Severity & Priority in the area of Software Testing
Quality
P D C A
Plan
Do
Check
Act
Plan Check Act Do
Severity
Critical
Major
Moderate
Minor
Cosmetic
Priority
Resolved Immediately
Give High Attention
Normal Queue
Low Priority
Suspend
Critical
The defect results in the termination of the complete SUT or one or more component applications of the SUT (or of associated software such as the operating system), and/or causes extensive corruption of stored data. The failed function is unusable and there is no acceptable alternative method to achieve the required results
Major
The defect results in the termination of the complete SUT or one or more component applications of the SUT (or of associated software such as the operating system), or causes extensive corruption of stored data; but although the failed function is unusable, there exists an acceptable alternative method to achieve the required results.
Moderate
The defect does not result in a termination, but causes the system to produce incorrect, incomplete, or inconsistent results, or the defect impairs the systems usability.
Minor
The defect does not result in a termination, and does not impair usability, and the desired processing results are easily obtained by working around the defect.
Cosmetic
The defect is the result of non- conformance to a standard, is related to the aesthetics of the system, or is a request for an enhancement. Defects at this level may be deferred or even ignored.
Priority
Priority will be partially based on Severity, but should take into account other factors such as the frequency with which the defect results in failure, the degree of "visibility" of failure (e.g., how many users it will affect, with what impact on their work, and whether it will be visible to external customers), and project-related factors such as the impact on continued development or testing.
Resolved Immediately
Further development and/or testing cannot occur until the defect has been repaired. The system cannot be used until the repair has been effected
Give High Attention
The defect must be resolved as soon as possible because it is impairing development/ and or testing activities. System use will be severely affected until the defect is fixed
Normal Queue
The defect should be resolved in the normal course of development activities. It can wait until a new build or version is created.
Low Priority
The defect is an irritant which should be repaired, but repair can be deferred until after more serious defect have been fixed.
Suspend
The defect repair can be put off indefinitely. It can be resolved in a future major system revision or not resolved at all.