 42.  Kannadagal  MHS,Uttara  2 x 12  13200  2007  M/s. Trident power Systems  Kannada  District,  Pvt Ltd., Hyderabad.  Karnataka. 43.  Illva  MHS  Uttara  Kannada  7.5  3771  2007  M/s. Sri Shankara Narayana  District, Karnataka.  Power Corporation Pvt Ltd.,  Bangalore. 44.  Kalgatta  MHS  Dakshina  2 x 2.5  2800  2007  M/s. Samvah Energy Pvt  Kannada  District,  Ltd., Bangalore.  Karnataka 45.  Kubjanadi  MHS  Udupi  2 x 2.5  1750  2007  M/s. PSR Hydro Energy Pvt  District, Karnataka  Ltd., Bangalore. 46.  Manchikeri  MHP  Uttara  3 x 6  6210  2007  M/s. PSR Hydro Energy Pvt  Kannada  District,  Ltd  Karnataka.   47.  Kurkamane  Mini  Hydel  24  8676  2006  M/s. Trimurthy Power Pvt.  Scheme,  Hassan  District,  Ltd. Bangalore.  Karnataka.   48.  Nanniru  Halla,  Shimoga  2 x 2  1800  2005  M/s. Pinnacle Renewable  District, Karnataka  Energy Pvt. Ltd., Bangalore. 49.  Ulippu  MHS,  Udupi  2 x 6  5958  2005  M/s. NTPC Hydro Ltd.,  District, Karnataka  Noida. 50.  Kallaja  MHS,  Udupi  2 x 3  2662  2005  M/s. Srishti Power Pvt. Ltd.,  District, Karnataka  Bangalore.   51.  Devaragundi  MHS,  Udupi  2 x 2  1814  2005  M/s. Astra Infrastructure  District, Karnataka.  Pvt. Ltd., Secunderabad.    Pre‐Feasibility Study Report  53 
  • 57.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 52.  Horabele  MHS,  Udupi  1.00  3663  2005  M/s. Karnataka Renewable  District, Karnataka  Energy Development Ltd.,  Bangalore. 53.  Biligere  MHS,  Udupi  2  851  2005  M/s. Astra Infrastructure  District, Karnataka.  Pvt. Ltd., Secunderabad. 54.  Surlabi  MHS,  Dakshina  2 x 2  1932  2005  M/s.Karnataka Renewable  Kannada  District,  Energy Development Ltd.,  Karnataka.  Bangalore., Bangalore. 55.  Haraga  Hole  MHS,  2 x 1.5  1363  2005  M/s.Karnataka Renewable  Dakshina  Kannada  District,  Energy Development Ltd.,  Karnataka.  Bangalore. 56.  Mukkodlu  MHS  Dakshina  1.50  681  2005  M/s.Karnataka Renewable  Kannada District, Karnataka.  Energy Development Ltd.,  Bangalore. 57.  Sirangahalli  MHS,  Kodagu  0.80  331  2005  M/s.Karnataka Renewable  District, Karnataka.  Energy Development Ltd.,  Bangalore. 58.  Bhadrakali  Mini  Hydel  0.70  344  2005  M/s.Karnataka Renewable  Scheme,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore. 59.  Chapparahalla  MHS  Phase  2 x 7  4200  2005  M/s. Akasha Ganga Energy  I Karnataka.  Pvt. Ltd., Bangalore. 60.  Chapparahalla  MHS  Phase  3  900  2005  M/s. Akasha Ganga Energy  II Karnataka.  Pvt. Ltd., Bangalore. 61.  Katigudde  MHS  Kodagu  2  915  2005  M/s. Delta Power Projects  District, Karnataka.  Pvt. Ltd., Bangalore. 62.  Murukannu  MHS,      2004  M/s. Paschim Holdings  Sakeleshpura,  Hassan  2 x 5.5  4360  private Ltd., Hyderabad.  District, Karnataka. 63.  Balekallu MHS, Karnataka.  2 x 6  3720  2004  M/s. Paschim Holdings  private Ltd., Hyderabad. 64.  Hulikal  Hole  MHS,  Udupi  2 x 2  1700  2004  M/s. Devar Power Pvt. Ltd.,  District, Karnataka.  Bangalore. 65.  Vuddigudda  MHS,  2 x 0.45  591  2004  M/s. Woodae Gooda Coffee  Chickmagalore  District,  Estate Mercara, Kodagu  Karnataka.  District Karnataka  Pre‐Feasibility Study Report  54 
  • 58.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 66.  Kadamane  Mini  Hydel  2 x 5  4500  2004  M/s. Nagarjuna Holdings  Scheme‐II,  Sakeleshpura  Pvt Ltd., Hyderabad.  Hassan District, Karnataka 67.  Durgadahallihalla  Mini  3 x 6  7500  2004  M/s. Nagarjuna Holdings  Hydel Scheme, Karnataka.  Private Ltd., Hyderabad. 68.  Koo Hole MHS, Madapura,  1  461  2004  M/s.Karnataka Renewable  Kodagu District,Karnataka.  Energy Development Ltd.,  Bangalore. 69.  Napanda  Hole  MHS,  1 x 0.50  273  2004  M/s. Karnataka Renewable  Garavale,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore. 70.  Sulugodu  MHS  –  1 x 1  446  2004  M/s. Syed Ibrahim & Sons,  Megaravalli,  Hosanagara  Shimoga.  Taluk,  Shimoga  District,  Karnataka 71.  Koynad  MHS,  Madikeri  2 x 1.75  1880  2004  M/s.Sadguru Sai Energies  Taluk,  Kodagu  Dakshina  Pvt. Ltd., Bangalore.  Kannada  District,  Karnataka. 72.  Beliyur  MHS  South  2 x 7.5  9736  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. NCR New Delhi.  Karnataka. 73.  Nirkatte  MHS  Dakshina  3 x 5  7204  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. New Delhi  Karnataka  74.  Dodda  Betta  MHS  74  19438  2004  M/s. NTPC Hydro Ltd.,  Dakshina  Kannada  Noida. New Delhi  District, Karnataka 75.  Kulkunda  MHS  Dakshina  2 x 9.5  8260  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. New Delhi  Karnataka 76.  Bhimanakallu  MHS  3 x 4.5  6383  2004  M/s. NTPC Hydro Ltd.,  Dakshina  Kannada  Noida. New Delhi  District, Karnataka  77.  Kollya  MHS  Dakshina  3 x 6  9348  2004  M/s. NTPC Hydro Ltd.,  Kannada District, Karnataka  Noida. New Delhi  Pre‐Feasibility Study Report  55 
  • 59.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 78.  Bajimane  MHS  Udupi  2  946  2004  M/s. Falcon Power Pvt. Ltd.,  District, Karnataka  Bangalore. 79.  Devaragundi  MHS,    1814    M/s. Aster Infrastructure  Dharmasthala  Dakshina  2 x 2  2004  Pvt. Ltd. Hyderabad.  Kannada  District,  Karnataka. 80.  Ganadahalli  MHP  Mandya    1915    M/s. SMR power Pvt Ltd.,  District, Karnataka.  2 x 2.5  2004  Bangalore   81.  Biligeri  MHS,  Madikeri,    851    M/s. Aster Infrastructure  Kodugu  District,  2 x 1  2004  Pvt Ltd Hyderabad  Karnataka   82.  Gulgal  MHS,  Gulbarga  3 x 3.3  3623  2004  M/s. SRS Energy Pvt Ltd.,  District, Karnataka  Bangalore 83.  Kadamane  Mini  Hydel      2003  M/s. Paschim Holdings  Scheme‐I,  Hassan  District,  2 x 3  3000  private Ltd., Hyderabad.  Karnataka. 84.  Hachinad  Mini  Hydel  2 x 1  1118  2003  M/s.Karnataka Renewable  Scheme,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore. 85.  Uyamballi MHS, Bangalore  2 x 5  3663  2003  M/s.Karnataka Renewable  District, Karnataka.  Energy Development Ltd.,  Bangalore. 86.  Abilbiru  MHS,  2 x 2.25  1350  2003  M/s. South West Hydro Pvt  Sakaleshpura  Hassan  Ltd., Bangalore.  District, Karnataka 87.  Kunchikal  Falls  MHS,  2 x 2.5  1500  2003  M/s. South Canara Electric  Dakshina  Kannada  Co. Pvt. Ltd., Bangalore.  District, Karnataka. 88.  Hosangadi  Mini  Hydel  2 x 1.5  1230  2003  M/s.Hosangadi Hydro  Scheme,  Dakshina  Power Projects Ltd.,  Kannada  District,  Bangalore.  Karnataka 89.  Upper Kaneri MHS, Uttara    3000    M/s. Sree Swarna Energy  Kannada  District,  2 x 5  2003  Ltd Hyderabad.  Karnataka.  Pre‐Feasibility Study Report  56 
  • 60.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 90.  Dinnekere  MHS,    459    M/s. Jasper Energy Pvt Ltd  Chikmagalur  District,  2 x 0.5  2003  Bangalore.  Karnataka.   91.  Mannapittlu  Hydro‐Power  3 x 3  4540  2003  M/s. Bobba Power Projects  Projects Dakshina Kannada  Pvt Ltd., Bangalore  District, Karnataka 92.  Debewadi  MHS,  2 x 2.5  2569  2003  M/s. Aji Engineering  Chandryapatana,  Hassan  Bangalore.  District, Karnataka. 93.  Pre‐feasibility  Report  on      2002  M/s.Khoday Ltd.,  Wind  Energy  Farm  near  10 x 0.5  2000  Bangalore.  Chitradurga, Karnataka. 94.  KIOC  L  Tailings      2002  M/s. Roche Mining. (MPJV)  Classification  &  Melboune Au strlia  Distribution Project 95.  Dodda  Halla  Mini  Hydel      2001  M/s. Klen & Marshall Ltd.,  Scheme,  Chickmagalore  3 x 6  900  Bangalore.  District, Karnataka. 96.  Singatalur‐Huligudda      2001  M/s. Reddy Veeranna & Co.,  MHS,  Hospet,  Bellary  3 x 6  7200  Private Bangalore.  District, Karnataka.   97.  Horiabbe  MHS,  Udupi  2 x1.5 +  1877  2001  M/s. S K Farm Pvt Ltd.,  District, Karnataka.  1x0.5  Hubli 98.  Hebbakawadi  MH  Sin      2000  M/s. Gilda Investments &  Mandya  District,  3 x 1  600  Financing, Bangalore  Karnataka 99.  Right  Bank  High  Level      2000  M/s. Tungabhadra Power  Canal  MH  Sat  2 x 1.5  400  Co. private Ltd., Bellary.  Tungabhadra  Dam,    Hospet,  Bellary  District,  Karnataka. 100.  2  x  5  MW  Elaneeru  Mini      2000  M/s. Nagarjuna Engineering  Hydel  Scheme,  Dakshina  2 x 5  3600  & Contracts Private Ltd.,  Kannada  District,  Hyderabad.  Karnataka.    Pre‐Feasibility Study Report  57 
  • 61.    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  101.  Elaneeru  MHS    3000    M/s. Nagarjuna Engineering  Chickmagalore  District,      & Corporation Co. Pvt Ltd.  Karnataka.  2 x 3  2000  Hyderabad.    102.  Kabbinale  Mini  Hydel      1999  M/s. Sanicons Engineering  Scheme,  Dakshina  2 x 1  700  & Contracts Pvt Ltd,  Kannada  District,  Bangalore.  Karnataka.  103.  Preparation  of  Executive  2 x 1  600    M/s. Bright Vidyut Co Pvt  Summary  report  on  Ltd., Bangalore  Kattepura  MHS  near  Kattepura  village  Arakalgud,  Hassan  District, Karnataka.   Pre‐Feasibility Study Report  58 
  • 62.   E. PRE‐TENDER SERVICES   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 1.  Indrasagar  Pollavaram  Multipurpose  450000  2011  M/s. ILFS Hyderabad.  Multipurpose  Project  –  A  Project  project of National Interest. 2.  Ghattaprabha  HEP  at  2 x 10  4000  2011  M/s. Megawin  Ghattaprabha Dam, Karnataka  Switchgear Pvt. Ltd.,  EPC bid  Salem Tamil Nadu. 3.  Pre‐Tender  service  for  Canal  Irrigation  —  2011  M/s. Associated  Distribution  network  and  Project  Engineering Consultants  ancillary  structures  & Analysts Pvt Ltd.,  preparation  of  GAD’s  for  Mumbai.  Bridges,  Aqueducts,  Siphons  etc. 4.  Balance of Plant for Rafha  Gas  400  —  2011  M/s. ILF Consulting  Based  Power  Plant,  Kingdom  Engineers Abudabhi,  of Saudi Arabia.  UAE 5.  Balance  of  Plant  for  AL—Jong  400  —  2011  M/s. ILF Consulting  of  Gas  Based  Power  Plant,  Engineers Abudabhi,  Kingdom of Saudi Arabia.  UAE 6.  Pre‐Tender  Services  for  2 x 7.5  —  2011  M/s. Megawin  Electro‐Mechanical Equipment  Switchgear Pvt Ltd.,  for Dumajorhi SHEP  Salem, Tamil Nadu. 7.  Pre‐Tender Services for Balgad  3 x 6.6  —  2011  M/s. Simplex  SHEP, Uttarkhand State  Infrastructures Ltd.,  Mumbai. 8.  Pre‐Tender  Services  for  3 x 7  —  2011  M/s. Simplex  Khutani  SHEP  Uttarkhand  Infrastructures Ltd.,  State.  Mumbai. 9.  Pre‐Tender  Services  for  3 x 3.7  —  2011  M/s. Simplex  Seraghat  SHEP  Uttarkhand  Infrastructures Ltd.,  State  Mumbai. 10.  Balance  of  Plant  for  Qassim  400  —  2010  M/s.ILF Consulting  Gas  Based  Power  Plant  Engineers Abudabhi,  Qassim  Kingdom  of  Saudi  UAE.  Arabia.  Pre‐Tender Services  59 
  • 63.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 11.  Balance  of  Plant  for  Tabouk‐2  2 x 70  —  2010  M/s.ILF Consulting  Gas  Based  Power  Plant  Engineers Abudabhi,  Tabouk,  Kingdom  of  Saudi  UAE.  Arabia. 12.  Basanthpur  and  Saradih  Irrigation  —  2010  M/s. Simplex  Barrage,  Janjgir  District,  Project  Infrastructure Co Pvt  Chhattisgarh.  Ltd., Mumbai. 13.  Kachchh  Branch  Canal  and  Irrigation  —  2010  M/s. Simplex  Rewa Branch Canal‐ Gujarat.  Project  Infrastructure Co Pvt  Ltd., Mumbai. 14.  Bheden  ‐Jharsuguda  Water  Water Supply  —  2010  M/s. Simplex  Supply, Orissa.  Infrastructure Co Pvt  Ltd., Mumbai. 15.  Bansagar‐1  SHEP,  Mirzapur  9.5  4800  2010  M/s. Simplex  District, Uttar Pradesh  Infrastructure Co Pvt  Ltd., Mumbai. 16  Somavathi MHS  9  3000  2010  M/s.Velankeni  Renewable Energy Pvt  Ltd,.Bangalore. 17.  Bandraun  SHEP  Lalitpur  14.0 MW  —  2010  M/s. Simplex  District, Uttar Pradesh  Infrastructure Co Pvt  Ltd., Mumbai.   18.  Condenser  Cooling System for  2 x 300  —  2010  M/s.Gammon India Ltd.,  2  x  300  MW  EMCO  TPP  Mumbai  Warror Maharashtra 19.  Plant  Water  System  Package  2 x 700    2010  M/s.Gammon India Ltd.,  for  Kakrapara  Atomic  Power  Mumbai.  Project 3 & 4 units Gujarat   20.  Dhaulasidh  HEP,  Himachal  40 MW  2000  2010  M/s.Design Group +  Pradesh.  M/s.Feedback Ventures    (Joint Venture) 21.  Kalisindh  Dam  Project  in  Irrigation  4000  2010  M/s.Simplex  Rajastan  Project  Infrastructures Ltd.  Mumbai  Pre‐Tender Services  60 
  • 64.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 23.  Detail  Construction  —  —  2010  M/s. Rithwik Projects  Methodology  for  Vishnugad‐ Pvt. Ltd. Hyderabad  Pipalkoti HEP in Uttranchal.   24.  Meja SHEP, Mirzapur District,  9.00  —  2010  M/s. Simplex  Uttar Pradesh.  Infrastructure Co Ltd.,  Mumbai. 25.  Pre‐Tender  Services  for  Water Supply  20000  2009  M/s. Gammon India Ltd.,  Transportation  of  Water  from  Mumbai  Mahanadi  River  at  Cuttack  to  Paradip  for  Paradip  Refinery  at Orissa. 26.  Pashdan  Irrigation  Project  in  Irrigation  US $ 90  2009  M/s.Hewadwal Group  Afghanistan  Project  Million  Kabul, Afghanistan 27  Almar  Irrigation  Project  in  Irrigation  US $ 190  2009  M/s.Hewadwal Group  Afghanistan  Project  Million  Kabul, Afghanistan 28.  Shah‐wa‐Arus  Irrigation  and  Irrigation  US $ 45  2009  M/s.Hewadwal Group  Hydro  Power  Project  in  Project  Million  Kabul, Afghanistan  Afghanistan 29.  Sea  Water  Intake  System  for  Water Supply  1200  2009  M/s. Gammon India Ltd.  Ultra  Mega  Power  Project  at  Mumbai  Krishnapatnam,  Andhra  Pradesh.‐ 6 x 660 MW 30.  Raw Water Supply System for  Water Supply    2008  M/s. Gammon India Ltd.,  Alumina  Refinery  Expansion  Mumbai  Project  of  M/s.Vedanta  Aluminium  Limited  at  Linjigarh in  Kalahandi District  of Orissa.   31.  Upper Bhadra Irrigation Canal  Irrigation    2007  M/s. Gammon India Ltd.,  Network System Package II  Project  Mumbai   32.  Upper  Bhadra  Irrigation  Irrigation    2007  M/s. Gammon India Ltd.,  Project‐Package  Numbers  1  &  Project  Mumbai  3 Shimoga District, Karnataka.    Pre‐Tender Services  61 
  • 65.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 33.  Plant Water Supply Scheme at  Water Supply  —  2007  M/s. Gammon India Ltd.,  JSW‐Vijaynagar  Steel  Plant  at  Mumbai.  Thoranagal,  Bellary  District,  Karnataka. 34.  Review of draft EPC for Penan  4 x 70  10000  2007  M/s. Hemagiri Hydro  HEP, Sikkim India  Energy Company Pvt  Ltd., New Delhi. 35.  Left  Bank  of  Indrasagar  Irrigation      M/s. Maytas Infra Pvt  (Pollavaram)  HEP  in  Project  2006  Ltd., Hyderabad  Anguluru  Devapatnam  Mandal,  East  Godavari  District, Andhra Pradesh 36.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas Infra Private  (GNSS)  Flow  Canal  Project,  Project  limited, Hyderabad.  Phase‐I, Andhra Pradesh. 37.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas NCC JV  (GNSS)  Flow  Canal  Project,  Project  Private limited,  Phase‐II, Andhra Pradesh.  Hyderabad.   38.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas Infra Private  Project Andhra Pradesh  Project  limited, Hyderabad   39.  Pre‐tender  Services  for  Irrigation  —  2005  M/s. Gammon India Ltd.,  Velagonda  Irrigation  Project,  Project  Mumbai.  Nelagunda  Dristrict  Andhra  Pradesh.   40.  Assistance  in  REQ/RFQ/  Offer  2 x 70  80000  2004  M/s. GMR Energy Ltd.,  for  allotement  of  Badrinath  Bangalore.  HEP  near  Badrinath,  Uttranchal State.   41.  Pre‐Tender  services  for  Irrigation  —  2003  M/s. Simplex  Ainapur  Lift  Irrigation  Project  Infrastructures Ltd.  Scheme.  Mumbai    Pre‐Tender Services  62 
  • 66.               Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 42.  Pre‐Tender  service  for  Irrigation  —  2003  M/s. Chinnanachinuthu  Singatalur  Lift  Irrigation  Project  and Company Bangalore.  Scheme, Karnataka. 43.  Water  Processing  Projects  Water Supply  —  2003  M/s. Movers (India ) Pvt  Balance of Electrical Works  Ltd., Bangalore 44.  Implementation  of  3  x  5  MW  3 x 5  9000  2003  M/s. SEW Constructions  Canal  head  Power  house  on  Ltd., New Delhi.  Left  Bank  Canal  of  Indira  Sagar  Project,  Madhya  Pradesh. 45.  Pre‐Tender  Services  for  Irrigation  12000  2002  M/s. Engineers Projects  Singatalur  Lift  Irrigation  Project  India Ltd., Chennai.  Scheme ‐ 4 Packages.   46.  Pre‐Tender  services  400/220  Substation  1100  2002  M/s. ABB Ltd.,  kV  for  connected  civil  works  Bangalore.  of Switchyard at Nelamangala,    Bangalore for KEB, Bangalore. 47.  Bajemane  MHS  in  Kodagu  2 x 1.5  450  2002  M/s. Falcon Power Pvt  District, Karnataka.  Ltd., Bangalore. 48.  Pre‐Tender  service  for  Greater  Water Supply  10000  2002  M/s. Johnson Eastern  Aizawl  water  Supply  scheme  Power Aizawl Mizoram.  Phase II 49.  Pre‐Tender  service  for  Irrigation  —  2002  M/s. G.J Ferandez  Singatalur  Lift  Irrigation  Project  Secunderbad Andhar  Scheme.  Pradesh. 50.  Dam  remodeling  studies  at  —  —  2002  M/s. Rochie Mining Mt  Lyka  –Lake  at  Kudremekh  India Pvt Ltd., Cochin  Iron Ore Co Ltd.,  Kerala State India 51.  Pre‐Tender  service  for  Irrigation  1200  2001  M/s. NGEF Ltd.,  Periyapatna  Lift  Irrigation  Project    Bangalore  Scheme. 52  Pre‐Tender service  for Balance  1.5  150  2001  M/s. Mysore  of  Civil  Works  for  Link  Canal  Construction Co Pvt  MHS,  Mandya  District,  Ltd., Bangalore.  Karnataka.  Pre‐Tender Services  63 
  • 67.     Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 53.  Pre  –  Tender  Services  for  DG    $ 40 Million.  2001  M/s. National Trading  Captive Plants at Yemen.    Co Ltd., Yemen.  a) Sana’s (Option 1)  3 x 5  b) Sana’s (Option 2 )  4 x 5  c) Hodaidah  2 x 5  d) Taiz  2 x 5  e) Aden  2 x 5 54.  Pre‐Tender service for Cooling  Water Supply  —  2001  M/s. Mega Engineering  Water  System  at  Enterprises, Hyderabad  Ramagundam  TPP,  Andhra  Pradesh. 55.  Technical  Apprisal  report  on  10  2500  2001  M/s. PSM Spinng Ltd.,  DPR  of  Dummagudem  MHS  Hyderabad  across  river  Godavari  at  Dummagudam,  Andhra  Pradesh. 56.  Pre‐Tender  service  for  2 x 2.5  2000  2001  M/s. Krishi Power Tech  Siraguppa  MHS  near  Pvt Ltd., Bellary,  Kenchanagudam  Village,  Karnataka  Siraguppa  Taluk  Bellary  District, Karnataka. 57.  Upper  Bhadra  Lift  Irrigation  Irrigation  —  2001  M/s. SNC, Bangalore.  Scheme, Karnataka.  Project 58.  Preparation  of  RFQ  for  500  22500  2000  M/s. Bay West Power &  Thermal  Power  Plant  at  Energy Pvt Ltd.,  Baroda for M/s. GPCL. Gujarat  Bangalore. 59.  Pre‐Tender  services  for  Co‐ 75  30000  1999  M/s. Bay West Power &  generation  Captive  Power  Energy Pvt Ltd.,  Plant  for  M/s.  Duncan  Bangalore.  Industries  Ltd.,  at  Khanpur.  Uttar Pradesh. 60.  Chuzachen  HEP  in  East  2 x 40  —  1999  M/s. Nagarjuna  Sikkim State,  Construction Co Ltd.,  Hyderabad.  Pre‐Tender Services  64 
  • 68.   Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW 61  Technical  Evaluation  Report  —  —  1999  M/s. Bhrouka Power  on  Hemavathy  LBC  MHS,  Corporation Ltd.,  Hemavathy  river  bed  unit  &  Bangalore.  Varahi Tail Race Scheme. 62  Pre‐Tender  services  for  60  28000  1998  M/s. Bay West Power &  Captive  Power  Plant  at  Energy Pvt Ltd.,  Kapasan,  Rajasthan  for  M/s.  Bangalore.  HZL, Udaipur, Rajasthan. 63  Pre‐Tender  services  for  DG  40/60  24000  1998  M/s. Bay West Power &  Plant  for  Kerala  State  Energy Pvt Ltd.,  Electricity Board. Kerala  Bangalore. 64  Pulichintala  Irrigation  Project,  Irrigation  1200  1998  M/s. Gammon India Ltd.,  Andhra Project.  Project  Mumbai. 65  Upper  Tunga  Canal  Head  Irrigation  4000  1998  M/s. Karnataka  Regulator,  Shimoga  District,  Project  Neeravari Nigam Ltd.,  Karnataka.  Shimoga, Karnataka. 66  Pre‐bid  services  for  Koilsagar  Irrigation  —  1998  M/s. Nagarjuna  Lift Irrigation Scheme, Andhra  Project  Construction Co Ltd.,  Pradesh.  Hyderabad. 67  Pre‐Tender services for 132 kV  Switchyard  670  1995  M/s. GEPC, Bangalore.  Switchyard  at Bidanasi,  Orissa  for M/s. OPGC. Ltd. 68  Pre‐Tender  services  for  Illumination  100  1995  M/s. GEPC, Bangalore.  connected  Civil  Works  of  Port  Yard Lighting at  Chennai Port  for Ennore Coal Port Project.   69  Haliyal Lift Irrigation Scheme,  Irrigation  160  1995  M/s.Mysore Construction  Karnataka.  Project  Co., Bangalore.   70  Pre‐Tender  services  for  132 kV  900  1994  M/s. GEPC, Bangalore.  Substations  for  MSEB.  Maharashtra.    Pre‐Tender Services  65 
  • 69.    Sl.  Name of the Project  Installed  Project Cost  Year  Clients No.  Capacity in  in Rs. Lakhs  MW  71  Pre‐Tender  services  for  400 kV/220  600  1994  M/s. GEPC, Bangalore.  connected  civil  works  of  kV    Substations  at  Meerut  and  Mandola  for  PGID.  New  Delhi.  72  Bhima  Lift  Irrigation  Project,  Irrigation  22000    M/s. Gammon India Ltd.,  Gulbarga District, Karnataka.  Project  Mumbai.    Pre‐Tender Services  66 
  • 70.   F. Due Diligence Report‐Completed      Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  1  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Palloli  MHS  –River  Pvt Ltd., Hyderabad.  Gurpur.  2  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Alehalli  MHS‐River  Pvt Ltd., Hyderabad.  Bhadra  3  Technical  Apprisal  Report  3  1500  2011  M/s. Greenko Energies  for  Shiragola  MHS‐River  Pvt Ltd., Hyderabad.  Bhadra,  Shimoga  District,    Karnataka.  4  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Kuskal  MHS  –River  Pvt Ltd., Hyderabad.  Bhadra,  Shimoga  District,  Karnataka.  5  Technical  Apprisal  Report  3  1500  2011  M/s. Greenko Energies  for  Jaladurga  MHS‐River  Pvt Ltd., Hyderabad.  Tunga,  Hospet,  Bellary  District, Karnataka.  6  Technical  Apprisal  Report  4.5  22500  2011  M/s. Greenko Energies  for  Kantamangala  –River  Pvt Ltd., Hyderabad.  Payaswini,Puttur  District,  Karnataka.  7  Updating of Financials DPR  2 x 4.5  5200  2011  M/s. Continental Energy  for Magundi MHS  Services Pvt Ltd.,  Hyderabad.  8  Concept  report  for  Water  —  —  2010  M/s. Kelsatek Solutions  Recovery  from  Slime  Pond  Pvt Ltd., Bangalore.  at  JSW  Hosepet,  Bellary  District, Karnataka.  9  Chunchi  Doddi  MHS,  3 x 3.559  4800  2010  M/s. Greenko Energies  Bangalore  Rural  District,  Pvt Ltd., Hyderabad.  Karnataka.  Due Diligence Report  67 
  • 71.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 10  Bhadra  Left  Bank  Canal  1 x 1.5  1051  2010  M/s. Shree Matha  MHS,  Shimoga  District,  Vaishnavi Infra‐Build Pvt  Karnataka.  Ltd., Mysore. 11  Jalkoti  SHEP  in  Himachal  2 x 6.25  10400  2010  M/s. Prajwal Energy Pvt  Pradesh.  Ltd., Mumbai 12  Hemavathy MHS,      2010  M/s. Greenko Energies  a) Left Bank Power  4 x 4  8000  Pvt Ltd., Hyderabad.  House      b) River Bed Power  2 x 4    House    Hassan District, Karnataka    4000 13  Himani  Chamunda  SHEP  2 x 4.75  8000  2010  M/s. Prajwal Energy Pvt  in Himachal Pradesh.  Ltd., Mumbai 14  Dadupur  MHS,  near  4 x 4  6400  2010  M/s.Bhoruka Power  Dadupur, Harayana.  Corporation Pvt Ltd.,  Bangalore. 15  Techno‐Economical  165  110000  2010  M/s. Saraswathi Power  Viability  Study  on  DPR  of  Co Ltd., Hyderabad.  Dikku HEP, Nagaland. 16  Somavathi  MHS,  2 x 3  2963.65  2010  M/s. Velankani  Chikkamagalur  District,  Renewable Energy Pvt  Karnataka.  Ltd.,Bangalore. 17  Technical  Review  Report  4 x 6  12000  2009  M/s.Bhoruka Power  for  Chaya  Bhagawati  SHP,  Corporation Pvt Ltd.,  Karnataka.  Bangalore. 18  Due  Diligence  report  for  7.5  5300  2009  M/s. Hemavathy Power  Sarju  I  MHS,  Bageshwar  & Light Pvt Ltd.,  Uttarakhand.  Bangalore. 19  Sarju  II  MHS,  Bageshwar  15  10500  2009  M/s. Hemavathy Power  Uttarakhand  & Light Pvt Ltd.,  Bangalore.   20  Sarju  III  MHS,  Bageshwar  10.5  7500  2009  M/s. Hemavathy Power  Uttarakhand  & Light Pvt Ltd.,  Bangalore.  Due Diligence Report  68 
  • 72.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 21  Upper Sethi HEP, Nepal.  127  100000  2009  M/s. Venika Hydro    Projects Pvt. Ltd.,  Bangalore. 22  Upper Modi HEP, Nepal.  30  30000  2009  M/s Maytas Infra Ltd.,  Hyderabad. 23  Paudital  Lassa  SHP  near  24  12600  2008  M/s. Tulajaa Bhavani  Roharu  Town  in  Himachal  Energy Projects Pvt Ltd.,  Pradesh.  Mumbai. 24  Palor‐I  MHS  near  village  2 x 1.5  1300  2008  M/s. Tulajaa Bhavani  Lana  Palor  Sangarh  Taluk,  Energy Projects Pvt Ltd.,  Simor  District,  Himachal  Mumbai.  Pradesh   25  Palor‐II  MHS  near  village  2 x 2.25  1306  2008  M/s. Tulajaa Bhavani  Lana  Palor  Sangarh  Taluk,  Energy Projects Pvt Ltd.,  Simor  District,  Himachal  Mumbai.  Pradesh.   26  Gundiadka  SHPP,  Dakshin  2 x 3.5  1925  2007  M/s. Sun Technics Pvt  Kannada  District,  Ltd., Bangalore.  Karnataka. 27  Burhi Gandaki HEP, Nepal  4 x 150  227618  2007  M/s. GMR Energy Ltd.,  New Delhi. 28  Augmentation  of  water  Water  3940  2007  M/s. Mangalore City  supply  to  Mangalore  City.  Supply  Corporation, Mangalore  Dakshina  Kannada District,  Karnataka.  Karnataka. 29  Kubjanadi  MHS,  near  2 x 2  1600  2007  M/s.PSR Hydro Energy  Coondapura, Karnataka.  Pvt. Ltd., Bangalore. 30  Marigundihole  MHS,  near  2 x 1.5  1250  2007  M/s.PSR Hydro Energy  Kadaba,  Chikkamagalur  Pvt. Ltd., Bangalore.  District, Karnataka. 31  Venurhole  MHS,  near  2 x 2.5  2000  2007  M/s.PSR Hydro Energy  Moodabidri,  Dakshina  Pvt. Ltd., Bangalore.  Kannada District Karnataka 32  Manchikere  MHS,  near  2 x 8.25  8000  2007  M/s.PSR Hydro Energy  Yellapura,Uttara  Kannada  Pvt. Ltd., Bangalore.  District, Karnataka.  Due Diligence Report  69 
  • 73.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 33  Techno‐Economical  100  60000  2007  M/s. Sunflag Iron and  viability  Study  for  Hanol‐ Steel Co Ltd., New Delhi.  Tiuni in Uttranchal. 34  Baliyantrahole  MHS,  2 x 1  800  2007  M/s.Kodagu Power Pvt.  Kodagu District, Karnataka.  Ltd., Bangalore. 35  Middle Kolab SHP, Orissa.  3 x 6  9000  2006  M/s.Meenahshi Power  Ltd., Hyderabad. 36  Review  of  Hydrology  and  2 x 48  80000  2006  M/s. Indu Projects Ltd.,  Power  Potential  for  Dik‐ Hyderabad.  Chu HEP in Sikkim 37  Samal  HEP  near  Kule  5 x 4  10000  2006  M/s.. KSK Energy  village  Angul  District,  Ventures Ltd.,  Orissa.  Hyderabad. 38  Techno‐Economical  180  108000  2006  M/s. Simplex  viability  study  for  Bajoli  Infrastructures Ltd.,  Holi  Project  near  Holi  Mumbai.  village, Himachal Pradesh.   39  Techno‐Economical  95  60000  2006  M/s..Sunflag Iron & Steel  viability  study  for  Dibbin  Co.Ltd., New Delhi  HEP, Arunachal Pradesh.   40  Kuthupuzha  MHS  in  2 x 2  200  2005  M/s. Raphidiam Power  Kodugu  District,  Supplies Pvt Ltd.,  Karnataka.  Madikere 41  Technical  appraisal  on  80  34700  2005  M/s. Nagarjuna Hydro  Bharmour  HEP  in  Energy Pvt Ltd.,  Himachal Pradesh.  Hyderabad. 42  Preliminary  Assessment  of    200  2005  M/s. Rahmhita Power  Power  Potential  for  650    Project Pvt Ltd.,  Machgunda  MHS,    200  Hyderabad.  Shalipura Branch Canal 1 &  600  2, Karnataka. 43  Kelagur  MHS  Kodagu  2 x 2  1600  2005  M/s Karnataka Strips Pvt.  District, Karnataka.  Ltd., Bangalore. 44  Study of Power Potential  in  —  —  2004  M/s. NTPC Hydro Ltd.,  Netravati  Basin  Western  Noida, NCR New Delhi.  Ghats, Karnataka.  Due Diligence Report  70 
  • 74.    Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  45.  Project Appraisal for 40MW  40  20000  2004  M/s. Alpha Energy  Biomass  based  Thermal  System Ltd., Chennai  Power  Plant  in  Andhra  Tamil Nadu.  Pradesh.  46.  Techno‐Economical  2 x 48  65000  2004  M/s. Nagarjuna hydro  Viability  Study  on  DPR  Energy Pvt Ltd.,  Jorthrang  Loop  HEP  Hyderabad.  Sikkim.   Due Diligence Report  71 
  • 75.   Certificate  72 
  • 76.   Certificate  73 
  • 77.       Certificate  74 
  • 78.           Certificate  75 
  • 79.          Certificate  76 
  • 80.        Certificate  77 
  • 81.          Certificate  78 
  • 82.         Certificate  79 
  • 83.        Certificate  80 
  • 84.        Certificate  81 
  • 85.        Certificate  82 
  • 86.              Certificate  83 
  • 87.        Certificate  84 
  • 88.             Certificate  85 
  • 89.        Certificate  86 
  • 90.         Certificate  87 
  • 91.  Certificate  88 
  • 92. 13. Brief Profile of Advisors / Consultants (a) Advisors  Mr. H.V. Eswaraiah, is retired from Karnataka Power Corporation Limited, working as freelance  Consultants  for  large  Hydro  Power  Project.    Design  Group  is  availing  his technical  expertise  on  implementation  of  Hydro  Power  Project  related  to  contracts, QAC, PMC etc.  Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian Institute of Science, had  a  brief  stints  as  lecturer,  worked  in  State Public  Works  Department  before joining Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971, and  retired  as  Technical  Director  in  the  year  1997.    He  has  extensively  dealt  with  all aspects  of  Hydro Power  Projects,  starting  from  field  investigation,  preparation  of  PFR, DPRs,  Bid  preparation, technical  evaluation,  award  of  work,  as  Executive  Engineer, he has worked on  a 100m high Supa Concrete gravity Dam, achieved production level of 1000  cumecs  per  day  of  concreting  production  and  laying  in  the  design.    At  corporate level,  in  charge  of  long  term  Power  Project  Planning,  advising  Managing  Director,  on settlements  of  dispute  and  claims  of  contracts,  direct monitoring  of    all  Projects  under construction, procurement and movement of Coal, Cement and Steel.  In his tenure, he has handled 15 Hydro Power Projects including a Thermal and Wind Projects.  He had wide experience in dealing with World Bank Funded Projects.  After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor.  He is  also  assisting  Banks  as  Lender  Engineers  for  various  Mini  Hydel  Scheme  funded  by Banks.  Advisor  89 
  • 93.  Mr.  Shankar  V.  Nesargi,  B.E.  (Mech),  ME  (WR),  Joined  Karnataka  Power  Corporation Limited,  as  an  Engineer  in  the  year  1970  and  retired  as  Managing  Director  of  VVNL, subsidiary  Company  of  KPCL  in  the  year  2005.    As  an  Assistant  Engineer  handled investigation works of Kali Hydro Electric Project ( 6 x 135 MW)  including drift works. Incharge  Executive  Engineer  for  construction,  O  &  M  of  4  x  210  MW  Raichur Thermal Power Plant, he had extensive explosure to Coal Plant, Railways, WTP, Boiler,    Turbines  etc.    During  this  period,  he  was  elevated,  as  Superintending  /  Chief Engineer.   In the  year  2003, he  was  appointed  as  Executive  Director totally  incharge  of Planning  Infrastructure  works  of  4  x  350  MW,  Bidadi  Gas  Based  Power  Plant,  near Bangalore.    Subsequently,  he  was  appointed,  as  Managing  Director,  Vishveswaraiah Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R &  M  works.    During  his  tenure  in  KPCL,  he  has  attended  several  National  and International Seminar and travel world wide.  After retirement he was a freelance consultant to various foreign Companies in Uganda, Spain etc., traveled extensively in these countries as technical consultants.  Presently,  he  works  as  a Managing  Director  of  DB  Global  Energy  Limited,  a Company dedicated  to  Wind  Power  Generation  as  IPPs,  executing  100  MW  of  Windfarm  near Belgaum, Karnataka.    Advisor  90 
  • 94.  Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had one  year  training  in  Nuclear  and  Allied  subjects  in  Bhabha  Automic  Research  Centre, Bombay.  Thereafter, he was absorbed in the department worked for a decade in various departments  of  BARC,  before  joining  Engineers  India  Limited,  New  Delhi  in  the  year 1978.   Thereafter joined  Gas  Authority  of  India  Limited  and  worked  till  1990.    He  was selected,  as  Director  in  Neyveli  Lignite  Corporation  Ltd,  in  1997.   He  was  Chairman  / Managing  Director  of  Fertiliser  and  chemicals,  Travancore  up  to  his  retirement  in  the year 2002.  He  is  a  freelance  consultant,  presently  independent  Director  of  REC,  India  Rare  Earth Ltd., (Department of Atomic Energy).  His  areas  of  expertise  is  overall  Corporate  Management  of  Large  Organisations, Development  of  Engineering  Expertise  in  the  Organisation,  Conceptualising  of  Turn Around  strategies,  over  view  the  implementation  of  the  Projects  from  Concept  to Commissioning, preparation of quality Project Reports, Proper appraising of the Project Reports,  Resolving  Arbitration  Issues etc.,  by  applying  the  expertise  and  experience  in managing    various  projects  in  Nuclear  Chemicals,  Fine  Chemicals,  Petrochemicals, Hydrocarbons, Gas  Processing  Plants, Cross  Country Pipelines, Thermal  power  plants,Fertilizer Complexes etc. Advisor  91
  • 95. Mr.  B.V.  Ramakrishnaiah,  hydraulic  Gates  Consultants,  was  ranked  4th  in  Bachelor  of Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian Institute of Science, Bangalore, in the year 1964.  He joined CW& PC, New Delhi, soon after  his  Master  degree  in  the  year  1962,  worked  mainly  in  design  and  drawing  of Hydraulic Gates for Irrigation and Hydro Power Projects.  In the year 1966 joined M/s. Triveni  Structurals  Ltd.,  Naini,  Allahabad,  served  over  13  years  in the  organization,  as Gates and Penstock design specialist.  During his tenure, he has designed cylinder Gates for Ramanaganga Project, which is only one of its kind in the country, operated by a 70 tonnes  capacity  Hydraulic  hoist.  Another  gate  operated  by  650  tonnes  capacity Hydraulic  hoist  is  designed,  as  High  Pressure  slide  gates,  for  Baggi  control  works, Sundernagar,  Himachan Pradesh, High  Pressure  fixed  wheel  Penstock  emergency  gate was  designed  for  Beas  Project,  Punjab  for  a  clear  vent  size  of  10  feet  x  21  feet,  for  a design head of 110m.  This gate carries a total load of 2160 tonnes which is transferred to concrete through 12 wheels, 150 tonnes capacity hydraulic hoist  operates the gate.  Crest radial  gates  for  Itezhitezhi  Dam,  Zambia,  has  been  designed  which  was  vetted  by SWECC  Swedan.    Similarly,  Batten  outlet  radial  gates  had  been  designed  for  Great Reeha Power Project Tanzania.  He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy firm, where he has designed over 100 gates of various shapes and sizes.  To name a few, designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro Electric Project in Andhra  Pradesh,  first time spherical  plain  bearings  were  used  for the Tirunion  instead of  normal  bronze  bushes.    Designed  one  of  the  tallest  Penstock  gate  of  size  6.75m  x 15.75m in the country, for Lower Metur Project in Mettur Tamilnadu.  As  regards  Penstocks,  Pipes,  2.743m  dia  for  a  static  head  of  405m  was  designed  for Kaufe  Gorge  HEP  in  Tambia  Africa,  4.88m  dia  to  withstand  static  head  of  51.2m  was designed  for  Bowatena  Power  Project  in  Sri  Lanka.    He  has  distinction  of  designing record breaking gate size and penstocks of large diameter in India.  He is ranked as a top class gate designer in India.  Advisor  92
  • 96. Mr.  V.  Balachandran,  is  a  retired,  Deputy  Director  General  and  HOD  GSI,  Southern Region.  He  is  a  freelance  senior  Geologist  advising  Design  Group  on  Engineering Geology  for  Large  Hydro  and  Irrigation  Projects  in  India  and  Abroad.  Presently pursuing his doctoral thesis in Osmania University.  Mr. V. Balachandran, after Masters’ degree in Geology joined Geology Survey of India in the  year  1971,  as  Junior  Geologist  and  retired,  as  Deputy  Director  General  and  HOD, GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is spent in Engineering Geology, involved in conducting Preliminary Investigation to post construction  stage,  his  services  spread  all  over  India,  including  Supervision  and guidance  to  Project  Authorities.  A  few  Projects  where  he  was  directly  involved  are  : facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme, upto  upper  Siwalik  incoherent  sand  rock  with  plethora  of  problems  such  as  seepage, collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam project which was under investigation for a protracted period (40 years). By identifying source  of  seepage  at  Kadampari  Pumped  storage  scheme,  the  energy  generation  was substantially  enhanced.  Adopted  hydraulic  jacking  of  upper  Kodayan  tunnel  and suggested  other  remedial  measure.  Geological  investigation  was  extensively  carried  at MAPS  Kalpakkam  and  Kundankulam  for  Nuclear  Power  Corporation  Ltd.,  Extensive field  services  were  carried  out  with  special  reference  to  Seismological  studies  led  to clearance  for  Kundakulam  Atomic  Power  Plant.  Initiated  studies  on  Korada  Atomic Power  Plant  and  studies  on  Plutonium  Fast  Breeder  Reactor  Project  under  Madras Nuclear  Power  Plant  leading  to  clearance  to  the  Project.  Carried  out  Mega  thrust Tsunami  Hazard  studies  in  South  India.  Attended  several  National  and  International seminars,  and  presented  several  technical  papers,  Traveller  World  Wide,  including undergoing  training  in  Harza  Engineering,  USA  and  National  Resources  (Canada)  and Geological Survey of Canada at Vancouver Calgary and Ottawan Canada.  Advisor  93 
  • 97. C.R.  Venkatesh  B.E.  (Civil),  M.E.  (Str),  obtained  first  class  with  distinction  in  Masters’ degree,  from  the  renowned  Indian  Institute  of  Science,  Bangalore.    He  worked,  as lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist Cement  Research  Institute  of  India,  New  Delhi,  before  joining  National  Hydro  Power Corporation  Ltd.,  as  Manager  in  the  year  1981,  worked  till  his  retirement  in  the  year 2004.    During  his  tenure  in  NHPC  Ltd.,  he  has  risen  from  the  post  of  Manager  upto Executive  Director.    As  a  Chief  Engineer,  he  was  in  charge  of  Dulhasti  Hydro  Power Project  (3  x  130  MW).    As  an  Executive  Director,  Contract  Division,  managed  all procurement  activities  and  Civil  E  &  M  Works  Contracts.    Under  R  &  D  wing,  he  has evolved  cost  analysis  of  complicated  works,  suggested  various  means  for  cost  cutting.  He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in Sweden,  under  went  Advanced  International  Hydro  Power  Develop  Project;  in Germany / Netherland attended Advanced Management Development Training.  In  India,  under  went  specialized  technical  training  in  Reflection  Photo  elasticity  and strain  gauge  technique,   Dam  Safety,  Geotechnical  instrumentation etc.   He has  visited number of Foreign Countries. Deputed to Pakistan, participated in technical discussions, on Indus Watering Treatment. Had meeting with Arbitrators in connection with Internal Arbitration Tribunal on Chamera HEP Contract disputes.  He has 44 technical papers to his credit.  His research paper on De‐silting basin, won a special Certificate of merit by Central Board of Irrigation and Power, New Delhi.  Since,  his  retirement,  his services,  as  freelance  consultant  is  being  used  by  major  Civil Contractors for dispute redressal and Arbitration.  Advisor  94 
  • 98. Mr. M.C. Rangarajan, is a free lance Electrical Engineering Consultant for various organisation including M/s. Design Group Project Consultants Pvt Ltd.  Mr.  M.C.  Rangarajan,  after  obtaining  Bachelor  of  Engineer  degree  from  Indian Institute  of  Science,  in  the  year  1969,  joined  Karnataka  Power  Corporation  as Electrical  Engineer,  and  retired  in  the  year  2005,  after  36  years  of  rich  in experience  Hydro  Power  generation.  Important  assignment  to  name  as  Design and  Layout  of  Hydro  and  Thermal  Projects  sizing  of  units,  firming  up  of technical  specification,  bid  documents,  bid  processing,  contract  management, project  monitoring,  inspection  of  components,  Vendors  Plant.  He  was  involved in  construction  of  following  Hydro  Projects  to  name  a  few,  Nagjhani  (6  x  135 MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x 60  MW),  Kadra  Dam  Power  House  (3  x  50  MW),  and  Kodasalli  Dam  Power House  (3  x  40  MW).  In  addition  looked  after  O  &  M  of  Sharavathy  HEP  (1035 MW), Varahi underground Power House (230 MW), R & M works etc.  As a senior executive Chairman of Core  group for Q & AC of EPC Contract for 500  MW  Bellary  Thermal  Power  Plant,  Power  Purchase  agreement  with  State level  distribution  Companies.  He  has  presented  several  technical  papers  in National and  International Conference; visited difference type of Power Houses and manufacturer units in India and Abroad.  Advisor  95
  • 99.  S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975 to 1984, after a brief stinct, as lecture in NIE Mysore.  Joined NHPC, in the year 1985, and retired in the year 2009, as General Manager.  He had an exposure in all branches of Hydro Power Project, from Survey, Investigation, Preparation  of  PFRs  and  DPRs,  bid  documents,  to  Civil  designs,  construction  of HEPs.  He  was  past  as  GM  Consulting  and  Bussiness  Development  Division,  dealt  with  Tidal Power  Project,  Infrastructure    development  in  Andaman  and  Nicobar  Island,  Varzab Power  Plant  in  Tajikistan  and  raising  of  Dhankari  dam  in  Port  Blair,  Andaman  and Nicobar  Island.    Till  his  retirement,  he  had  handled  over  5000  MW  of  Hydro  Power development in various capacities sparing across the length and breadth of India for 10 HEPs in total.  He had a short stint in design and engineering of Power transmission line in  North  East  State.    He  is  a  freelance  consultant  advising  various  IPPs  in implementation of small Hydro Projects.  Advisor  96
  • 100.  Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in Power Plants, and complicated heavily loaded structural steel works. Presently advisor to Design Group.  Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and retired in the year 2009, as Deputy General Manager. As a steel structural designer, he was actively involved in design of Steel Plants of large capacity in India, such as Bokaro Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant in  Kerala,  Defence  Project  –  NSTL  at  Vizag  A.P.,  Kudremukh  Iron  Ore  Project,  Essar Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external Coal  handling  system  for  TNEB  at Chennai,  Birla  Copper  expansion  phase  II.  HGPL  – Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka, Essar Integrated Steel Plant at Hazira. More than half million tones of Steel design and fabrication of steel structure has been done under his guidance. He has been deputed to foreign  countries  by  MECON  for  inspection  and  fabrication  in  Countries  like  China, Germany,  Korea,  he  has  also  attended  several  work  shops  conducted  in  India  and Abroad.  Advisor  97 
  • 101.  Mr.  V.  Narayanan,  is  a  transmission  line  design  and  construction  expert.    Advisor  to Design Group on assignments pertaining to transmission lines, as and when required.  After  his  Bachelor  degree  in  Civil  Engineering,  obtained  Masters  degree  in  Civil  and Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the year 1963.  soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission Tower, Civil Foundation and other allied works.  He has involved designs and drawings for various voltages from 66 kV to 220 kV to many Electricity Boards in India.  Subsequently  1973  onwards  assumed  the  change  of  Production  Manager  in  M/s.  SAE Factory  at  Jabalpur.    He  was  deputed  to  M/s.  SAE,  Milano,  for  being  trained  in  their works  at  Lecco,  on  production engineering,  design  and  drawings,  Testing  Stations.   In the year 1978 was sent to Australia to acquaint with the working of Testing Station.  At Jabalpur  Plant,  made  a  commercially  viable  Testing  Station  in  par  with  International Testing Station.  He was responsible for increasing the production capacity to 30,000 MT per annum from 8000 MT.  As a General Manager responsible for design and testing of many 400 kV and 500 kV DC lines.  After his retirement worked in several International Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc.  He has wide technical knowledge in Transmission lines from concept to commissioning.  Advisor  98
  • 102.  Mr. C. Channakeshava, Ph.D, is an freelance advisor to Design Group on Computer aided Mathematical  modeling  for  3D  complicated  structures  for  carrying  out  precision  analysis and design of Dams etc.  Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of Science,  Bangalore,  obtain  his Ph.D  in  the same  Institution  in the  year  1988.   He  was Post Doctral  Research  Associates  in  University  of  Cincinnati  Ohio,  USA,  Louisiana  State University,  USA,  extensively  worked  on  Finite  Element  Method  applied  to  Civil Engineering works.  He has illustrious academic background, topper in Universities in India and Abroad.  In  Bangalore,  joined  a  reputed  EMRC  Software  Company  (USA)  team  to  develop  world class NISA Software tool used extensively for Non‐linear analysis.  His field of interests are computational  mechanics,  Finite  Element  Analysis,  Boundary  Element  Analysis,  Analysis and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design.   Advisor  99 
  • 103.  Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory Affairs and Compliance. Design Group is availing in services in PPA related matter.  Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise related to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of Karnataka  Chamber  of  Commerce  and  Industries,  Advisor  to  India  Wind  Turbine Manufacturers  Association.  Advisor  Renewable  Energy  Developer  Association, Karnataka  (REDAK).  Former  State  Council  Member  –  IWPA,  in  addition  during  his practice, he has represented India’s Wind Energy Sector, before the Supreme Court; first and  only  representative  of  the  Wind  Energy  Sector  to  represent  before  the  Central Electricity  Regulatory  Commission  (CERC),  New  Delhi.  Represented,  on  several occasions,  on  behalf  of  IPP’s,  he  has  argued  before  REC’S  on  fixation  of  Tariff, standardization of PPA’s renewable Power Purchase obligations for Wind Project.  Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services Company  with  a  market  capitalization  of  over  US$  30  Billion  for  Green  Power procurements  in  Southern  States.  Engaged  for  advisory  and  tariff  filing  by  first  ever electric cooperative society and distribution license in Karnataka.  Advisor 100
  • 104. Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers on  environmental  and  sustainable  Development  Areas  including  climate  change  and CDM  aspects  etc.,  Design  Group  seek  his  advice  on  specific  field  like  Environmental impact assessment, CDM due diligence and Environmental Protection project.  Mr. Srinath N. Anekal after obtaining  Bachelor / Master degrees in Civil  Engineer from Bangalore  University  pursued higher  studies  in  University  of  Florida,  Gainsville,  USA, was  awarded  Master  degrees  in  Environmental  Engineering  Science  in  the  year  1993.  Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO 14000  Environmental  Management  System  CII  India,  hazardous  waste  management operational practice, USA.  He has traveled widely in  USA, Inida, Banglaesh, Maruitius and  Mozambique.    Where  he  worked  extensively  in  the  field  of  Environment,  Energy and  Water.    He  demonstrated  experience  in  conceptualizing,  design,  promoting  and implementing innovative projects in the area of waste minimization, clean Technologies, Environmental  protection,  Urban  Water Supply  and  sanitation, Renewable  Energy  and clean  Development  Mechanism.    He  was  with  executing  Agencies  for  implementing reform oriented projects funded by world Bank, DflD, KfW, European Commission and Danida.  He has contributed to the development of country level strategies; especially on mainstream new development concepts, through conduct and participation in seminars and  workshops  and  effective  interaction  with  all  stake  holders  in  Government,  Non‐Governmental Organization and Private Sectors.  Advisor  101 
  • 105. (b) Consultants    Mr.  C.S.  Hebli,  B.E.  (Hons),  after  obtaining  Bachelor  degree  in  Civil  Engineer  with distinction, joined Bombay public works Department, in the year 1954, worked as Junior Engineer Planning  Minor  Irrigation  Project,  after  reorganization  of  Karnataka state,  his services  were  lent  to  Hydro  Electrical  Civil  Projects  in  the  year  1959,  as  Assistant Executive  Engineer,  involved  in  investigation  and  preparation  of  Bedthi,  Aghanashini, Mahadayi,  Kalinadi  (910  MW)  Projects.    HECP  was  converted  into  a  dedicated  power generation  company  called  Karnataka  Power  Corporation  Limited,  fully  owned  by Government of Karnataka to execute.  He raised from ranks upto first Technical Director of the Company, retired in the year 1988 with 37 years of rich power project experience.  During  his  service,  activity  involved  in  Kalinadi  HEP  (910  mw),  Sharavathi  HEP  (835 MW),  Varahi HEP  (239  MW).   Raichur TPS  (5 X  210  MW)  from  concept to  completion, involved  in  long  term  planning  of  Projects,  Hydro  policy  in  the  state  etc.    After retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro and  Gas  based  Power  Plant  aggregating  to  2000  MW,    joined  as  Chairman,  Design Group  Project  Consultants Pvt  Ltd.,  Company  established  in  1979,  technically  guiding staff    strength  of  52  technocrates  effectively  involved  in  technical  advise.    Policy decisions, Company affairs etc.  Consultant  102
  • 106. Mr.  B.L.  Lakshminarasimha,  B.Sc.,  B.E.,  M.E.,  M.I.E.,  F.I.V.,  M.A.S.C.E.,  after  obtaining  Master  degree  in  Civil  Engineer  from  Birla  Institute  of  Technology,  Pilani,  premier  educational  Institution  of  India  (collaboration with M.I.T., USA,) after a short stint in Messers. Gerame and Binny Limited, joined Karnataka Power Corporation Limited, as a Civil Engineer in 1975, resigned after 20 years of  service,  acquired technical knowledge in drafting of bid documents for large Hydro Power Projects, interpretation of Contract Clauses, resolved disputes, formulated schedule of rates, design of Surface Power House, framed structure through  3  D  modeling  etc.  Designed  and  constructed  KPCL  Corporate  office  building.  Assisted  Company’s  legal  advisors  in  Arbitration  proceeding/Contract  disputes,  in  the Court of Law etc Founder member Design Group, established in 1979.  What turned out to be one man show in 1979 has grown to a large consultancy firm of repute in India and Abroad.    Over  3  decades  of  existence,  developed  an  exclusive  team  of  dedicated consultants having 40 years and above experience in Power and Irrigation Projects from concept to completion.  Recently developed a dedicated team of engineers to extend design engineering services in  Water  and  Waste  Water  Treatment  Plants.  Successfully  steered  the  company  in obtaining KEMA ISO Certification, maintained consistent profitability over the decades.  Executed  number  of  Joint  Venture  Partnership  in  India  and  Abroad,  such  as  CPRI, WAPCOS,  ILF,  for  implementation  of  Large  Projects  successfully,  signed  a  few  design engineering  assignment  contract  in  neighbouring  countries  such  as,  Saudi  Arabia, Dubai, Muscat, Ghana, Nepal, Sri Lanka.      Consultant  103
  • 107.   Mr.  P.R.  Mallikarjuna,  after  obtaining  M.E.,  from  prestigious  Indian  Institute  of Science  in  the  year  1969,  worked  in  various  capacities  in  a  Public  Sector  /  Private  Companies,  before  joining  Karnataka  Power  Corporation in the year 1971, as Group Engineer (AEE), and retired in the  year  2000  as  Technical  Director,  with  an  illustrious  career  spanning  34  years  in various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years, after his retirement. During his tenure in the KPCL, he was the head of Design wing and handled  all  major  Hydro  Projects,  Thermal  Power  Plants  from  concept  to commissioning.  Over  1200  MW  of  Power  Projects  has  been  investigated  under  his guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of Power  Projects  have  been  implemented  under  his  guidance.  He  has  attended  several National and International seminars, and contributed dozens of technical papers. After his retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira Sagar  Polavaram  Hydro  Electric  Project  in  Andhra  Pradesh,  on  behalf  of  Andhra Pradesh  Irrigation  Department,  including  obtaining  clearances  from Central  Electricity Authorities,  New  Delhi.  He  was  involved  in  detailed  engineering  of  Nagarjuna  Sagar Tail Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage II (2 x 115 MW).   From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for planning and design of Hydro Electric Projects and Large Irrigation Projects, etc.  Consultant  104 
  • 108.    Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University  College  of  Engineering,  Bangalore  in  the  year  1971  worked  in  State  Government  Organisation,  before  joining  Karnataka  Power  Corporation in the year 1972 as Engineer and retired in the year 2004  as  Chief  Engineer  with  an  illustrateous  carrier  spanning  32  years  in various cadres. During his tenure in the KPCL, he was head of Design  wing consisting of  engineers  of  all  discipline,  handled  all  major  Hydro,  Thermal  Power  Plants  from concept  to  completion.  Attended  several  National  and  International  seminars,  and contributed  several  technical  papers.  He  is  member  of  Gate  Committee  since  1996, formed  by  the  Govt.  of  Karnataka  for  design,  fabrication  erection  &  commissioning  of prestigious  Alamatti  Dam  Gates  and  hoists.  Even  to  date,  he  is  in  the  panel  for inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty member  on  the  continuing  education  to  the  Engineers  of  the  State,  organized  by  The Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale dams, of Sharavati Hydel Scheme assigned to him by the Karnataka Power Corporation. After  his retirement,  he  was  also  involved  in  detailed  engineering  of  Nagarjuna  Sagar tail  pond  Dam  and  Varahi  underground  Power  House  –  Stage  II  (2  x  115  MW)  and  a major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation Company.   From 2010 onwards he is associated with DG responsible for implementation of Hydro Electric and Irrigation Projects.   Consultant  105 
  • 109. Mr.  Chikkaguddappa  (C.G.  Appa),  joined  Design  Group  Project  Consultants  Pvt  Ltd.,  in  2005,  as  a  Director  Hydro  Power  Project  Planning  and  river  basin  study.    He  has  travelled  neighbouring  countries, to advice IPP’s on Planning of Hydro Power Project.  Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the year  1973,  as  an  Engineer,  raised  to  the  level  and  retired  in  the  year  2005,  from Corporation after 38 years of long services.  From the day one, he was involved in river basin development in the Corporation, identifying and Planning Hydro Power Projects in  entire  length  and  breadth  of  Karnataka  state.    Mostly  dealt  with  Investigation  of HEP’s  like Shivana Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data collection  for  Hydrology,  surface  and  sub‐surface  details  for  preparation  of  DPR  for major  HEP’s    like  MahadayI  (318  MW),    Cauvery  Scheme  (270  MW),  Tamankal  (800 MW), Almati Dam Power House (280 MW),  (Mekedath 1400 MW), Kali stage – III (1200 MW)  Bedsti  stage  II  (400  MW),  Aghanashini  (600  MW),  Gundiya  High  heads  scheme (400)  conceived  if,  as  a  run  of  the  river  scheme,  study  proposed  for  Pumped  storage scheme at the existing Sharavathy complex (1000 MW) AND Kali Complex (1200 MW). He was one of the Authorities in river basin studies in Karnataka.  In addition, identified and prepared DPR’s for Mini Hydel Scheme of less than 25 MW.  He joined  Design  Group  Project Consultants Pvt  Ltd.,  in the  year  2005,  responsible  for identifying and preparation of Desk Study Report for over 12,000 MW of Hydro Power Projects in neighbouring Country Nepal.   Consultant  106
  • 110.   Mr.  Raghavendra  Rao  H  after  obtaining  BE  degree  in  Electrical  Engineering  from  National  Institute  of  Engineering,  Mysore  in  the  yarer  1972  worked  in  Medium  Voltage  Switch  Gear  industry  as  development  and  production  Engineer  till  1977  before  joining Karnataka  Power  Corporation  Ltd,  the  premier  organization  carrying  out  design, construction,  operation  and  maintenance  of  power  plants  in  the  state  of  Karnataka,.  He retired  as  Superintendent  Engineer  (Electrical)  from  KPCL  in  the  year  2006.  During  his tenure in KPCL he worked in the areas of design, construction, testing and commissioning and  maintenance  of  Hydro  and  Thermal  power  plants  mainly  in  the  areas  of  Electrical equipments and systems of power plants and the tenure included working at both power plants and the corporate design office.      The  specialized  areas  are  control  and  protection  and  he  was  a  member  of  Protection committee of Southern Regional Electricity Board.   After  joining  DG  in  2008  he  is  in  charge  of  Engineering  of  Electro Mechanical  systems  of Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of Energy Efficiency, India.       Consultant  107 
  • 111. Mr.  M.M.  Reddy  is  expert  in  substation  Layout  and  Electricals  designs  from 33 kV upto 400 kV. His services are being used by Design Group in  substation segment of Electrical Engineering.   Mr.  M.M.  Reddy  after  obtaining  Bachelors’  degree  in  Electrical  Engineering  from Bangalore  University,  in  the  year  1968,  worked  in  various  capacities  in  various organizations.  He  has  worked  in  NGEF  from  1968  to  1997  for  29  years  and  taken voluntary  retirement  in  the  year  1997,  as  Divisional  Manager.  During  his  tenure  in NGEF, he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV from  designing  to  commissioning  of  sub‐stations  on  EPC  basis.  Under  his  guidance, about  600  MW  outdoor  Switchyard  from  33  kV  to  220  kV  have  been  designed  and commissioned. He has undergone training in high voltage outdoor yard sub‐stations in AEG – Telefunken, Germany for 6 months.  In  May  1997,  he  joined  M/s.  Design  Group  Project  consultant  Pvt  Ltd.,  and  he  is responsible  for  designing  of  out  door  yard  substation  and  transmission  lines.  He  has designed  and  commissioned  various  switchyards  and  transmission  line  for  Hydro Power Project, to name a few major Projects:   i) Varahi Tail Race (37 MW – 110 kV ODY)  ii) Narayanpur Project Phase – I and II (18 MW ‐ 66 kV ODY)  iii) Singatallur – Hulligudda (18 MW – 110 kV ODY)   He has designed and commissioned balance of equipment for 15 MW Windmill Project.    Consultant  108 
  • 112. Mr R. Vasudevan is a water utility management specialist with over 40  years  of  experience  in  Design  Construction  &  Operation  of  Water  utility  services  from  the  source  to  the  consumer,  presently  full  time  consultant of Design Group.  He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining Bangalore  Water  Supply  and  Sewerage  Board  in  the  same  year,  he  worked  in  various capacities  and  retired  as  the  Chief  Engineer  during  2010.  He  was  involved  in  all  the major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of Bangalore  in  1971,  and  had  become  a  giant  utility  by  2010  supplying  over  900  MLD water to over 7 Million residents. He  was  associated  in  Cauvery  water supply  Scheme stage  I  to supply  135  MLD  water from  River  Cauvery,  in  establishing  pipe  fabrication  and  laying  activities;  Later  in  the stage  II  of  another  135  MLD  Project  he  was  in  charge  of  Electrical  system  Design  and Construction;  In the III stage  which  was  a  larger  270  MLD  Project  he  was  in  charge  of complete Electrical and Hydro‐Mechanical components of the project from tendering to completion. In the subsequent Stage IV‐Phase I Project which was with external funding, He  was  responsible  for  total  cross‐country  steel  pipeline  of  1950mm  Diameter  and  90 Kilometers  long,  and  later  in  the  installation  of  Sewerage  pumping  stations  and  the electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years of his service he was responsible for Securing ODA loan of INR 34000 Million from JICA for  Stage  IV  Phase  II  projects  of  500  MLD,  selection  of  project  consultants,  tendering selection and award of contracts for all water supply components.   In the  course  of  his  service  he  has  participated  in  various  workshops  and seminars  on pumps  ,  cavitation,  cross‐country  pipeline  design,  water‐hammer  studies  and  control, water  treatment,  wastewater  treatment  and  sludge  disposal,  project  management,  Consultant  109 
  • 113. international  contracts,    leakage  reduction  and  distribution  improvement,  flow measurement, tariff structuring, urban planning , reuse and conservation, etc.   He  led  the  Technical  team  which  presented  ‘Innovative  Practices  in  Revenue Management’  initiative  by  BWSSB  to  the  Department  of  Urban  Development  and Secured  the  First  Prize  in  National  Urban  Water  Awards,  2009,  from  the  Hon’ble President of India, in August 2009.  Vasudevan  has  designed  pumping  systems  for several  lift  irrigation  pumping  systems, electrical  substations  and  surge  protection  to  pipeline  for  the  Consultancy  Centre  of BWSSB  from  1995  to  2007.  Many such  projects  have  been  commissioned  in  the  last  10 years and are in operation.  He  also  handled  an  assignment  on  ‘alternative  methods  of  infrastructure  finance  by Private  Sector,  Infrastructure  Bonds,  and  developing  Public‐Private  Partnerships’  in 2009.   He  also  secured  an  MBA  from  ICFAI  Dehradun  with  Finance  as  optional  subject.  On retirement  from  Service  he  joined  Design  Group  as  Water  Supply  Consultant  in September 2010.  Consultant  110 
  • 114.    Mr. U.R. Raghotham after obtaining M.Tech from Mysore University    in  the year 1974 worked as design engineer with the architects M/s Karekar  and  Sundaram  for  one  year  and  joined  Karnataka  Power  Corporation  Ltd., in 1975.    During  the  service in  KPC  Ltd.,  he has  worked in  the  design  team  for  Supa  Dam for 5 years  and  then  worked  as  AEE  (Construction)  in  Supa  Dam  for  7  years starting  from foundation level of the spillway and power blocks to the completion of the Dam.    Further  he  was  in  charge  of  construction  of  Ghataprabha  Power  House.    From  1989 onwards he worked in the design office as AEE and EE  for the planning and  design of various  Hydro  Electric  projects  including  Kadra  dam  and  Sharavathi  Tailrace  Project.  Since 2003, he is working as a consultant and was involved in the design of  Nagarjuna Sagar  Tail  Pond  Dam  Project,  Gandikota  dam  project,  Lower  Jurala  project  of  Andhra Pradesh, Varahi Underground Power House (2x115MW) and many other projects.   He was  involved  in  the  preparation  of  DPR  for  Indira  Sagar  Polavaram      Hydro  Electric Project (960MW) and in obtaining clearance from CWC and CEA.   Consultant  111
  • 115. Mr.  G.  Penchalaiah,  after  retirement  works  as  free  lance  Consultants,  for  various investigation agencies in flow monitoring in river regime pre‐construction Investigation works in large Irrigation Projects.  Design Group is utilizing his services for overseeing, Fielding investigation works in large Irrigation Projects in India and Abroad.    Mr.  G. Penchalaiah  after  his  graduation  in  Civil  Engineering  from  Sri.  Venkateshwara University  in  1970, joined  Central  Water  Commission,  as Civil  Engineer  and  retired  in the year 2007, as Director.  He has vast experience in Water Resources Project Planning, specially  large  Irrigation  Project  investigation,  Hydrology,  Computation  of  yield, Development  of  Irrigation  dam  and  associated  Irrigation  Networks,  preparation  of Detailed  Project  Report.  He  was  posted  to  various  States  in  India,  was  familiar  with available  yield  in  various  river  for  Irrigation  utilization  to  improve  the  Agricultural Sector  and  Water  Management.    He  was  deputed  to  CEA,  New  Delhi,  responsible  for design  of  structures  and  cost estimates  for Thermal Power Project.   He  had made topo map studies, interlinking river,  water balance study, etc.  As a Senior Engineer worked on  Indo‐Nepal  Joint Projects,  namely Pancheshwar  Multipurpose Project, head  quarter at  Kathmandu,  Nepal.    Involved  in  preparation  of  DPR,  cost  estimates,  preparation  of Infrastructure  Planning  for  major  Power  /  Multipurpose  Projects,  such  as  Poornagiri, Rupaligad etc.  Advisor  112 
  • 116. Mr.  Suryanarayana,  after  his  retirement  on  Deputy  General  Manager  ‐  Geology  from Karnataka Power  Corporation Limited,  works as freelance  Consultant.   He  is a  part  of Design  Group  being extensively  used  his  expertise  in  Engineering  Geology  in  various assignments undertaken,  on job to job basis.  My.  Suryanarayana,  after  obtaining  Masters’  degree  in  Geological  Science,  joined Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007, as Deputy General Manager – Geology.  During his tenure, he was involved in most of the  Hydro  Power  Project  implemented  by  Karnataka  Power  Corporation  Limited  in Karnataka, to name a few Rammam HEP (120 MW), Rolep HEP (60 MW) and Chakung Cha HEP (60 MW) all in Sikkim; 80 meter high Chakra Rock‐fill Dam: Varahi HEP (460 MW).    Involved  in  preparation  of  DPR  for  Gundiya  Hydel  Scheme  (400  MW), Shivasamundram  Seasonal  Scheme  (270  MW),  Mekedatu  Multipurpose  Project  (360 MW).  He is also involved in ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation Project  involved  4  km  of  tunneling  etc.    Apart  from  this,  he  has  wide  experience  in advising  developers  /  IPPs  in  implementation  of  Mini  Hydel  Scheme  of  25  MW  and below all over India.  Consultant  113
  • 117. Mr.  K.T.Sreedhara,  after  obtaining  B.E  (Civil),  degree  from  Vikram  University,  Ujjain,  in  the  year  1970.  worked  as  design  Engineer  in  M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971  to November 1973. The works dealt in this period are Designs of Bridges  and  Industrial  Structures  and  Buildings.  Then  joined  M/s.  Karnataka Power  Corporation  Ltd.,  a    public  sector  undertaking  of  government  of  Karnataka  on  28.11.1973 and worked  Up to 31.01.2006 i.e. 32 years and 2 months in various capacities as AE,  AEE,  EE,  SE  &finally    retired  as    I/C  Chief  Engineer  on  superannuation  from  the Karnataka  Power  Corporation  service.  During  this  tenure  in  KPCL  worked  in  the  civil designs  wing  on  the  design  of  Gravity  dam  (concrete),  Earthen  dams,  water  conducting System and in construction wing worked in Precision survey works at Varahi under ground Power  &  Varahi  Schemes  and Sharavathi  Schemes  as  AEE.  As  Executive  Engineer  worked in  the  investigation  of  Power  Project  especially  High  Head  Scheme  and  Mini  Hydel Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric Project  and  consultancy  work  of  Markandeya  Dam  Project,    Kalasa  &  Bandurnala Consultancy work. for KNNL.   Further  in  construction  wing  as  Executive  Engineer  (Safety)  at  Raichur  Thermal  Power Station  Shakthinagar  In  addition  to  the  Safety  Engineering  of    Raichur  Thermal  Power Station  worked  on  deputation  to  KPCL  civil  designs  wing    involved  in  the  investigation work of  Bridge cum Barrage Project across River Krishna near Gugal. for KBJNL As Super Intending   Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power Station (7X210 MW Installed Capacity as on 2006)  involved  in the civil maintenance works  of the Thermal  Power Generation Station. After retirement on 31/1/2006 after serving 32 for years with  KPCL joined  on  7/4/2006  as  Consultant  in    M/s Subhadra  Consulting  Engineers  who are also Associate  Consultants to M/s STUP consultants Pvt Ltd., Bangalore and worked up to 31/3/2010. During this tenure as Associate  Consultants to M/s STUP consultants  Pvt Ltd., Bangalore    involved  in  the    Detailed  Engineering  of  Nagarjunasagar  Tail  Pond  dam  ,  Consultant  114
  • 118. Gandikota    Dam  and  Lower  Jurala  Hydro  Electric  Project    which  are  under  construction, Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with 12X80MW(960MW) Installed Capacity .   Currently from 1.4.2010 to till date working with Design Group Project Consultant Pvt Ltd., as Deputy Director (designs) in the planning, design of Hydro Power Projects and Irrigation Project and other Structure    Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2) Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics  Consultant  115
  • 119.   Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian  Institute  of  Technology  in  the  year  1996  and  has  since  15  years  of  exclusive  experience  in  design  of  various  components  of  hydroelectric  Projects. He started his career in Design Group Project Consultants Pvt.  Ltd., Bangalore as Design Engineer (Civil) and was involved in Harangi HEP  (2x4.5MW)  in  Karnataka.  He  joined  NHPC  ltd.,  A  Govt.  of  India  Enterprise  in  year 1998  and  was  involved  in  Planning  and  Construction  stage  Design  of  Dhauliganga  HEP (4x70MW),  Uttaranchal  and  Chamera‐III  HEP  (3x77MW),  Himachal  Pradesh.  He  was associated  with  the  preparation  of  DPR  of  Siyom  HEP  (1000MW),  Arunachal  Pradesh, Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III HEP, Kishanganga HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was also  involved  in  Pre‐feasibility  reports  of  7  projects  in  Arunachal  Pradesh  under  “Prime Minister  50000MW  Initiative”  totaling  to  2581  MW.  He  was  also  associated  with  the consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link Project.  He  has  also  few  technical  papers  presented  in  various  National  Seminars. He  is  a member  of  Indian  Society  of  Rock  Mechanics  and  Tunneling  Technology  (ISMRTT)  and International  Society  for  Rock  Mechanics  (ISRM)  and  Indian  Hydropower  Association (INHA).  He joined  TCE,  Bangalore  in  2007‐2008  and  was  associated  with  100MW  Augmentation  of Bhira Power station and Gokak SHEP.  Since later half of 2008, he is working as Deputy Director (Designs) in Design Group Project Consultants  Pvt.  Ltd.  and  has  been  responsible  for  various  construction  stage  Hydel Projects, DPR’s and Pre‐tendering Services for various projects.       Consultant  116
  • 120.   Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution  PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and  B.E.  from  National  Institute  of  Engineering  College,  Mysore,  Karnataka  in  the  year  1984,  worked  in  various  capacities  in  a Public  Sector/Private  companies.  He  has  worked  In  Public  sector  Karnataka  Urban  Water Supply  &  Drainage  Board  (KUWS&DB)  from  1986  to  2006  for  21  years. He took  voluntary retirement  from  KUWS&DB  and  worked  in  private  organizations  such  as  M/s  Secon  as Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).   He was head of Design Wing while working with KUWS&DB, was involved in preparation of  many  DPRs  comprising  of  Planning,  Design,  Estimating,  implementation  of  number  of water supply and sewerage schemes  including Water treatment plants(WTPs) and Sewage Treatment  Plants(STPs)in  urban  areas  of  Karnataka  State.  He  was  involved  with  water supply & sewerage schemes’ proposals to second major city in the state viz., Hubli‐Dharwar city  under  World  Bank  Project.  He  was  also  involved  with  National  River  Conservation Projects for prevention of river pollution in the state.  While working  with M/s. Secon, he was involved  with water supply and sewerage projects in different towns of Libya country. While working with M/s. Jurong Infrastructure Ltd., he was  involved  with  Design  and  implementation  of  Infrastructure  facilities  such  as  roads, water  supply,  sewerage,  storm  water  drainage,  Electrical  &  Communication  facilities  to  a number of town ship development projects including some of the SEZs.  From  2009  onwards  he  heads the  Water  Division  of  DGPCL responsible  for  implementing water supply and sewerage projects. Presently he is involved with detail Civil  Engineering Design  of Rafha gas based Power Plant Project in Saudi Arabia.  Consultant  117 
  • 121.   Mr.  P  Sudarshan  Rao,  after  obtaining  B.E.  (E&E)  from  Malnad  College  of  Engineering,  Hassan  (Mysore  University)  in  1987  worked  in  the  same  college  and  Regional  College  of  Education,  Mysore  as  a  Lecturer  for  a  brief  period  before joining KPCL in 1989.  He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power Corporation  Limited,  a  State  owned  Public  Sector  Undertaking  with  dedication  for  Power Generation  to  the  State  with  ISO  9001  and  ISO  14001  certification.  He  has  experience  in Operation,  Maintenance  and  Design  wings  of  210/250  MW  coal  based  Thermal  Power  Plant. He  also  has  experience  across  domains  like  Inventory  Management,  Tendering,  Tender Evaluation,  Study  of  various  Control  System  drawings,  Planning  of  Preventive  and Breakdown  Maintenance  of  210  MW  Generator  &  Auxiliaries,  Erection  &  Commissioning  of Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear, 220kV  &  400kV  Outdoor  Switchyard,  and  Station  Battery  System.  He  was  also  involved  in preparation  of  cable  schedules,  interconnection  schedules  and  commissioning  of  210  MW  & 250MW coal fired thermal Units.  After joining DG in February 2011, he is the group lead of Electrical Design team carrying out detail Engineering for gas based generating plants and hydro electric plants.   Consultant  118 

×