An Engineering Consulting        Company
Content Sl. No.                               Description                      Page No.    1       Design Group – A Profil...
Sl. No.                        Description                           Page No.               M.C. Rangarajan, E & M Works  ...
                                                                          1. DESIGN GROUP –A PROFILE                      ...
     3) GEM Engineering Company Ltd., Uganda     4) IL&FS Ltd., Hyderabad      5) NihamShand Cape town South Africa     6)...
     4) GMR Energy Limited.     5) ILFS Infra Limited.     6) WAPCO     7) NTPC     8) BHEL     9) Ritwik Energy Limited H...
        A Profile        4 
            A Profile            5 
           A Profile            6 
      A Profile            7 
                           A Profile                8 
                 A Profile            9 
                  A Profile           10 
 8.  EXPERIENCE  IN  DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT PROJECTS  8.1     Balance of Plant of Hail – 2 Power Plant...
                                                          GTG Building under Construction                                 ...
          8. 2   Sea Water Intake for PFBR Plant Systems:          Nuclear Power Corporation Limited, Kalpakkam, awarded S...
 rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of insitu rock is 75.60 Mpa.        ...
 the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to be 1.024 ton per cum.  In  addition,...
                                                                         View of Diversion Weir Structure with radial gate...
   The  cost  of  the  project  inclusive  of  escalation  in  costs  during  construction  and financial charges is place...
  8.4     AMR/ SHAMBURI Mini Hydel Scheme   M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24  MW  (5  x4.8  MW)  Mini  H...
 The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 KV  rating.  The  construction  took  ...
  The central divider wall was an earthen bund with stone pitching on the side slopes the overall  dimensions of the divid...
                                                                     View of Power House as seen from Downstream          ...
 average annual energy  generation  is 10.10 GWHr.  The cost of the scheme  is Rs. 80 Million. The Project was completed i...
 Captive Thermal Station of the GE India Technology Centre at Bangalore, which has been completed on a time bound schedule...
                                Wind Turbine Generator Hub                                                                ...
 Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for negative  pressure  of  1  kg  per  sq.cm, ...
                                                                                                          Annexure – I 9. ...
 Sl.                                              Installed      Project No.           Name of the Project                ...
  Sl.                  Name of the Project               Installed         Project                     Clients No.        ...
  D. PREPARATION OF TENDER DOCUMENT              Sl.                                                       Installed      ...
                                                                       Annexure – II (A) 10. ORGANISATION STRUCTURE A. PAN...
      Sl. No.    Name & Qualification                                        Designation       10.      Sri B.V. Ramakrish...
                                                                                                      Annexure – II (B)   ...
      Sl. No.                Name & Qualification                   Designation       25        Mr. Mohan Kumar, M.Tech (S...
                                                                                                 Annexure – III (A)  11. L...
      Sl.    Name of the Project             Installed     Project Cost    Year             Clients     No.               ...
   B.         DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED                                                                ...
  Sl.           Name of the Project                Installed      Project       Year               Clients No.            ...
  Sl.           Name of the Project              Installed      Project       Year               Clients No.              ...
  Sl.        Name of the Project             Installed      Project       Year               Clients No.                  ...
  Sl.           Name of the Project                Installed      Project       Year               Clients No.            ...
  Sl.           Name of the Project                 Installed      Project       Year               Clients No.           ...
  Sl.           Name of the Project            Installed          Project       Year              Clients No.             ...
   C. PREPARATION OF DETAILED PROJECT REPORTS                                                                       Sl.   ...
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Design Group Corporate Profile
Upcoming SlideShare
Loading in...5
×

Design Group Corporate Profile

1,347

Published on

DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to cater to the Design Engineering needs of small civil Engineering and Electrical Engineering projects, has now growth into a full fledged Consultancy Organisation, providing its Design Engineering Consultancy services in various fields of Engineering related to very large projects.

Presently the DESIGN GROUP has been registered as a private limited company in the name and style of DESIGN GROUP Project Consultants Private Limited. ISO 9001-2000 Certificate has been conferred on the Organisation in the year 2004.

DESIGN GROUP has been providing various consultancy services required for the implementation of power projects from conceptual stage to completion and comissioning stage and operation and maintenance stage, Energy Audit and Modernisation Schemes for Electrical & Mechanical installations.

The firm has been retained by large industrial houses, firms and independent power producers in India, to extend planning and design engineering services for various projects.

The true strength of DESIGN GROUP is its dedicated and talented team members with more than 30 years of experience in the field of investigation, planning, design, implementation, management and operation and maintenance of large and small power plants and the engineering projects.

DESIGN GROUP is associated with various technical and professional institutions such as the Consulting Engineers Association of India, Central Power Research Institute, Bangalore, to keep abreast with the latest developments and practices in the various fields of engineering. It has entered into MOU with leading overseas consulting firms for providing specialised consultancy services and for taking up overseas projects.

DESIGN GROUP has been successfully providing pre-tender and post-tender services for various public sector undertakings such as Karnataka Power Transmission Corporation Ltd, Visweshwaraiah Vidyuth Nigam Ltd., and several private sector undertakings, for the bid preparation and analysis. These services include assessment of costs, detailed specifications of various items of work, conditions of contracts, tender documents, tender analysis and reports leading to selection of construction and supply agencies as per time bound schedules and needs of clients.

DESIGN GROUP has embarked upon extending its activities to overseas projects, especially in the Middle East Countries such as Saudi Arabia, Oman, United Arab Emirates and neighboring country Nepal.

With the backing of wealth of experience and dedicated service to its clients, DESIGN GROUP has become the most preferred Consultancy firm for extending Consultancy Services for Power Projects and other Engineering Projects.

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,347
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Design Group Corporate Profile"

  1. 1. An Engineering Consulting Company
  2. 2. Content Sl. No.  Description  Page No.  1  Design Group – A Profile  1  2  ISO Certificate  4  3  Certificate of Consulting Engineers Association of India  5  4  Certificate of  Incorporation  6  5  Empanelment with BHEL   7  6  Empanelment with Construction Industry Development  8  Council  7  Merger of M/s. Subhadra Consulting Engineers with M/s.  9  Design Group Project Consultants Pvt Ltd  8  Experience ‐ write up on Sample Projects  11  9  List of Project on Hand  26  10  Organization Structure      A. Panel of Consultants / Advisors   30    B. Technical Personnel   32  11  List of Project /Assignments Successfully Completed      A. Desk Study Report   34    B. Detailed Engineering of Projects  36    C. Preparation of Detailed Project Reports  43    D. Pre‐Feasibility Studies of Power Projects  50    E. Pre‐ Tender Services  59    F. Due Diligence Report  67  12  A few Certificates for Successfully Completed  Projects  72  13  Brief Profile of Advisor / Consultants      a) Advisor      H.V. Eswaraiah, Hydro Power Projects  89    Shankar V. Nesargi, Wind Energy  90    P.R. Balasubramanian, Gas Based Power Plant  91    B.V Ramakrishnaiah,  Gates & Penstocks  92    Balachandran. V, Engineering Geology  93    C.R. Venkatesh , Hydro Power Projects  94  Content   
  3. 3. Sl. No.  Description  Page No.    M.C. Rangarajan, E & M Works  95    S. Ramanan, Hydro Power Projects  96    Umashankar, Steel Structure  97    Narayanan V, Transmission Line  98    Channakeshava C, Computer aided designs  99    Shridhar Prabhu, Legal Advisor, PPA  100    Srinath. N, Environmental Engineering  101    b) Consultants     C.S. Hebli, Chairman  102   B.L Lakshminarasimha, Chief Executive Officer  103   P.R Mallikarjuna, Executive Director (Design Head)  104   P.K. Rupangudi , Director (Gates, Dams design)  105   Chikkaguddappa Director (Project Development  106   Raghavendra Rao H, Director (Electrical Generation)  107   M.M. Reddy, Director (Transmission line,  108  Switchyard & Sub‐Station)   R .Vasudevan, Deputy Director (Water & Waste  109  Water)   U.R. Raghotham , Director (Tunnel and Dam design)  111   G. Penchalaiah, Irrigation Project – Investigation  112   Suryanarayana, Engineering Geology  113   K. T. Sreedhara, Deputy Director (Irrigation)  114   Achutha Narayana, Deputy Director (Hydro civil  116  design)   T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based  117  Power Plant)   P Sudarshan Rao, Manager (Electrical Generation)  118  Content   
  4. 4.     1. DESIGN GROUP –A PROFILE   was  established  in  1979  to  offer  consultancy DESIGN GROUP  services  for  civil  and  electrical  engineering projects. Having completed over 100 prestigious and varied assignments in the last 5 years,  DG  is  a  leading  consultancy  firm,  offering  full‐fledged  consultancy  services across various fields of engineering in India and Abroad.   Equipped to provide design consultancy on very large engineering projects, DG has been  providing  technical  consultancy  services  to  various  organizations  and companies  for  planning,  detailed  design,  and  implementation  of  Hydel,  thermal, and other power projects. These services include analysis of financial aspects, design engineering  for  electrical  installation  of  substations,  switchyards  and  transmission lines,  design  engineering  for  civil  engineering  structures  including  large  dams, tunnels  ,  canals,  power  canals,  cross  drainage  works,  surge  tanks,  penstock  ,  and power houses. DG also provides services related to other civil engineering fields of Irrigation, Water Supply, and Waste Water Treatment.    DG,  which  has  an  annual  turnover  of  over  Rs.400  lakhs,  provides  consultancy services  required  for  the  implementation  of  projects,  right  from  concept  to completion,  commissioning,  operation  and  maintenance,  thereafter.  DG’s  services have  been  utilized  by  Large  Industrial  Houses,  Firms,  and  Independent  Power Producers in India, and elsewhere, for the planning and design engineering of their projects.  In  year  2004,  DG  was  honored  with  an  ISO  9001:2008  certification  for  its design engineering services and continues to hold the certification.  DG  have  entered  into  MOU/  JV  with  number  of  large  institution  to  name  a  few Messers:   1) WAPCO New Delhi.  2) ILF Consulting Engineer, Austria  A Profile  1 
  5. 5.   3) GEM Engineering Company Ltd., Uganda  4) IL&FS Ltd., Hyderabad   5) NihamShand Cape town South Africa  6) Land Mark Holding Ltd. Nairobi, Kenya  7) SSDC Damam KSA     Corporate Office DG has been empanelled in a few public sector undertakings.  1) BHEL for extending design engineering services in Hydro Power projects   2) Karnataka  Neeravari  Nigam  Limited  for  engineering  services  for  Water  Resources Projects.  3) PFC consulting Limited, New Delhi for Power Projects.   Our clients include Messers  1) Nuclear Power Corporation Limited.  2) Gammon India Limited.  3) Fichtner Limited.  A Profile  2 
  6. 6.   4) GMR Energy Limited.  5) ILFS Infra Limited.  6) WAPCO  7) NTPC  8) BHEL  9) Ritwik Energy Limited Hyderabad  10) Greenko Energy Limited Hyderabad  11) AMR Mitra JV Ltd., Hyderabad   More than 100 engineering  software’s have been developed  in house over a period of 20 years. In addition, more than a dozen engineering design softwares have been acquired and are in use for day to day work .State of Art facilities have been created to take up large Water Resources Projects.  Presently the major Detailed Engineering works on hand are   1.   Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in  Saudi Arabia.  2.   Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at  Rafha Saudi Arabia.  3.   Two Irrigation Projects in Afghanistan namely   a. Machalgho Multipurpose Project, near Kabul  b.  Pashdan Multipurpose Project in Herat region.  4.   81 MW Tinget HEP in Himachal Pradesh, India.  5.   75 MW Trishuli Galachhi HEP in Nepal, India.  6.   25 MW Mahan‐3 HEP in Chhattisgarh, India.  7.   12 MW Gatambe HEP in Kandy Sri Lanka.  8.   Balance  of  Plant  for  32  MW  wind  mill  under  phase  II  near  Chikkodi  near  Belgaum, Karnataka, India.   In addition 31 assignments are in different stages of implementation   A Profile  3 
  7. 7.    A Profile  4 
  8. 8.      A Profile  5 
  9. 9.      A Profile  6 
  10. 10.    A Profile  7 
  11. 11.        A Profile  8 
  12. 12.       A Profile  9 
  13. 13.      A Profile  10 
  14. 14.  8.  EXPERIENCE  IN  DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT PROJECTS  8.1   Balance of Plant of Hail – 2 Power Plant  M/s.  Alfanar  one  of  the  leading  EPC  contractors  in  Kingdom  Saudi  Arabia  was awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi Electric  Company.  M/s  ILF  Abu  Dubai,  UAE,  were  the  principal  consultants,  M/s. DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and to  issue  all  construction  drawings  and  designs  for  complete  plan  except  GTG. Siemens were the GTG equipment suppliers.   This  was a fast track  project, involving  issue of  more than 600 drawings  in a  short span  of  4  months.  The  project  was  successfully  commissioned  on  schedule  in  the month of July 2011. The assignment included interaction with clients / SEC (Owners) during approval stage.  The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 kV GIS and 380 kV AIS. The extension project consisted of –   1. 132  kV,  220MVA  Generator  Transformer,  13.8kV  /  4.16kV  15MVA  unit  auxiliary  transformers,  10  nos.  service  transformers,  MV  &  LV  Switchgears  and other BOP.  2. Crude  oil  /  Distillate  oil  fired  Gas  Turbine  Generator  units  of  55/70MW  output – 2nos.  3. Crude oil treatment and forwarding and distillate oil forwarding system for  new units.  4. Associated piping, cabling & services     A Profile  11 
  15. 15.     GTG Building under Construction   The Engineering services for the project consisted of –    • Civil  Engineering  involving  structural  designs,  Architectural  layouts,  equipment  foundations,  for  GTG  Building,  FOTP  Building  &  Switchgear  Building, etc,.  • Mechanical  Engineering  involving  plant  Layouts,  piping,  equipment  sizing,  fire fighting system, HVAC, etc,.   • Process Engineering involving overall process flow discussions, P & ID’s, etc,.   • Electrical  Engineering  involving  system  studies,  development  of  SLD’s,  equipment  sizing,  for  transformers,  MV  &  LV,  Switchgears,  DC  &  UPS  Systems, Cable & inter connection schedules.  • IAC  illumination  Engineering  involving  interfacing  new  unit  &  BOP  to  existing CLR.    A Profile  12 
  16. 16.     8. 2   Sea Water Intake for PFBR Plant Systems:    Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling  Water  System  under  ambitious  plan  of  generating  power  through  Plutonium  Fast  Breeder  Reactor  Project  (PFBR)  to  M/s.  Gammon  India  Limited.    The  major  components of the scheme  were off‐shore  intake shaft, on‐shore outlet shaft, and a  submarine tunnel connecting the two structures at about 45m below sea level.  M/s.  Design  Group  Project  Consultants  Pvt  Limited,  were  involved  in  detailed  engineering services for the sub marine tunnel and shafts.  The project is since been  successfully completed.       The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm  dia  finished  diameter.    The  outer  diameter  varied  from  4300mm  to  4600mm,  thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate  rock  cover  region,  using  M‐45  grade  cement  concrete.     The tunnel  passes  through  Charnockyte type II  rock  medium having  modulas of elasticity  is 0.46 to 3.34  x 106   tons  per  square  meter.  The  poisons’  ratio  adopted  ranged  between  0.14  to  0.25  in  A Profile  13 
  17. 17.  rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of insitu rock is 75.60 Mpa.   Submarine Tunnel      Outlet Shaft as Viewed from Submarine Tunnel       As  per  report  investigation  report  the  dry  density  of  rock  is  2.66  to  2.99  gms  per cubic  centimeter.  The  tunnel  was  driven  45m  below  the  sea  level  without  any geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling  A Profile  14 
  18. 18.  the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to be 1.024 ton per cum.  In  addition,  inlet  shaft  (4250  /  5250  mm  dia)  and  outlet  shaft  (6000 /  7000  mm  dia) were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade concrete.   8.3    Varahi Tail Race Mini Hydel Scheme:   River  Varahi  is  an  important  West  flowing  river  of  Karnataka  State  with  large Hydel  power  potential.  Power  development  in  the  Varahi  Valley  with  an  installed capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x 115=  230  MW  at  Varahi  Underground  Power  House  was  completed  by  Karnataka Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd. Varahi  Tail  Race  Mini  Hydel  Scheme  utilizes  the  tailrace  discharges  of  Varahi Underground  Power  house  and  the  available  level  difference  between  the  point  of confluence of tailrace of Under round Power House with Varahi River and the FRL of  Varahi  Irrigation  Dam  proposed  downstream,  for  generation  of  power.  The proposed  scheme  comprises  of  the  construction  of  a  diversion  weir  across  Varahi river just downstream of the confluence of tail race of VUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m Dia  simple  type  surge  tank,  7m  dia  penstock  tunnel,  3  Nos.  steel  penstocks  and  a power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW capacity each under phase I and a tail race joining the Varahi River on its right flank.  Under Phase II, two more units of similar capacity have been added.            A Profile  15 
  19. 19.     View of Diversion Weir Structure with radial gates           Power House under Construction                   Overview of Power House   A Profile  16 
  20. 20.    The  cost  of  the  project  inclusive  of  escalation  in  costs  during  construction  and financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of completion and is to be commissioned during the year 2005.   Penstock Tunnel, Concrete Lining under Construction                                                                           22m dia Shaft    A Profile  17 
  21. 21.   8.4   AMR/ SHAMBURI Mini Hydel Scheme   M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24  MW  (5  x4.8  MW)  Mini  Hydel Scheme  across  river  Nethravathi,  a  major  west  flowing  river  in  Karnataka.  The design  flood  at  the  barrage  is  11500  cumecs.  The  plant  is  situated  35  km  from Mangalore,  a  major  costal  city  in  west  Karnataka.  The  project  has  a  low  head fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a large flow.  The design discharges utilized for power draft is 78.47 cumecs per unit. The  units  are  capable  of  running  at  15%  continuous  overload.  ‘S’  type  Kaplan turbine  coupled  to  4800  KW  synchronous  generator  through  the  gear  box  are adopted.  During  the  construction,  another  developer  M/s.  Rithwik  Energy Generation proposed a 24 MW capacity power plant on the other bank. After mutual discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.      Thus,  a  power  house  accommodating  10  x  4.8  MW  was  planned  and  developed, with  a  combined  annual  generation  of  115.14  GWHr.  The  scheme  comprises  of,  a barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs flood, non‐overflow sections, a power block on the left bank, a surface power house, and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river.  A Profile  18 
  22. 22.  The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 KV  rating.  The  construction  took  27  months  and  the  plant  was  synchronized.  DG provided the design engineering services.  8.5   Modernisation of Shivanasamudram Power Channel.  Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of the existing Shivanasamudram Hydro Power Project, had proposed to  increase the water carrying capacity of the power channel upto the Shivanasamudram Balancing Reservoir  and  also  increasing  the  live  capacity  of  the  Shivanasamudram  Balancing Reservoir to cater to the increased needs of the power channel and also the increased needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of planning  for  the  improvements  and  the  detailed  engineering  for  the  same  to Shivanasamudram Power Project is the earliest of the power projects constructed in India,  way  back  in  the  year  1902,  to  supply  electrical  power  to  Kolar  Gold  Mines situated 85 kms away.    Divider wall under Construction                    Originally a 2000m long power channel connecting Shiva head works and the Shiva Balancing  Reservoir  had  been  constructed  with  a  central  earthen  divider  wall  and side slopes lined with  stone pitching.   A Profile  19 
  23. 23.   The central divider wall was an earthen bund with stone pitching on the side slopes the overall  dimensions of the divider wall has been 3.7m at the top and 8.2m at the bottom.  Over a  period of the  last 100  years, the  water carrying capacity of the channel had been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, vegetation  growth,  etc.    In  order  to  increase  the  discharge  carrying  capacity  of  the channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of the side slopes was  reset and covered  with RCC lining.  The  vegetation  growth  was completely removed.  After modernization, discharge carrying capacity of the power channel has increased to 59.5 cumecs.  The live capacity of Shiva Balancing Reservoir has  been  substantially  increased  by  desilting  the  reservoir  and  removal  of  weed growth.    In  addition,  DG  was  asked  to  suggest  simple  method  of  desilting  of  the Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made out of a battery of empty steel drums was suggested and used along with ejection of the  silt  by  a  mud  pump  and  a  pipe  line  supported  on  empty  floating  drums,  and taken to the shores.  8.6   Link Canal Mini Hydel Scheme:  Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar project irrigation Canal System, took up the scheme to construct a link canal taking off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of the  link  canal  and  the  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.    A Profile  20 
  24. 24.      View of Power House as seen from Downstream    Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar project irrigation Canal System, took up the scheme to construct a link canal taking off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of the  link  canal  and  he  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.    The scheme is simple with minimum civil engineering works. The civil engineering components  comprise  of  a  70m  long  approach  channel,  intake  structure,  gated bypass  weir  with provision of automatic falling shutters, surface power house, tail channel  leading  the  water  back  to  the  branch  canal.  The  installed  capacity  of  the scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The  A Profile  21 
  25. 25.  average annual energy  generation  is 10.10 GWHr.  The cost of the scheme  is Rs. 80 Million. The Project was completed in the year 2003 by the Developers M/s Graphite India  Ltd.,  Bangalore,  The  civil  engineering  works  were  contracted  to  M/s  Mysore Construction  Co.,  Bangalore.    The  Planning  and  Detailed  Design  Engineering  was handled by Design Group.    8.7   Captive  Power  Plant  of  5.8  MW  capacity  at  John  Welch  Research  Centre, Whitefield, Bangalore for M/s General Electric:   Overall view of DG Plant   Inside view of Generator Room  Design  Group  was  associated  as  a  major  leader  for  the  Planning,  Detailed Engineering  and  construction  co‐ordination  of  the  5.8  MW  Diesel  Engine  based  A Profile  22 
  26. 26.  Captive Thermal Station of the GE India Technology Centre at Bangalore, which has been completed on a time bound schedule of 6 months.  8.8  Windmill Power  M/s.  Doddanavar  Brothers,  who  have  Plan  to  develop  100MW  Wind  Farm  in Chikkodi,  Belgaum  district  of  Karnataka,  India,  availed  our  technical  support  for Engineering of balance of a plant. Critical  main equipment of capacity 10 x 1.5 MW was sourced from M/s. Sinovel, China, while the rest was sourced locally.  Foundation of Wind Mill           DG  assisted  the  developers  by  drafting  technical  specifications,  preparing  data sheets,  floating  tender  for  fabrication  of  towers,  tower  internals  and  electrical right from 690 volts to the grid connection. In addition, assistance was extended for  procurement  activities.  The  Civil  Raft  Foundation  drawings  were  provided after  detail  designs,  for  local  sub‐surface  soil  conditions.  The  entire  assignment was completed in 9 months.            A Profile  23 
  27. 27.   Wind Turbine Generator Hub    1. DG designed 33 kV outdoor yard sub‐station at  Wind farm, 33 kV transmission  line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard  pooling  station  and  110  kV  transmission  line  from  pooling  station  to  KPTCL  evacuating 110 kV sub‐station. 2. DG  prepared  technical  specification  for  33  kV  substation  at  Wind  farm,  33  kV  transmission  line,  33  /  110  kV  pooling  station  and  floated  enquiry  for  the  procurement  and  scrutinized  the  Vendor  offers  and  finalized  the  orders  on  suppliers. 3. Vendor drawings and specification scrutinized. 4. Assisted in commissioning the sub‐station and transmission line.  The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x 1.6  MW  GE  machines  have  been  selected,  the  civil  foundation  is  under construction.   8.9  Design of Vacuum Chambers   M/s.  Hind  High  Vacuum  Co.  Pvt.  Ltd.,  specializing  in  manufacture  of  Pressure Vessels  and  Vacuum  Chambers  for  defence,  pharmaceuticals,  and  solar  panels, entrusted to DG, design and  preparation of fabrication  drawings for a Robotic  TIG  A Profile  24 
  28. 28.  Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for negative  pressure  of  1  kg  per  sq.cm,  with  a  rider  that  the  defection  of  internal structural members must be limited to 0.5 mm.     The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit chambers, tool chambers, etc. The  robotic arm  moves on rails. The  welding  will  be carried out  under Argon  gas atmosphere.  The chamber  were analysed  using NISA Software package and the analysis has been validated by Indian Institute of Science, Bangalore,  the  pioneer  research  institute,  by  using  ETAB  software.  The  analysis, design, and fabrication  drawings have been forwarded to M/s. Hind High Vacuum Co.  Pvt.  Ltd.  The  fabrication  of  chamber  is  in  advance  state  of  complexion.  The Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the world.   8.10  Design  Group  has  been  successfully  providing  pre‐tender  and  post‐tender services  for  various  public  sector  undertakings  and  several  private  sector undertakings,  in  as  much  as  assessment  of  costs,  detailed  specifications  of  various items  of  work,  conditions  of  contracts,  tender  documents,  tender  analysis  and reports  leading to selection of construction and  supply agencies as  per time bound schedules and needs of clients.  A Profile  25 
  29. 29.   Annexure – I 9. LIST OF PROJECTS ON HAND   A. POWER PROJECTS – DETAILED ENGINEERING    Sl.  Name of the Project  Installed  Project  Clients No.  Capacity  Cost in Rs.  in MW  Lakhs  1.  Lower  UHL  SHEP  Project,  13.00  9500  M/s. Trident Power Systems Ltd.,  Himachal Pradesh.  Himachal Pradesh  2.  Singatalur‐Huligudda  Mini  Hydel  18.00  6000  M/s..Tungabhadra Power Projects  Scheme, Karnataka‐  Ltd., Bangalore.  3.  Lambadug Hydro Electric Project,  25.00  12250  M/s. Himachal Sorang Power Pvt.  Himachal Pradesh.  Ltd, Shimla, Himachal Pradesh  4.  Cauvery  Small  Hydel  Project,  24.00  13000  M/s. XS Hydro Energy Private Ltd.,  Karnataka.  Bangalore  5.  Huvinahedagi  Mini  Hydel  24.75  13500  M/s. XS Hydro Power Pvt. Ltd,  Scheme, Karnataka.  Bangalore  6.  Agrahara MHSI & II, Karnataka.  1.475  700  Sarovara Energy Pvt Ltd.,  Bangalore.  7.  Water Supply System for Bharathi  Water  ‐  M/s. Bharathi Cement Corporation  Cement  Plant  at  Cuddapha,  Supply  Ltd Andhra Pradesh  Andhra Pradesh   Scheme  8.  Paudital  Lassa  Hydro‐Electric  24  19200  M/s. Greenko Hatkoti Energy Pvt  Project, Himachal Pradesh.  Ltd., Hyderabad.  9.  Jeori  Lower  Mangalad  SHPP,  15  12000  M/s. Techology House (India) Pvt  Himachal Pradesh.  Ltd., Hyderabad. 10.  Nimishamba  Mini  Hydel  Scheme,  3  1700  M/s. Nimishamba Energy India  Karnataka,  Private Ltd., Bangalore 11.  Kollya  Mini  Hydel  Scheme,  24  19200  M/s. Kumaradhara Power Pvt Ltd  Karnataka.  Bangalore 12.  Chikkodi  Windmill  Project,  100  6000  M/s.Doddanavar Brothers, Belgaum  Karnataka. 13.  Mahan  Hydro  Electric  Project,  24  2000  M/s.Venika Hydro projects Pvt Ltd,  Chathisgard.  Bangalore  Projects on Hand  26 
  30. 30.  Sl.  Installed  Project No.  Name of the Project  Capacity  Cost in Rs.  Clients   in MW  Lakhs 14.  Trishuli  Galchhi  Hydro  Electric  75  80000  M/s. Siddhakali Power Pvt. Ltd.,  Project, Nepal.  Nepal 15.  Kukke 1 & 2 MHS, Karnataka.  24  14400  M/s. Kukke Hydro Projects Pvt Ltd,  Bangalore. 16.  Anusha  Mini  Hydel  Scheme,  4  1600  M/s. Dhenu Hydro Pvt Ltd  Andhra Pradesh.  Hyderabad 17.  Navya  Mini  Hydel  Scheme,  2.60  1300  M/s. Mitra Energy Pvt Ltd  Andhra Pradesh.  Hyderabad 18.  Ramya MHS, Andhra Pradesh.  3.80  1900  M/s. Kurnool Energies Pvt Ltd  Hyderabad 19.  Koilakunte  Mini  Hydel  Scheme,  12    M/s. Dhenu Hydro Power Private  Andhra Pradesh.  Ltd., Hyderabad. 20.  Halsur  Diversion  weir  under    400  M/s. Karnataka Neeravari Nigam  Shiggon  lift  Irrigation  Scheme,  Ltd., Karnataka  Savanur, Karnataka 21.  River  Water  Intake  Pump  House  2 X 270  300  M/s. GVK Ltd through M/s. Fichtner  and Approach Bridge, Punjab.  Consulting Engineers (India) Pvt    Bangalore 22.  Machalgho  Multipurpose  Project,    US $ 95  M/s. Gulf Civil Engineering &  Machalgho, Afghanistan.  Million  construction Co. Kabul, Afghanistan 23.  Pashdan  Irrigation  Project,  near    US $ 180  M/s. Hewadwal Group Afghanistan  Heart, Afghanistan. 24.  Tinget‐2  Hydro  Electric  Project  in  81  60000  M/s. AMR—Mitra JV, Hyderabad  Himachal Pradesh 25.  Balance  of  Plant  for  Rafha  Gas  2 x 75 + 2 x    M/s. SSEM Riyadh through M/s. ILF  based Power Plant, Saudi Arabia.  75  Abu Dhabi 26.  Study  Report  on  Gandak  Canal  3 X 5    M/s. WAPCOS New Delhi  HEP  in  Valmikinagar,  West  Champaran District, Bihar. 27.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services  for  Kurtha  SHP  in  Hyderabad  Himachal Pradesh. 28.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services for Kuril SHP in Himachal  Hyderabad  Pradesh.    Projects on Hand  27 
  31. 31.   Sl.  Name of the Project  Installed  Project  Clients No.  Capacity  Cost in Rs.  in MW  Lakhs  29.  Detailed  Design  Engineering  3 X 5  1200  M/s. Parvat Hydro Power Pvt Ltd.,  services for Chhoned SHP.  Hyderabad  30.  Detailed  Design  Engineering  3 X 8  19200  M/s. Pavanganga Power Private  services  for  Sangam  SHP  Raichur,  Ltd., Hyderabad.  Karnataka.  31.  Review  Consultants  for  Umjaut  160  100000  M/s ETA Star Ltd,. Dubai  (70MW) & Umduma HEP (90MW)  in Meghalaya   B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT   Sl.  Installed  Project  Clients No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs 1  Bellary Solar Power Project,  5  7500  M/s.Vishrutha Power Pvt. Ltd.,  Karnataka.  Bellary 2  Proposal to bring 10 TMC of Raw  ‐  ‐  M/s. Larsen & Toubro Limited,  water from Sakleshpura to  Bangalore  Chikkaballapur & Kolar District &  T.G. Halli  C. PRE TENDER ENGINEERING SERVICES    Sl.  Installed  Project  Clients No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs  Upper  Narmada  Irrigation  Project  Irrigation  ‐  M/s. Gammon India Ltd. Mumbai  1.  Madhya Pradesh – EPC Bid  Project  60MGD  River  water.  Pipeline‐ ‐  M/s. Gammon India Ltd. Mumbai  Water  2.  73kms for VSNL Ltd, at Salboni in  Supply  West Bengal – EPC Bid  Agra Water Supply Project in Agra  Water  ‐  M/s. Gammon India Ltd. Mumbai  3.  – EPC Bid  Supply  Raw  water  supply  system  for  4  x  ‐  M/s. Gammon India Ltd. Mumbai  Water  4.  300  MW  Raigarh  SKS  Power  Supply  Generation (Chattisgarh) Ltd   Projects on Hand  28 
  32. 32.   D. PREPARATION OF TENDER DOCUMENT     Sl.  Installed  Project  Clients No Name of the Project  Capacity  Cost in  in MW  Rs. Lakhs  1.  Dagmara HEP – Preparation of bid  25 x 5  ‐  M/s. Bihar Electricity Board,  document for Civil, E&M, H&M  through M/s. WAPCOS   Transmission Line Component  New Delhi.  works   E. OTHERS  Sl.  Installed  Project  Clients No Name of the Project  Capacity in  Cost in  MW  Rs. Lakhs  1.  Design  and  drawings  of  Electrical  Electrical  ‐  M/s. Doddanavar Nanjinzhao  System  for  Beneficiation  Plant,  Distribution  Mining and Metallurgy (P) Ltd.,  Bagalkot, Karnataka  Belgaum Karnataka.  2.  Detailed  Civil  Engineering  for  Two  Coal  ‐  M/s. Multi Design Infra Works Pvt.  Transfer  points.  Tunnel  in  cut  &  Handling  Ltd. Bangalore  cover,  Box  Pulsing  for  coal  System  conveyor system  for addition  of 2 x  250  MW  to  Sikka  Thermal  Power  Plant in Jamnagar District Gujarat   3.  Design  of  35.58  MLD  capacity  ‐  ‐  M/s. GVPR  Sewage  Treatment  Plant  under  UGD Scheme to Shimoga City    Projects on Hand  29 
  33. 33.    Annexure – II (A) 10. ORGANISATION STRUCTURE A. PANEL OF CONSULTANTS/ADVISORS   Sl. No.  Name & Qualification  Designation  1.  Sri C.S. Hebli    Director Technical (Retd),  Chairman &  Karnataka Power Corporation Ltd.  Chief Consultant.  Bangalore.  2.  Sri H.V. Eswaraiah  Director Technical (Retd),  Consultant –Hydro Civil  Karnataka Power Corporation Ltd.,  Designs.  Bangalore.  3.  Sri G.N. Yoganarasimhan,  Director (Retd),  Advisor‐Hydrology.  WRTD, Rourke,  Bangalore.  4.  Sri. P.R. Balasubramanian,   CMD (Retd), FACT,   Advisor‐ Gas Based Power  Triavaneore, Kerala.  Plant.  Bangalore.  5.  Dr.  D.N. Seshagiri, PhD Harvard, USA.   Director (Retd),  Advisor – Engineering Geology.  Engineering Geology,  Geological Survey of India.  6.  Sri.Vishwanath Balachandran,  Advisor‐ Engineering  Director General, GIS (Retd).  Geology.  Chennai.    7.  Sri. Shankar Nesargi  Managing Director (Retd.)  Advisor ‐Wind Energy  VVNL, Bangalore.  8.  Sri. C. R. Venkatesh  Executive Director (Retd.)  Advisor ‐Hydro Power  NHPC Ltd., New Delhi,  Projects.  Bangalore.  9.  Sri. H. Rangarajan, B.Sc, B.E.  Executive Director(Retd),   Executive Director (Elec.)  KPCL, Bangalore.  Panel of Consultants / Advisors  30 
  34. 34.    Sl. No.  Name & Qualification  Designation  10.  Sri B.V. Ramakrishnaiah,  Advisor – Gates.  Bangalore.  11.  Sri Srinath Anekal, ME (Civil), MS(Environment)  USA.  Advisor‐Environment.  Bangalore.  12.  Sri. M. M. Kamath,   Advisor – Marine Engineering.  Chief Engineer (Retd),  NMPT, Mangalore.  13.  Sanker Pradesh, M.Tech  (Roorkee),    Consultant‐ Geology.  New Delhi.  14.  Sri. Thippeswamy  Advisor –Water and Waste  Chief Engineer (Retd.)  Water System.  BWSSB, Bangalore.  15.  Sri. V. Suresh Kumar, M.Tech (Khargpur),  Advisor – GIS  Bangalore.    16.  Sri V. Narayanan,  Advisor – Transmission  General Manager, SAE (I) Ltd (Retd),  Lines.  Bangalore.  17.  Sri. Ramanan  Chief Engineer (Retd.)  Consultant‐Hydro  NHPC Ltd., New Delhi,  Bangalore.  18.  Dr. Y. Lingaraju.  Advisor ‐  Ground Water  19.  Sri. Umashankara , B.E. (Civil)    Ex‐Mecon.  Advisor ‐Steel Structure.  20.  Sri. G. Rajagopalan,  Director (Retd),  Consultant – Engineering  Engineering Geology,  Geology  Geological Survey of India, Chennai.  21.  Sri. Krishnappa,  Advisor – Finance.  Financial Controller(Retd),    KPCL, Bangalore.  22.  Sri. Sridhar Prabhu – Legal Adviser   Advisor –PPA  23.  Sri. Venkateshwar Rao  Consultant (Liaison)  New Delhi.  24.  Sri T.S. Somanathan, B.E. (Mech).  Advisor –Welding.  Foremerly NLPC Ltd.,   Panel of Consultants / Advisors  31 
  35. 35.    Annexure – II (B)   B. TECHNICAL PERSONNEL    Sl. No.  Name & Qualification  Designation  1  Sri C.S. Hebli, B.E(Hons)  Chairman.  2  Sri B.L. Lakshminarasimha,  Chief Executive Officer              B.Sc., B.E., M.E., MIE, AIV, MASCE.     3  Sri. P.R.Mallikarjuna    Executive Director (Design Head)    M.E.(I.I.Sc.), MIE, MIWRS, MISEO.     4  Sri. Chikkaguddappa  B.E. (Civil)  Director (Project Development)  5  Sri. H.Raghavendra Rao B.E. (Elec)  Director (Electrical Generation.)  6  Sri M.M. Reddy, B.E.(Elecl)  Director (Electrical Power Evacuation)  7  Sri.P.K.Rupangudi, M.E. (Civil)  Director (Gates, Dams design)  8  Sri.U.R.Raghotham, M.Tech. (Civil)   Director (Tunnel and Dam design)  9  Sri.R.Vasudevan B.E. (Elec)  Deputy Director (Water & Waste Water)  10  Sri.K.T.Sreedhara, B.Tech (Civil)  Deputy Director (Irrigation)  11  Sri. Narayana  Achutha  Deputy Director (Hydro civil design)    M.Tech, IIT Kanpur, (Hydraulics)    12  Sri.T.S.Srinivasa, B.E (Civil), M.E  Deputy Director ‐‐Civil (Gas)       13  Sri.Sudarshan Rao B.E. (Elec)  Manager (Electrical Generation)  14  Mr.Gangadar Pattanashetti  Senior Design Engineer (Irrigation)    M.Tech, IIT Guwahati, (Water Resources)    15  Sri. Anantha Murthy,   General Manager (Civil Designs)  B.Sc AMIE (Civil)  16  Ms.Kavitha.M,  B.E, MBA  Administrative Officer   17  Sri. R. Suryanarayana, M.Sc (Geology)  Consultants (Engineering Geology)  18  Ms. Sneha Dandavathe., B.E.(Civil)  Design Engineer (Hydrology)  19  Mr. K.V. Chandrakanth B.E. (Elec)  Design Engineer (Elec.)  20  Mr. Vasanth Kumar B.E (Civil)  Design Engineer (Project Planning)  21  Mr. Shivanand, B.E (Civil)  Design Engineer (Water conductor system)  22  Mr. Pramod Kumar, B.E.(Civil)  Design Engineer (Power House & Tail Race)  23  Mr. Lokesh  B.E (Civil)  Design Engineer (Dam Design)  24  Mr. Sudeendra, M.Tech (Structures)  Design Engineer (Gas Power Plant)  Technical Personnel  32 
  36. 36.    Sl. No.  Name & Qualification  Designation  25  Mr. Mohan Kumar, M.Tech (Structures)  Design Engineer (Gas Power Plant)  26  Mr. Puneeth. S, B.E(Elec)  Design Engineer (Elec.)  27  Mr. Naveen V. B.E.(Mech)  Piping Engineer (Mechanical)  28  Mr. Yoghesh K ,B.E.(Civil)  Design Engineer (Planning)  29  Ms. Anusha Hegde K. B.E.(Elec)  Design Engineer (Electrical)  30  Ms. Smitha Nagaraj B.E.(Elec)  Design Engineer (Electrical)  31  Ms. Kumari Diptimayee, B.E.(Civil)  Design Engineer (Irrigation)  32  Ms. Poonam U Jadhav, B.E (Civil)  Design Engineer   33  Mr. Pradyumna K, B.E.(Civil)  Design Engineer (Trainee)  34   Mr. Vinay M V  B.E .(Civil)   Design Engineer (Trainee)  35  Mr. Saravanan S   Design Engineer (Hydro Civil)   36  Ms.Sunita G Galgali, B.E (Civil)  Assistant Design Engineer   37  Sri Mahesh Desai  Manager (Drawings‐ Section)  38  Mr.Prasanna.T  CAD Engineer (Electrical)  39  Mr.M.Shashi Kumar  Junior Design Engineer (Drawings)  40  Mr.Manthesh.M  CAD Engineer (Mechanical Piping)   41  Mr.Praveen.S.Ladva  CAD Operator (Civil)  42  Mr.Nagashetty S   CAD Engineer (Hydro)  43  Mr.Sangashetty V Biradar  CAD Operator (Gas Power Plant)  44  Mrs. Sharadhamma H   CAD Engineer (Civil)    Office Support Staff:    45  Sri. Nagesh, S  Officer / Manager / Accountant  46  Sri Suresh   Accountant  47  Ms. Thara. R  Receptionist  48  Mrs. Geetha N  Personal  Secretary  49  Sri. Ravi Kumar K   Stenographer Cum Secretary  50  Ms. Sowmya A  Personal  Secretary     Technical Personnel  33 
  37. 37.    Annexure – III (A)  11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED     A. Preparation of Desk Study Report on Hydro  Power  Projects self identified by DG to  various IPP’s in Nepal and India.      Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  1.  Jaleswar HEP, Nepal.  200.00  US $400  2008  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  2.  Taksindu HEP, Nepal.  270.00  US $540  2008  M/s. Nandadevi Agro‐ Million  Farms Pvt Ltd., Hyderabad.  3.  Syar Khola ‘A’ HEP, Nepal  140.00  US $280  2008  M/s. Dunagiri Pvt Ltd.,  Million  Hyderabad.  4.  Syar Khola ‘B’ HEP, Nepal.  360.00  US $720  2008  M/s. Harmosha Pvt Ltd.,  Million  Hyderabad.  5.  Prok HEP, Nepal.  480.00  US $960  2008  M/s. Nandadevi Pvt Ltd.,  Million  Hyderabad.  6.  Jogimara  Trisuli  HEP,  240.00  US $480  2008  M/s. Haramosh Agro‐Farms  Nepal.  Million  Pvt Ltd., Hyderabad.  7.  Bihi HEP, Nepal.  270.00  US $540  2008  M/s. Dunagiri Agro‐Farms  Million  Pvt Ltd., Hyderabad.  8.  Kappe  HEP,  Arunachal  98.00  73900  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd  9.  Champung  Pobe  HEP,  140.00  105500  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  10.  Changlai  HEP,  Arunachal  48.00  36200  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  11.  Braing  pube  HEP,  48.00  36200  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  12.  Pakke  HEP,  Arunachal  70.00  52800  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  13.  Nargum  HEP,  Arunachal  84.00  63300  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.    14.  Chann  Siang  HEP  66.00  50557  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  Desk Study Report  34 
  38. 38.    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  15.  Papu  HEP  Arunachal  110.00  88000  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  16.  Arket Bazar HEP, Nepal.  110.00  US $220  2007  M/s. Parasnath Greenlands  Million  Pvt Ltd., Hyderabad.  17.  Uiya HEP, Nepal.  105.00  US $210  2007  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  18.  Phillim HEP, Nepal.  150.00  US $300  2007  M/s. MMS Steel & Power  Million  Ltd.,Hyderabad.  19.  Amras HEP, Nepal.  150.00  US $300  2007  M/s. Maytas Properties Pvt  Million  Ltd., Hyderabad.  20.  Budhi  Gandaki  HEP,  600.00  US $1200  2007  M/s. RVK Energy Pvt Ltd.,  Nepal.  Million  Andhra Pradesh   Desk Study Report  35 
  39. 39.    B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED      Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  1.  Balance  of  Plant  for  Hail‐2  2 x55/75    2011  M/s. Alfanar Riyadh through  Gas based Power Plant, Saudi  M/s. ILF Abu Dhabi  Arabia.  2.  Computation  of  HFL,  Irrigation  4000  2011  M/s. Karnataka Neeravari  elevation capacity of barrage,  Nigama Limited, Karnataka.  design of barrage for Halasur    Barrage  across  Varada  River  ‐  Shiggaon  Lift  Irrigation  Scheme  Dharwar  District,  Karnataka  3.  Detailed  Analysis,Design  Mechanical  5200  2010  M/s. Hind High Vacuum Co.  and  Preparation  of  Pvt. Ltd. Bangalore  Fabrication  of  TIG  Welding    Chamber.  4.  Balance  of  civil  works  for  —  —  2010  M/s. Delkor Technik India  Horizonal  Belt  Filter  Station  Pvt Ltd., Bangalore.  Building  including  Equipment  and  Accessories  Foundation Cango.  5.  Al‐Gubrah  Mobile  SWRO  —  —  2010  M/s. ILF Abu Dhabi.  Plant Civil Design, Muscat.  6.  Dandavathi  Reservoir  Irrigation  10200  2009  M/s. Karnataka Neeravari  Irrigation Project Karnataka  Nigam Ltd., Bangalore  7.  Varahi  Underground  Power  2 x 215  2500  2009  M/s. Karnataka Power  House Stage‐II Karnataka.  Corporation Ltd., Bangalore  8.  Energy  Audit  of  Fiber  Glass  Energy  60  2009  M/s. ICP(India) Private Ltd.,  Product  Manufacturing  Audit  Bangalore.  Units, Bangalore    9.  35  MLD/STP  for  Shimoga  —  —  2009  M/s. GVPRS Hyderabad.  Town,  Shimoga  District,  Karnataka.    Detailed Engineering – Completed  36 
  40. 40.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 10.  Balance  of  civil  works  for  18  —  —  2009  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application. 11.  Detailed  Engineering  for      2009  Sharavathy Conductors Pvt  Transmission  line  including  Ltd, Bangalore  Foundation  Designs  for  the  20km,  double  circuit  transmission  line  connecting  Vajamangala  220kV  station  to Kachakola 220kV station. 12.  25  mtr  dia  x  3.0  SWD  —  —  2009  M/s. Delkor Technik India  130TPH  capacity  RCC  tank  Pvt Ltd., Bangalore.  with  tunnel  and  overflow  launder  for  thickener  application 13.  100MW  Wind  Farm  10 x 1.65  10000  2009  M/s.Doddanavar Brothers,  development‐1phase  Belgaum Karnataka  16.5MW  Chikkodi  Belgaum    District, Karnataka 14.  Energy  Audit  of  steel  Energy  50  2008  M/s. Goel Engineering  Fabrication  Manufacturing  Audit  Private Ltd., Bangalore.  Unit, Bangalore. 15.  Design  and Drawing for DM  —  —  2008  M/s. Velath Engineering  Vessel.  Works, Sharjah UAE 16.  Construction  Water  supply  3 x 350  450000  2008  M/s. GMR Energy Limited,  for  Kamalanga  Thermal  Bangalore  Power Plant, Orissa. 17.  Somanamaradi  Small  Hydel  1 x 6  1500  2007  M/s. Narayanapur Power  Project‐  Stage‐II,  in  Raichur  Co. Pvt. Ltd, Bangalore  District, Karnataka. 18.  Balance  of  civil  works  for  —  —  2007  M/s. Velath Engineering  Design  and  Drawing  for  Works, Sharjah UAE  Sulphur Storage Tank. 19.  Design  and  Drawing  of  Flue      2007  M/s. Velath Engineering  Gas  Scrubber  (V‐1507)  Works, Sharjah UAE  Vessel.  Detailed Engineering – Completed  37 
  41. 41.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 20.  Detailed  Engineering  for  —  —  2007  Sharavathy Conductors Pvt  Transmission  line  towers  Ltd, Bangalore  including  Foundation  Designs for 50kms of Hiriyur  –  Kudithini  440kV  Transmission line. 21.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Meclin Fabricators  Bhavani  Barrage  Hydro  Private Limited Chennai.  Electric Project I. 22.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Sri Saravana  Bhavani  Barrage  Hydro  Engineering Works  Electric Project II.  company Pvt Ltd. Bhavani  Tamil Nadu 23.  Construction  of  earthen  —  —  2007  M/s. ECC‐‐CPPL Pvt Ltd.,  bund  for  Sarvaraja  Sarovara  Hyderabad. through M/s.  Reservoir  near  Cuddaph,  SM Constructions Bangalore.  Chittur  District,  Andhra  Pradesh. 24.  Shamburi  MHS,  Dakshina  5 x 4.80  9726  2006  M/s.Rithwik Energy  Kannada District, Karnataka.  Generation Pvt. Ltd.  Hyderabad. 25.  Design  and  Drawing  for  —  —  2006  M/s. Velath Engineering  Natural  Gas  Storage  (Buffer)  Works, Sharjah UAE  Pressure vessel. 26.  Balance of Civil Works for 13  —  —  2006  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application. 27.  Balance  of  Civil Works  for 4  —  —  2006  M/s.Rolls‐Royce Energy  x  B35:  40V‐12G  Genset  Gas  Systems India Pvt.Ltd.,  Power Plant at Sudan.  New Delhi 28.  Detailed  Engineering  for  —  —  2006  Sharavathy Conductors Pvt  Transmission  line  Towers  Ltd, Bangalore  including Foundation Design  for  132/66/11  kV  Kolar  Sub‐ Station works.    Detailed Engineering – Completed  38 
  42. 42.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 29.  Perla  Mini  Hydel  Scheme,  5 x 4.80  9726  2005  M/s.AMR Power Pvt. Ltd.  Dakshina  Kannada  District,  Hyderabad.  Karnataka. 30.  Nagarjuna  Sagar  Tail  Pond  2 x 25  42500  2005  M/s. STUP Consultants  Dam  and  Hydro  Power  Private Ltd., Bangalore  Station,  Nalgonda,  Andhra  Pradesh 31.  Construction  of  Gandikota  Irrigation  5500  2005  M/s. STUP Consultants  Dam  across  Pennar  River,  Private Ltd., Bangalore  Kadapa, Andhra Pradesh. 32.  Yakla  Micro  Hydel  Scheme  2 x 250  100  2005  M/s. Raj Kumar and  in Dargeling West Bengal.  Company, Bangalore 33.  Somanamaradi  Small  Hydel  2 x 6  4800  2004  M/s. Narayanapur Power  Scheme,  Raichur  District,  Co. Pvt. Ltd., Bangalore  Karnataka. 34.  Hullahalla  Mini  Hydel  3 x 4  4740  2004  M/s.Limbavali Power Pvt.  Scheme,  Mandya  District,  Ltd., Bangalore  Karnataka. 35.  Somavathi  Mini  Hydel  2 x 3  2746  2004  M/s.SRM Power Pvt. Ltd.  Scheme,  Chickmagalur  Bangalore  District, Karnataka. 36.  Gugal  Small  Hydel  Scheme,  4 x 2.5  4000  2004  M/s.SRS Energy Pvt. Ltd.  Gulbarga District, Karnataka.  Bangalore 37.  Design  of  Anchor  Blocks  for  —  —  2004  M/s. Quest‐GE‐Global  Birkapilli  HEP Turkey  (  XLS  Engineering Development  generation)  Centre,Bangalore. 38.  Koynad  MHS,  Kodagu  2 x 2  1800  2004  M/s. Sadguru Saai Energies  District, Karnataka.  Pvt. Ltd., Bangalore. 39.  Design  and  Preparation  of  Tank Farm    2004  M/s. Velath Engineering  GA  drawings  for  following  Works Sharju, UAE.  tanks.  Crude  Oil  Tank  Slop  Crude  Oil  Tank  Crude  Oil  /  Water  Tank  Product  Water  Tank Fire Water Tank  Diesel Oil Tank.  Detailed Engineering – Completed  39 
  43. 43.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 40.  110 kV Switchyard  extension  Switchyard  100  2003  M/s. Bhowalaka Steels,  at  Bellary  Steels,  Bellary  Bangalore, through LEG.  District, Karnataka.   41.  Pre‐Cast  RCC  Bridge  over      2003  M/s. Mysore construction Co  Upper  Tunga  barrage  across  Ltd., Bangalore.  River  Tunga,  Shimoga  District, Karnataka. 42.  Architural  and  Structural    300  2003  M/s. Nandalal Mohan Lal  services  for  Construction  of  Jairani Kapur Charitable  Pediatric  Ward  at  Kidwai  Trust Bangalore.  Memorial  Institute  of  Oncology  –  Honorary  Assignment 43.  Link  Canal  MHS  2001,  1 x 1.5  700  2002  M/s.Graphite India Ltd.,  Mandya District, Karnataka.  Bangalore. 44.  Varahi  Tail  Race  MHS,  5 x 7.5  13439  2002  M/s. Sandur Power Co. Pvt.  Udupi District, Karnataka.  Ltd., Bangalore. 45.  Civil  works  for  the proposed  —  —  2002  M/s. ASEA Brown Boveri  132/33kV ODY at INDALCO.  Ltd., Bangalore. 46.  132  KV  Switchyard  Switchyard    2002  M/s. BHEL Bangalore.  Capacitor  Bank  for  HINLCO  Renukot. 47.  132  kV  Switchyard  near  Switchyard  300  2001  M/s.Bharat Heavy Electricals  Samayanallur,  Madurai,  Ltd.  Tamil Nadu. 48.  110 kV Switchyard  extension  Switchyard  300  2001  M/s. BHEL, Bangalore,  connected  with  128  MW  DG  through M/s.. MECON,  set  installation  for  KSEB,  Bangalore  Kozikhode. 49.  110  KV  Substation  at  Substation    2001  M/s. LEG Bangalore  Navakarnataka  Steels,  Bellary District, Karnataka. 50.  66  KV  outdoor  Switchyard  Switchyard    2001  M/s. GEPC Ltd., Bangalore  and  Substation  at  NAL  Bangalore.  Detailed Engineering – Completed  40 
  44. 44.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 51.  DG  Plant  at  GE  ITC  Ltd.,  7.4  4000  2000  M/s. GEITC Ltd., Bangalore  Whitefield, Bangalore 52.  Design  of  Supplying  Switchyard  800  2000  M/s.. AEG‐NGEF Limited  Structures  of  220kV  Switch  Bangalore.  yard  for  M/s.  Nippon  Denro  Ispat Ltd., Dolvi, Maharastra. 53.  110  kV  Switchyard  at  Switchyard  250  2000  M/s. Bharat Heavy  HINDALCO,  Renukoot,  Electricals Ltd. Bangalore.  Uttar Pradesh. 54.  Design  of  Supplying  Switchyard  200  1999  M/s. Kirloskar Electric  Structures  for  the  proposed  Company Ltd., Bangalore.  66  KV  Outdoor  Switchyard  at a very Cycles Ludhiana. 55.  Harangi  HEP  at  Harangi  2 x 4.5  3200  1999  M/s. Sulzer Flovel Hydro  Dam,  Kushalnagar  District,    Ltd., Faridabad, Haryana.  Karnataka 56.  Sheshadri Iyer MHS Mandya  3 x 2  1200  1999  M/s. Atria Power  District, Karnataka.    Corporation Limited,  Bangalore. 57.  Remodeling  of  Shiva  Power  —  1000  1998  M/s. Karnataka Power  Channel  at    Transmission Corporation  Shivanasamudram,  Mandya  Ltd., Bangalore.  District, Karnataka. 58.  Dumkar  Hydro‐Electric  3 x 1.5  300  1998  Chief Project Engineer,  Project  at  Leh,  Ladakh,  J&K  Power Development  State.  Corporation Ltd., Kargil,  J&K State. 60.  Civil  works  for  De‐Bottle  —  —  1995  M/s. NGEF Ltd., Bangalore  Neck  Project  MSDS‐4,  Electrical  works  of  Bokaro  Steel Plant, Bihar. 61.  110/33KV  Switchyard  and  Switchyard  300  1989  M/s. NGEF Ltd., Bangalore  Substation  at  Xeldem  Madgon  Goa  for  Goa  Electricity Board.  Detailed Engineering – Completed  41 
  45. 45.   Sl.  Name of the Project  Installed  Project  Year  Clients No.  Capacity in  Cost in Rs.  MW  Lakhs 62.  110  KV  Outdoor  Yard  Switchyard  150  1988  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Madras  Refineries  Ltd.,  Manali  Chennai. 63.  132  KV  Outdoor  Yard  and  Switchyard  200  1987  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Petrofills  Co‐operatives  Ltd.,  Kalewar,  Gujrat.    Detailed Engineering – Completed  42 
  46. 46.    C. PREPARATION OF DETAILED PROJECT REPORTS     Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW    Kukke  Hydro  Projects  Stage  8 x 3      M/s. Kukke Hydro Projects  1.  1  Dakshina  Kannada  12714    Pvt Ltd., Bangalore  District, Karnataka  2011    Kukke  Hydro  Projects  Stage  4 x 3      M/s. Kukke Hydro Projects  2.  2  Dakshina  Kannada  7113    Pvt Ltd., Bangalore  District, Karnataka  2011    Lower  UHL,  Mandi  District,  2 x 7.5      M/s. Trident Power Systems  3.  Himachal Pradesh  9435  2011  Pvt Ltd., Hyderabad    Dananahalli  MHS,  Mandya    4750  2011  M/s. Punam power Pvt Ltd,  4.  District, Karnataka  2 x 3  Bangalore.    Feasibility  Study  on  water      2010  M/s.Bharathi Cement  5.  Supply  lines  for  Bharathi  Corporation Limited  Cement  Factory  from  Hyderabad€

×