    1. Severity & Priority in the area of Software Testing
    2. Quality
      • P D C A
      • Plan
      • Do
      • Check
      • Act
      Plan Check Act Do
    3. Severity
      • Critical
      • Major
      • Moderate
      • Minor
      • Cosmetic
    4. Priority
      • Resolved Immediately
      • Give High Attention
      • Normal Queue
      • Low Priority
      • Suspend
    5. Critical
      • The defect results in the termination of the complete SUT or one or more component applications of the SUT (or of associated software such as the operating system), and/or causes extensive corruption of stored data. The failed function is unusable and there is no acceptable alternative method to achieve the required results
    6. Major
      • The defect results in the termination of the complete SUT or one or more component applications of the SUT (or of associated software such as the operating system), or causes extensive corruption of stored data; but although the failed function is unusable, there exists an acceptable alternative method to achieve the required results.
    7. Moderate
      • The defect does not result in a termination, but causes the system to produce incorrect, incomplete, or inconsistent results, or the defect impairs the systems usability.
    8. Minor
      • The defect does not result in a termination, and does not impair usability, and the desired processing results are easily obtained by working around the defect.
    9. Cosmetic
      • The defect is the result of non- conformance to a standard, is related to the aesthetics of the system, or is a request for an enhancement. Defects at this level may be deferred or even ignored.
    10. Priority
      • Priority will be partially based on Severity, but should take into account other factors such as the frequency with which the defect results in failure, the degree of "visibility" of failure (e.g., how many users it will affect, with what impact on their work, and whether it will be visible to external customers), and project-related factors such as the impact on continued development or testing.
    11. Resolved Immediately
      • Further development and/or testing cannot occur until the defect has been repaired. The system cannot be used until the repair has been effected
    12. Give High Attention
      • The defect must be resolved as soon as possible because it is impairing development/ and or testing activities. System use will be severely affected until the defect is fixed
    13. Normal Queue
      • The defect should be resolved in the normal course of development activities. It can wait until a new build or version is created.
    14. Low Priority
      • The defect is an irritant which should be repaired, but repair can be deferred until after more serious defect have been fixed.
    15. Suspend
      • The defect repair can be put off indefinitely. It can be resolved in a future major system revision or not resolved at all.
    16. Thank You

    + abcabc, 2 years ago

    custom

    1010 views, 0 favs, 0 embeds more stats

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1010
      • 1010 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 14
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories