How to Scope a Lean Event
Abstract
As we all know, anything poorly scoped can create chaos,
uncertainty and failure to achieve a goal – this certainly
applies to Lean events. When we bite off too much, we may
not get off the starting line because there’s too much to talk
about. If we do get moving we tend to go in many different
directions and accomplish little. If our scope is too small,
we waste valuable resources and miss the target.

We’ll look at how to get started, how to identify and avoid
common mistakes, and what tools might be helpful.




                                                                                                                                                                             2
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Project Selection
When selecting a project, most organizations will use one of two
methods to decide where to start…

       Strategy                                                                                                              Pain




                                                                                                                                                                              3
           © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Project Selection
STRATEGY DRIVEN:
  • Based on other projects or initiatives currently “in-
    flight”
  • Based on a Value Stream analysis of the organization
  • Based on new rules or regulations that take effect in
    the future

PAIN DRIVEN:
   • Based on process problems – backlogs, high defect
     rate, overworked staff, missed deadlines, etc
   • Based on organizational concerns – not meeting
     regulatory guidelines, budget cuts, complaints, etc
                                                                                                                                                                            4
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Project Selection Key Steps
• Ensure project aligns with agency mission / strategy
• Assess project desirability
   • Impact
   • Effort
   • Probability of success
• Select projects that are visible and capable of getting the
  attention of the organization and other departments




                                                                                                                                                                             5
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Agency Strategies and LeanSigma®



                                                                                                        VOB
  Strategic                           Hoshin                                                            VOC




  Tactical                           Brain
                                                                                                          VOP
                                   Storming


                                  PerceptionB                                                              Data
                                     ased                                                                 Based

                                                                                                                                                                             6
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Project Desirability Matrix
The desirability of a project increases as you move from the
lower right to the upper left, and as the circle gets larger


               Hi                                                                                                               PROBABILITY
                                                                                                                                OF SUCCESS
   AGENCY
    IMPACT




                                                                                                                                                                      Low
             Med
                                                                                                                                                                       Med


             Low                                                                                                                                                       Hi


                               Low                                   Med                                    Hi
                                         EFFORT REQUIRED
                                                                                                                                                                                 7
              © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Impact on Process
Definition of Impact:
  •   The effect change will have on the process in terms
      of improving service – cost - quality

Typical Little or No Impact:
  •   Creating or revising a report
  •   Installing a measurement system
  •   Quantifying the performance of a process
  •   Reducing cycle time of a non-bottleneck operation



                                                                                                                                                                            8
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Effort Required
Definition of Effort:
  •   Your time, time required of the team members, and
      any expenditure of money


Typical High Effort:
  •   Installing a new computer system
  •   Requires changes to regulations or statutes
  •   “Fixing” the annual planning process


                                                                                                                                                                            9
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Definition of Probability of Success
Assess the various risk factors:
  •   Time - uncertainty of the completion date
  •   Effort - uncertainty of the investment required
  •   Implementation - uncertainty of roadblocks
Typical Low Probability of Success:
  •   Won’t show the benefits within a year
  •   Depends upon completion of other risky projects
  •   Requires help from extremely busy people
  •   Is not aligned with your objectives


                                                                                                                                                                            10
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Characteristics of a LeanSigma® Project
The Project:
• Is linked to a critical agency goal and will positively
  impact the goal’s metric
• Is in line with the project selection criteria used by
  Executive Leaders
• Deals with an issue or problem that is linked to a process
  with clearly defined begin and end points
• Has easily identifiable internal or external Customers
  who use or receive the output from the process
   • You’re able to find out how the output is used by the Customer
   • You’re able to find out why the output is important to the
     Customer

                                                                                                                                                                             11
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Characteristics of LeanSigma® Project
A Project:
• Has a measure you can clearly identify and impact
• Is one in which you can show how improvements will
  impact service, cost and quality
• Has the organizational support to make it happen
   • Has a champion who cares about the improvement and has the
     authority to approve time and resources
   • Has identified process owner(s)




                                                                                                                                                                            12
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Identify Initial Scope of the Event
Answer these questions to
prepare for next steps:

  • Why was this area / project
    chosen?
  • Whatspecific process or
    piece of the process will
    we focus on?
  • What are the measures of
    success?



                                                                                                                                                                           13
        © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Identify Key Participants
Event Sponsor:
  • This person typically owns the process where the event is taking
    place
  • Helps team members get time away to do the event
  • Removes roadblocks and supports the process 100%
Team Leader:
  •   Best if this person is from an outside department or agency
  •   Has had previous continuous improvement experience
  •   Helps with logistics and planning of the event
  •   Helps lead the team during the event
Team Members:
  • Key managers and staff who work in or with the process


                                                                                                                                                                              14
           © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Scoping Event (Pre-event Meeting)
• This should take place 2 – 5 weeks prior to the actual
  event and will take 3 – 4 hours

• The following should be completed during this time:
   • High level review of Lean concepts and what to expect
     during the Kaizen week
   • Refine the scope (Use SIPOC if necessary)
   • Develop objectives and goals
   • Determine pre-work and data collection required to
     understand current state / baseline metrics
   • Finalize participant list and roles (dedicated, on-call, etc)


                                                                                                                                                                             15
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
SIPOC
• Definition
   • Documents a process from the suppliers to customers.
   • The name comes from the column headings on the form:
     Suppliers, Inputs, Process, Outputs, and Customers


• Purpose
   • Identify and balance competing (internal and external) customer
     requirements
   • Identify gaps in requirements and the process outputs or inputs
   • Identify suppliers of the process inputs
   • Aid in identification of data collection needs
   • Establish the right metrics and improvement priorities
   • Use as a tool to continuously verify customer requirements

                                                                                                                                                                              16
           © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
SIPOC
• Definition of a Process
   • A series of activities that transform a set of inputs into a specific set
     of outputs. Everything we do is a process.


• Components of a Process
   • Inputs: Inputs are man / person, method, material,
     machine,measurements, and mother nature / environment (referred
     to as the “6M’s”)
   • Transformation: Series of steps or tasks that change (transform)
     the inputs.
   • Outputs: Goods, services, or consequences




                                                                                                                                                                              17
           © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Who is the Customer?




 •   Process: Description of a process that provides outputs to meet the needs (expressed or
     implied) of Customers
 •   Input and output boundaries: Define the start and stop boundaries of the process
 •   Outputs: Delivered products or services that should satisfy the Customer expectations and
     meet or exceed the customer requirements
 •   Customers: The people who receive the outputs, and those who put requirements on the
     outputs, but do not receive the output

                                                                                                                                                                                 18
              © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
SIPOC Elements


                                                                                     2
7                                                                                        How                                                              5
                                                     What does                         does the
                                                    the process                        process                                                         What does
Who is the
                                                    expect from                         start?                                                       each customer
supplier of
                                                    each input?                                                                                       expect from
each input?
              6                                                                                                        3                              each output?                     4
                                                             8                       1                                    What are
              What Inputs are
               required to                                                         What is the                           the outputs                                             Who is the
               enable this                                                          process?                               from the                                              customer
                process to                                                                                                process?                                                of each
                  occur?                                                                                                                                                          output?
                                                                                     2
                                                                                          How
                                                                                        does the
                                                                                        process
                                                                                          end?




                                                                                                                                                                                  19
              © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
SIPOC Example
 DEQ - Office of Compliance and Enforcement



   S   upplier                   I   nputs                        P        rocess                                                O         utput                   C         ustomer
 Inspectors            Evidence                              Document                                                     FERA                                  Public
                                                             of Violation                       3-6
                                                                                                Weeks
 Lab                   Complaints                            Refer Case                         1-2                       Final Order                           EPA
                                                                                                Months
 Public                Regulatory     Develop                                                                             News                                  Violator
                       Interpretation (Issue) FEA                                               3-6                       Release
                                                                                                Months
 Other                 PEN                                   Appeal                                                       Ref.                                  Program
                                                                                                3-4
 Agencies                                                                                       Months
 Program               Review                                Final Order                        2-4                       PEN                                   Media
                                                                                                Weeks
 HR                    Labor                                                                                                                                    OCE
 Violators             Guidance

                                                                                                                                                                                  20
              © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Defining Project Objectives / Goals
• The project objectives selected need to be documented in
  the charter
• An objective includes
  •   The goal
  •   Associated output (CTQ) measures
  •   Targets
  •   Timeframes (if possible)
• Metrics
  • Time...what is the lead time for this process?
  • Cost...how much does it cost for people and supplies?
  • Quality...how much rework is there?
• Capture Voice of the Customer to better understand
  improvement opportunities
                                                                                                                                                                               21
            © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Refining Goals and Objectives
• Initially, you may not be able to define specific quantitative
  objectives because you do not have the data available
• In these cases
   • Set general goals and objectives (i.e. make a general statement
     like “improve productivity by 10%”)
   • Collect additional data and analyze it – Use best available data
• Examples of well defined goals
   • Reduce the number of incomplete referrals by 40% starting Q2
     2009
   • Improve the first time quality to 98% of applications received by
     end of Q2 2009
   • 100% of permit evaluations performed within 60 days starting June
     1, 2009


                                                                                                                                                                             22
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Event Pre-work
• Data collection prior to the event will be driven by
  previously defined goals and objectives
   • Reduce incomplete referrals by 40%...Collect quality data (how
     many incomplete referrals come in today?)
   • Improve the first time quality to 98%... Collect quality data (what
     is our current first pass yield-FPY?)
   • 100% of permit evaluations performed within 60 days... How
     many evaluations take longer? How long?

• Bring copies of all reports, logs, screen shots, SOP’s, etc
• If required data is not available, you may need to perform
  “real-time” data collection for the weeks prior to the event


                                                                                                                                                                             23
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Finalize Participants and Determine
Roles
• Start with the “Thirds” rule of thumb –
   • 1/3 of the participant work directly in the process
     (SME’s)
   • 1/3 of the participants are managers or supervisors in
     the process
   • 1/3 of the participants are “outside eyes”. These may be
     customers or other external stakeholders
• Make sure the team is not heavily loaded with one
  department or group. A cross-functional team that
  represents the entire process is most effective

                                                                                                                                                                             24
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Finalize Participants and Determine Roles
(cont)
• If the process uses support functions such as IT, HR,
  accounting, legal, etc. – invite them
• Some resources will be “on-call”. This is usually driven by
  their availability to give a full week.
• Keep the team size in the 10 – 14 range if possible.
• Event observers are acceptable but cannot actively
  participate in the improvement event
• All team members should manage their time away as if
  they are out of town. They should be dedicated to the
  event.
                                                                                                                                                                             25
          © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Key Takeaways
• Involve sponsors and stakeholders from the beginning
  and get buy-in
• Build a cross functional team including customers of the
  process. Review and modify team if scope changes
  significantly
• Establish clear boundaries – what is in scope / out of
  scope
• Understand where the “buckets of time” reside in the
  process so you don’t miss opportunities
• Set clear, specific and measurable goals
• Identify and collect data to define current state and
  support goals
• Communicate – Communicate - Communicate

                                                                                                                                                                            26
         © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
Questions




                                                                                                                                                                        27
     © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.

More Related Content

What's hot

Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...mjohns3500
 
Shaking the Box: Creating Indelible Organizational Change
Shaking the Box: Creating Indelible Organizational Change Shaking the Box: Creating Indelible Organizational Change
Shaking the Box: Creating Indelible Organizational Change kirkholmes11
 
Excellence in customer experience
Excellence in customer experienceExcellence in customer experience
Excellence in customer experienceVakhavan
 
Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Ken Collins
 
Current analysis cem survey - feb 2012 - final
Current analysis   cem survey - feb 2012 - finalCurrent analysis   cem survey - feb 2012 - final
Current analysis cem survey - feb 2012 - finaljmarcheck
 
Praxes Group Capabilities Overview
Praxes Group Capabilities OverviewPraxes Group Capabilities Overview
Praxes Group Capabilities OverviewJohn Gregoire
 
Managing cost and realising benefits from your SAP HCM or other HR system
Managing cost and realising benefits from your SAP HCM or other HR systemManaging cost and realising benefits from your SAP HCM or other HR system
Managing cost and realising benefits from your SAP HCM or other HR systemSven Ringling
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Chris Colson
 
SRT Consultants - Healthcare
SRT Consultants - HealthcareSRT Consultants - Healthcare
SRT Consultants - Healthcarembrauer
 
How To Benefit From A Sustainable Business Mindset
How To Benefit From A Sustainable Business Mindset How To Benefit From A Sustainable Business Mindset
How To Benefit From A Sustainable Business Mindset The Vector Group
 
Beyond Procurement Survey Results
Beyond Procurement Survey ResultsBeyond Procurement Survey Results
Beyond Procurement Survey ResultsSammy Rashed
 
StrategicFit - Production Forecasting Poster
StrategicFit - Production Forecasting PosterStrategicFit - Production Forecasting Poster
StrategicFit - Production Forecasting PosterStrategicFit
 
aerce 201006 (slideshare)
 aerce 201006 (slideshare) aerce 201006 (slideshare)
aerce 201006 (slideshare)Sammy Rashed
 
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...mstxbusiness
 
Cipsa Obtaining Value For Money On Service And Operational Contracts
Cipsa   Obtaining Value For Money On Service And Operational ContractsCipsa   Obtaining Value For Money On Service And Operational Contracts
Cipsa Obtaining Value For Money On Service And Operational Contractswilliamskym
 
Req Pro - Andreas gschwind
Req Pro - Andreas gschwindReq Pro - Andreas gschwind
Req Pro - Andreas gschwindRoopa Nadkarni
 

What's hot (20)

MCI Outsourcing Whitepaper
MCI Outsourcing WhitepaperMCI Outsourcing Whitepaper
MCI Outsourcing Whitepaper
 
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
 
Shaking the Box: Creating Indelible Organizational Change
Shaking the Box: Creating Indelible Organizational Change Shaking the Box: Creating Indelible Organizational Change
Shaking the Box: Creating Indelible Organizational Change
 
SAP
SAPSAP
SAP
 
Excellence in customer experience
Excellence in customer experienceExcellence in customer experience
Excellence in customer experience
 
Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...
 
Current analysis cem survey - feb 2012 - final
Current analysis   cem survey - feb 2012 - finalCurrent analysis   cem survey - feb 2012 - final
Current analysis cem survey - feb 2012 - final
 
Praxes Group Capabilities Overview
Praxes Group Capabilities OverviewPraxes Group Capabilities Overview
Praxes Group Capabilities Overview
 
Managing cost and realising benefits from your SAP HCM or other HR system
Managing cost and realising benefits from your SAP HCM or other HR systemManaging cost and realising benefits from your SAP HCM or other HR system
Managing cost and realising benefits from your SAP HCM or other HR system
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)
 
SRT Consultants - Healthcare
SRT Consultants - HealthcareSRT Consultants - Healthcare
SRT Consultants - Healthcare
 
How To Benefit From A Sustainable Business Mindset
How To Benefit From A Sustainable Business Mindset How To Benefit From A Sustainable Business Mindset
How To Benefit From A Sustainable Business Mindset
 
Beyond Procurement Survey Results
Beyond Procurement Survey ResultsBeyond Procurement Survey Results
Beyond Procurement Survey Results
 
StrategicFit - Production Forecasting Poster
StrategicFit - Production Forecasting PosterStrategicFit - Production Forecasting Poster
StrategicFit - Production Forecasting Poster
 
aerce 201006 (slideshare)
 aerce 201006 (slideshare) aerce 201006 (slideshare)
aerce 201006 (slideshare)
 
Bio rev 1
Bio rev 1Bio rev 1
Bio rev 1
 
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
 
Instantis RMMM
Instantis RMMMInstantis RMMM
Instantis RMMM
 
Cipsa Obtaining Value For Money On Service And Operational Contracts
Cipsa   Obtaining Value For Money On Service And Operational ContractsCipsa   Obtaining Value For Money On Service And Operational Contracts
Cipsa Obtaining Value For Money On Service And Operational Contracts
 
Req Pro - Andreas gschwind
Req Pro - Andreas gschwindReq Pro - Andreas gschwind
Req Pro - Andreas gschwind
 

Similar to How To Scope A Lean Event

Guidon Lean Retail Webinar
Guidon Lean Retail WebinarGuidon Lean Retail Webinar
Guidon Lean Retail WebinarMelissa Sopwith
 
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...Business Development Institute
 
Guidon Lean Retail Webinar
Guidon Lean Retail WebinarGuidon Lean Retail Webinar
Guidon Lean Retail Webinarmpeterson01
 
Guidon And Rbfcu Lean For Credit Unions Webinar
Guidon And Rbfcu Lean For Credit Unions WebinarGuidon And Rbfcu Lean For Credit Unions Webinar
Guidon And Rbfcu Lean For Credit Unions Webinarmpeterson01
 
Services Marketing and Product Management
Services Marketing and Product ManagementServices Marketing and Product Management
Services Marketing and Product ManagementSam Klaidman
 
Service Marketing and How It Relates To Product Management
Service Marketing and How It Relates To Product ManagementService Marketing and How It Relates To Product Management
Service Marketing and How It Relates To Product ManagementSam Klaidman
 
Outsourcing Services: What is right for your organisation
Outsourcing Services: What is right for your organisationOutsourcing Services: What is right for your organisation
Outsourcing Services: What is right for your organisationVincent Kwon
 
Aiimi Business Overview Dec 2010
Aiimi Business Overview Dec 2010Aiimi Business Overview Dec 2010
Aiimi Business Overview Dec 2010damian_85
 
Frost Cg Corporate Presentation
Frost Cg   Corporate PresentationFrost Cg   Corporate Presentation
Frost Cg Corporate Presentationfrostcg
 
Procon Expert Statement2010
Procon Expert Statement2010Procon Expert Statement2010
Procon Expert Statement2010jmreiner
 
Planning and Budgeting in Vietnam: Top challenges and solutions
Planning and Budgeting in Vietnam: Top challenges and solutionsPlanning and Budgeting in Vietnam: Top challenges and solutions
Planning and Budgeting in Vietnam: Top challenges and solutionsTrang Nguyen
 
PCI IT Conference 2009
PCI IT Conference 2009PCI IT Conference 2009
PCI IT Conference 2009guest43efa2
 
Making the Case for a Project Management Office
Making the Case for a Project Management OfficeMaking the Case for a Project Management Office
Making the Case for a Project Management OfficeRTM Consulting
 
How To Develop a Value Proposition That SELLS
How To Develop a Value Proposition That SELLSHow To Develop a Value Proposition That SELLS
How To Develop a Value Proposition That SELLSLeveragePoint Innovations
 
Guidon High Performance Culture Webinar
Guidon High Performance Culture WebinarGuidon High Performance Culture Webinar
Guidon High Performance Culture WebinarMelissa Sopwith
 
About bmgi 2013 english feb 2013
About bmgi 2013 english feb 2013About bmgi 2013 english feb 2013
About bmgi 2013 english feb 2013Anthony Shingleton
 

Similar to How To Scope A Lean Event (20)

Guidon Lean Retail Webinar
Guidon Lean Retail WebinarGuidon Lean Retail Webinar
Guidon Lean Retail Webinar
 
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...
Developing Content No Matter What the Resources - BDI 4/17/13 Content Marketi...
 
Guidon Lean Retail Webinar
Guidon Lean Retail WebinarGuidon Lean Retail Webinar
Guidon Lean Retail Webinar
 
Lean Information Technology Webinar
Lean Information Technology WebinarLean Information Technology Webinar
Lean Information Technology Webinar
 
Guidon And Rbfcu Lean For Credit Unions Webinar
Guidon And Rbfcu Lean For Credit Unions WebinarGuidon And Rbfcu Lean For Credit Unions Webinar
Guidon And Rbfcu Lean For Credit Unions Webinar
 
Guidon And RBFCU Lean For Credit Unions Webinar
Guidon And RBFCU Lean For Credit Unions WebinarGuidon And RBFCU Lean For Credit Unions Webinar
Guidon And RBFCU Lean For Credit Unions Webinar
 
Services Marketing and Product Management
Services Marketing and Product ManagementServices Marketing and Product Management
Services Marketing and Product Management
 
Service Marketing and How It Relates To Product Management
Service Marketing and How It Relates To Product ManagementService Marketing and How It Relates To Product Management
Service Marketing and How It Relates To Product Management
 
Outsourcing Services: What is right for your organisation
Outsourcing Services: What is right for your organisationOutsourcing Services: What is right for your organisation
Outsourcing Services: What is right for your organisation
 
AdvisorAssist Compliance ROI
AdvisorAssist Compliance ROIAdvisorAssist Compliance ROI
AdvisorAssist Compliance ROI
 
Aiimi Business Overview Dec 2010
Aiimi Business Overview Dec 2010Aiimi Business Overview Dec 2010
Aiimi Business Overview Dec 2010
 
Frost Cg Corporate Presentation
Frost Cg   Corporate PresentationFrost Cg   Corporate Presentation
Frost Cg Corporate Presentation
 
Procon Expert Statement2010
Procon Expert Statement2010Procon Expert Statement2010
Procon Expert Statement2010
 
Planning and Budgeting in Vietnam: Top challenges and solutions
Planning and Budgeting in Vietnam: Top challenges and solutionsPlanning and Budgeting in Vietnam: Top challenges and solutions
Planning and Budgeting in Vietnam: Top challenges and solutions
 
PCI IT conference 2009
PCI IT conference 2009PCI IT conference 2009
PCI IT conference 2009
 
PCI IT Conference 2009
PCI IT Conference 2009PCI IT Conference 2009
PCI IT Conference 2009
 
Making the Case for a Project Management Office
Making the Case for a Project Management OfficeMaking the Case for a Project Management Office
Making the Case for a Project Management Office
 
How To Develop a Value Proposition That SELLS
How To Develop a Value Proposition That SELLSHow To Develop a Value Proposition That SELLS
How To Develop a Value Proposition That SELLS
 
Guidon High Performance Culture Webinar
Guidon High Performance Culture WebinarGuidon High Performance Culture Webinar
Guidon High Performance Culture Webinar
 
About bmgi 2013 english feb 2013
About bmgi 2013 english feb 2013About bmgi 2013 english feb 2013
About bmgi 2013 english feb 2013
 

More from Guidon Performance Solutions

Enterprise Risk Management: Culture, Vision, Performance
Enterprise Risk Management: Culture, Vision, PerformanceEnterprise Risk Management: Culture, Vision, Performance
Enterprise Risk Management: Culture, Vision, PerformanceGuidon Performance Solutions
 
Minimizing the impact of aging baby boomers on your organization
Minimizing the impact of aging baby boomers on your organizationMinimizing the impact of aging baby boomers on your organization
Minimizing the impact of aging baby boomers on your organizationGuidon Performance Solutions
 
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...Guidon Performance Solutions
 
Making a Positive Impact on Patient Care: A Case Study of Children’s National...
Making a Positive Impact on Patient Care: A Case Study of Children’s National...Making a Positive Impact on Patient Care: A Case Study of Children’s National...
Making a Positive Impact on Patient Care: A Case Study of Children’s National...Guidon Performance Solutions
 
LEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeLEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeGuidon Performance Solutions
 
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...Guidon Performance Solutions
 
The Shifting Role of Lean Six Sigma in The Age of Turbulence
The Shifting Role of Lean Six Sigma in The Age of TurbulenceThe Shifting Role of Lean Six Sigma in The Age of Turbulence
The Shifting Role of Lean Six Sigma in The Age of TurbulenceGuidon Performance Solutions
 
Using Lean Six Sigma for Fast Track SG&A Reductions
Using Lean Six Sigma for Fast Track SG&A ReductionsUsing Lean Six Sigma for Fast Track SG&A Reductions
Using Lean Six Sigma for Fast Track SG&A ReductionsGuidon Performance Solutions
 
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...Guidon Performance Solutions
 

More from Guidon Performance Solutions (10)

Enterprise Risk Management: Culture, Vision, Performance
Enterprise Risk Management: Culture, Vision, PerformanceEnterprise Risk Management: Culture, Vision, Performance
Enterprise Risk Management: Culture, Vision, Performance
 
Minimizing the impact of aging baby boomers on your organization
Minimizing the impact of aging baby boomers on your organizationMinimizing the impact of aging baby boomers on your organization
Minimizing the impact of aging baby boomers on your organization
 
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...
Leveraging Lean Thinking In Credit Unions: A Randolph-Brooks Federal Credit U...
 
Making a Positive Impact on Patient Care: A Case Study of Children’s National...
Making a Positive Impact on Patient Care: A Case Study of Children’s National...Making a Positive Impact on Patient Care: A Case Study of Children’s National...
Making a Positive Impact on Patient Care: A Case Study of Children’s National...
 
LEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeLEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a Time
 
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...
The Reform After the Reform Webinar Series - Session 1: How Payers Will Be Im...
 
The Shifting Role of Lean Six Sigma in The Age of Turbulence
The Shifting Role of Lean Six Sigma in The Age of TurbulenceThe Shifting Role of Lean Six Sigma in The Age of Turbulence
The Shifting Role of Lean Six Sigma in The Age of Turbulence
 
Using Lean Six Sigma for Fast Track SG&A Reductions
Using Lean Six Sigma for Fast Track SG&A ReductionsUsing Lean Six Sigma for Fast Track SG&A Reductions
Using Lean Six Sigma for Fast Track SG&A Reductions
 
Oregon Effective Government Presentation
Oregon Effective Government PresentationOregon Effective Government Presentation
Oregon Effective Government Presentation
 
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...
Guidon Lean Retail Webinar: Leveraging Lean Store Operations to Improve the C...
 

Recently uploaded

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 

Recently uploaded (20)

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 

How To Scope A Lean Event

  • 1. How to Scope a Lean Event
  • 2. Abstract As we all know, anything poorly scoped can create chaos, uncertainty and failure to achieve a goal – this certainly applies to Lean events. When we bite off too much, we may not get off the starting line because there’s too much to talk about. If we do get moving we tend to go in many different directions and accomplish little. If our scope is too small, we waste valuable resources and miss the target. We’ll look at how to get started, how to identify and avoid common mistakes, and what tools might be helpful. 2 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 3. Project Selection When selecting a project, most organizations will use one of two methods to decide where to start… Strategy Pain 3 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 4. Project Selection STRATEGY DRIVEN: • Based on other projects or initiatives currently “in- flight” • Based on a Value Stream analysis of the organization • Based on new rules or regulations that take effect in the future PAIN DRIVEN: • Based on process problems – backlogs, high defect rate, overworked staff, missed deadlines, etc • Based on organizational concerns – not meeting regulatory guidelines, budget cuts, complaints, etc 4 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 5. Project Selection Key Steps • Ensure project aligns with agency mission / strategy • Assess project desirability • Impact • Effort • Probability of success • Select projects that are visible and capable of getting the attention of the organization and other departments 5 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 6. Agency Strategies and LeanSigma® VOB Strategic Hoshin VOC Tactical Brain VOP Storming PerceptionB Data ased Based 6 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 7. Project Desirability Matrix The desirability of a project increases as you move from the lower right to the upper left, and as the circle gets larger Hi PROBABILITY OF SUCCESS AGENCY IMPACT Low Med Med Low Hi Low Med Hi EFFORT REQUIRED 7 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 8. Impact on Process Definition of Impact: • The effect change will have on the process in terms of improving service – cost - quality Typical Little or No Impact: • Creating or revising a report • Installing a measurement system • Quantifying the performance of a process • Reducing cycle time of a non-bottleneck operation 8 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 9. Effort Required Definition of Effort: • Your time, time required of the team members, and any expenditure of money Typical High Effort: • Installing a new computer system • Requires changes to regulations or statutes • “Fixing” the annual planning process 9 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 10. Definition of Probability of Success Assess the various risk factors: • Time - uncertainty of the completion date • Effort - uncertainty of the investment required • Implementation - uncertainty of roadblocks Typical Low Probability of Success: • Won’t show the benefits within a year • Depends upon completion of other risky projects • Requires help from extremely busy people • Is not aligned with your objectives 10 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 11. Characteristics of a LeanSigma® Project The Project: • Is linked to a critical agency goal and will positively impact the goal’s metric • Is in line with the project selection criteria used by Executive Leaders • Deals with an issue or problem that is linked to a process with clearly defined begin and end points • Has easily identifiable internal or external Customers who use or receive the output from the process • You’re able to find out how the output is used by the Customer • You’re able to find out why the output is important to the Customer 11 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 12. Characteristics of LeanSigma® Project A Project: • Has a measure you can clearly identify and impact • Is one in which you can show how improvements will impact service, cost and quality • Has the organizational support to make it happen • Has a champion who cares about the improvement and has the authority to approve time and resources • Has identified process owner(s) 12 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 13. Identify Initial Scope of the Event Answer these questions to prepare for next steps: • Why was this area / project chosen? • Whatspecific process or piece of the process will we focus on? • What are the measures of success? 13 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 14. Identify Key Participants Event Sponsor: • This person typically owns the process where the event is taking place • Helps team members get time away to do the event • Removes roadblocks and supports the process 100% Team Leader: • Best if this person is from an outside department or agency • Has had previous continuous improvement experience • Helps with logistics and planning of the event • Helps lead the team during the event Team Members: • Key managers and staff who work in or with the process 14 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 15. Scoping Event (Pre-event Meeting) • This should take place 2 – 5 weeks prior to the actual event and will take 3 – 4 hours • The following should be completed during this time: • High level review of Lean concepts and what to expect during the Kaizen week • Refine the scope (Use SIPOC if necessary) • Develop objectives and goals • Determine pre-work and data collection required to understand current state / baseline metrics • Finalize participant list and roles (dedicated, on-call, etc) 15 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 16. SIPOC • Definition • Documents a process from the suppliers to customers. • The name comes from the column headings on the form: Suppliers, Inputs, Process, Outputs, and Customers • Purpose • Identify and balance competing (internal and external) customer requirements • Identify gaps in requirements and the process outputs or inputs • Identify suppliers of the process inputs • Aid in identification of data collection needs • Establish the right metrics and improvement priorities • Use as a tool to continuously verify customer requirements 16 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 17. SIPOC • Definition of a Process • A series of activities that transform a set of inputs into a specific set of outputs. Everything we do is a process. • Components of a Process • Inputs: Inputs are man / person, method, material, machine,measurements, and mother nature / environment (referred to as the “6M’s”) • Transformation: Series of steps or tasks that change (transform) the inputs. • Outputs: Goods, services, or consequences 17 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 18. Who is the Customer? • Process: Description of a process that provides outputs to meet the needs (expressed or implied) of Customers • Input and output boundaries: Define the start and stop boundaries of the process • Outputs: Delivered products or services that should satisfy the Customer expectations and meet or exceed the customer requirements • Customers: The people who receive the outputs, and those who put requirements on the outputs, but do not receive the output 18 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 19. SIPOC Elements 2 7 How 5 What does does the the process process What does Who is the expect from start? each customer supplier of each input? expect from each input? 6 3 each output? 4 8 1 What are What Inputs are required to What is the the outputs Who is the enable this process? from the customer process to process? of each occur? output? 2 How does the process end? 19 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 20. SIPOC Example DEQ - Office of Compliance and Enforcement S upplier I nputs P rocess O utput C ustomer Inspectors Evidence Document FERA Public of Violation 3-6 Weeks Lab Complaints Refer Case 1-2 Final Order EPA Months Public Regulatory Develop News Violator Interpretation (Issue) FEA 3-6 Release Months Other PEN Appeal Ref. Program 3-4 Agencies Months Program Review Final Order 2-4 PEN Media Weeks HR Labor OCE Violators Guidance 20 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 21. Defining Project Objectives / Goals • The project objectives selected need to be documented in the charter • An objective includes • The goal • Associated output (CTQ) measures • Targets • Timeframes (if possible) • Metrics • Time...what is the lead time for this process? • Cost...how much does it cost for people and supplies? • Quality...how much rework is there? • Capture Voice of the Customer to better understand improvement opportunities 21 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 22. Refining Goals and Objectives • Initially, you may not be able to define specific quantitative objectives because you do not have the data available • In these cases • Set general goals and objectives (i.e. make a general statement like “improve productivity by 10%”) • Collect additional data and analyze it – Use best available data • Examples of well defined goals • Reduce the number of incomplete referrals by 40% starting Q2 2009 • Improve the first time quality to 98% of applications received by end of Q2 2009 • 100% of permit evaluations performed within 60 days starting June 1, 2009 22 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 23. Event Pre-work • Data collection prior to the event will be driven by previously defined goals and objectives • Reduce incomplete referrals by 40%...Collect quality data (how many incomplete referrals come in today?) • Improve the first time quality to 98%... Collect quality data (what is our current first pass yield-FPY?) • 100% of permit evaluations performed within 60 days... How many evaluations take longer? How long? • Bring copies of all reports, logs, screen shots, SOP’s, etc • If required data is not available, you may need to perform “real-time” data collection for the weeks prior to the event 23 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 24. Finalize Participants and Determine Roles • Start with the “Thirds” rule of thumb – • 1/3 of the participant work directly in the process (SME’s) • 1/3 of the participants are managers or supervisors in the process • 1/3 of the participants are “outside eyes”. These may be customers or other external stakeholders • Make sure the team is not heavily loaded with one department or group. A cross-functional team that represents the entire process is most effective 24 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 25. Finalize Participants and Determine Roles (cont) • If the process uses support functions such as IT, HR, accounting, legal, etc. – invite them • Some resources will be “on-call”. This is usually driven by their availability to give a full week. • Keep the team size in the 10 – 14 range if possible. • Event observers are acceptable but cannot actively participate in the improvement event • All team members should manage their time away as if they are out of town. They should be dedicated to the event. 25 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 26. Key Takeaways • Involve sponsors and stakeholders from the beginning and get buy-in • Build a cross functional team including customers of the process. Review and modify team if scope changes significantly • Establish clear boundaries – what is in scope / out of scope • Understand where the “buckets of time” reside in the process so you don’t miss opportunities • Set clear, specific and measurable goals • Identify and collect data to define current state and support goals • Communicate – Communicate - Communicate 26 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.
  • 27. Questions 27 © 2009 Guidon Performance Solutions, LLC. All rights reserved. Guidon Performance Solutions is a licensee of LeanSigma®, a service mark of TBM Consulting Group.