Toc Lecture Presentation
 

Toc Lecture Presentation

on

  • 2,219 views

 

Statistics

Views

Total Views
2,219
Views on SlideShare
2,218
Embed Views
1

Actions

Likes
2
Downloads
118
Comments
0

1 Embed 1

http://www.slideshare.net 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Toc Lecture Presentation Toc Lecture Presentation Presentation Transcript

    • Theory of Constraintsand capacity planning
      Matt Archey
      Kevin Drakes
      GurpreetKingra
      Nitin Sharma
    • Theory of Constraints (TOC)
      An overall management philosophy
      introduced by Dr. Eliyahu M. Goldratt in his 1984 book titled The Goal,
      Geared to help organizations continually achieve their goal.
      TOC seeks to identify the constraint and restructure the rest of the organization around it
    • Five Focusing Steps
      Assuming the goal of the organization is to "Make money now and in the future," the steps are:
      Identify the constraint (the resource or policy that prevents the organization from obtaining more of the goal)
      Decide how to exploit the constraint (make sure the constraint's time is not wasted doing things that it should not do)
      Subordinate all other processes to above decision (align the whole system or organization to support the decision made above)
      Elevate the constraint (if required or possible, permanently increase capacity of the constraint; "buy more")
      If, as a result of these steps, the constraint has moved, return to Step 1. Don't let inertia become the constraint.
    • Implementing the Theory of Constraints (TOC) in Production
      Job Shops 
      A process where similar machines, or people who are doing similar operations, are grouped together.
      Work moves in a sequence between these specialist areas, sometimes flowing back the way it came to a previous area before continuing on in the process.
    • Flow Shops 
      Machinery/people are sequenced throughout the plant in the order that most work will require.
      Work might be unique or a repetition of a standard design.
      Each job could consist of a single unit or a batch of many units.
      Examples
      Furniture companies that produce for the retail trade are usually a flow shop.
      Tool bit manufacturers are another example.
      Electronics
      Automotive, however, as the diversity of products decreases and the batch size increases the flow in parts of these flow shops becomes more and more continuous. Ultimately theses parts may become a dedicated flow shop – one flow or process for one product or product family.
    • Mass Production
      Production of large amounts of standardized products, including and especially on assembly lines.
      Various kinds of products:
      Fluids and particulates handled in bulk (such as food, fuel, chemicals, and mined minerals)
      Discrete solid parts (such as fasteners)
      Household appliances and automobiles.
    • Capacity Planning and its Goal
      Capacity planning is the process of determining the production capacity needed by an organization to meet changing demands for its products or in other words it is defined as systematic approach that focuses on actively managing constraints that are impeding progress.
      The goal of capacity planning is to provide satisfactory service levels to users in a cost-effective manner.
    • Examples of Capacity Measures
    • CAPACITY PLANNING
      Expansionism
      “Wait-and-See”
    • Steps for Capacity Planning
      Estimate future capacity requirements
      Evaluate existing capacity
      Identify alternatives
      Conduct financial analysis
      Assess key qualitative issues
      Select one alternative
      Implement alternative chosen
      Monitor results
    • Forecasting Methods
    • MOVING AVERAGES
    • MOVING AVERAGES (CONT’D)
      UNITS
      TIME
    • EXPONENTIAL SMOOTHING
    • EXPONENTIAL SMOOTHING (CONT’D)
      UNITS
      TIME
    • TECHNIQUE COMPARISON
      MOVING AVERAGES
      EXPONENTIAL SMOOTHING
    • SEASONALITY
      1. Compute sample mean of all data
      2. Divide each observation by sample mean to find seasonal factors
      3. Find average of seasonal factors for like seasons
      4. Multiply sample mean by average seasonal factor to obtain forecast
    • OTHER CONSIDERATIONS
      Loss of sale penalties
      Public image
      Profit
      Holding Costs
      Storage
      Set-up costs
      Transportation Limitations
    • Unable to keep up with demand
      Insufficient capacity among raw material suppliers
      Unable to transport materials to required locations
      Often under-produced by factor of 10, or overproduced by factor of 2
      Implemented quick response corrections
      Asked customers to place orders in advance
      Implement air freight delivery systems
      Turned to forecasting to meet future demands
      Team of employees research market
      Reduced stock-out and markdown costs from 10.2% to 1.8%
    • Capacity Planning for Services
      Large fluctuations in demand
      Inventory often not an option
      Problem often is to match staff availability with customer demand
      May attempt to shift demand to off-peak periods
      Can measure capacity in terms of inputs
    • Example Using Decision Trees: A restaurant owner has determined that she needs to expand her facility. The alternatives are to expand large now and risk smaller demand, or expand on a smaller scale now knowing that she might need to expand again in three years. Which alternative would be most attractive?
      The likelihood of demand being high is .70
      The likelihood of demand being low is .30
      Large expansion yields profits of $300K(high dem.) or $50k(low dem.)
      Small expansion yields profits of $80K if demand is low
      Small expansion followed by high demand and later expansion yield a profit of $200K at that point. No expansion at that point yields profit of $150K
    • Evaluating the Decision Tree
      At decision point 2, choose to expand to maximize profits ($200,000 > $150,000)
      Calculate expected value of small expansion:
      EVsmall = 0.30($80,000) + 0.70($200,000) = $164,000
      Calculate expected value of large expansion:
      EVlarge = 0.30($50,000) + 0.70($300,000) = $225,000
      At decision point 1, compare alternatives & choose thelarge expansion to maximize the expected profit:
      $225,000 > $164,000
      Choose large expansion despite the fact that there is a 30% chance it’s the worst decision:
      Take the calculated risk!
    • What is a Healthcare Surge?
      ……an excess in demand over capacity in hospitals, long-term care facilities, community care clinics, public health departments, other primary and secondary care providers, resources and/or emergency medical services
    • Surge Capacity Basics
      Staffing: Licensed healthcare professionals and
      support staff
      Medical supplies and equipment: pharmaceuticals, personal protective equipment, portable and fixed decontamination systems, isolation beds, ventilators, masks
    • Measuring the Gap: 2006 California Healthcare Surge Capacity Survey
      Standardized definitions for crisis care:
      Nurse-to-patient staffing ratio of 1:5 for Critical Care Beds and 1:20 for Other Medical-Surgical Beds
        Assume self-sustainment within the facility for a minimum of 72 hours without re-supply of equipment, supplies or staff
      Assume 30% of staff will not report to work
    • Measuring the Gap (cont)
      Response:
      324 hospital: 80 percent of California’s 73,000 operating licensed acute care hospital beds
      California’s local health departments
      172 community clinics
      Identified 19,963 beds California hospitals said they can surge
      Bed shortages:
      Los Angeles area
      Pediatric beds
    • Greater Gaps in Meeting Needs of a Catastrophic Event
      Using CDC’s Flu Surge 2.0 computer modeling program for pandemic influenza:
      California needs 58,723 surge beds for a moderatepandemic influenza
      38,760 beds or 194% above the 19,963 surge beds California hospitals said they can surge.
    • Analysis of 2006 Survey Results
      California has sufficient surge capacity for a Moderate event: regional earthquake, fire, flood, or bioterrorist attack.
      California’s surge capacity is insufficient for a Catastrophic event: statewide impact, e.g., Katrina-like event or pandemic influenza.
    • 2006 Healthcare Surge Initiative The State of California spent $172 million to improve its medical surge capacity
    • Types of constraints in services
      Broad categories of constraints:
      Market constraints: defined by demographic and socioeconomic factors. For example, a retired community is highly unlike to use products involving advanced computer technology.
      Capacity constraints: created by inadequate labor and equipments.
      Logistical constraints: do not play major role but related to movement of supporting material, such as papers.
      Managerial constraints: are the strategies and policies that adversely affect system performance.
      Behavioral constraints: involve employee action aimed at pleasing management that may adversely affect the customer.
    • TOC in surgery center
      Four stations for patient processing:
      Administrative intake
      The blood lab
      X-ray (constrained department)
      Administrative discharge
      • Based on past experience a buffer of 3 patients is allowed in the X-ray waiting room, in order to keep X-ray doing at all time.
      • If buffer is full, new patient will not be admitted to administrative intake.
      • Surgery centre find that patients are less disruptive in administrative intake than in the X-ray waiting room.
    • Benefits for Surgery centre
      • Surgery centre used this experience to make appointment for X-ray and blood work test.
      Patient satisfaction: any delay in patient testing and treatment become personally intolerable. By eliminating these delay, the patient can be discharged sooner and the patient's overall satisfaction is increased.
      Throughput vs. Cost Control: system generate high throughput by exercising effective cost control.
    • TOC in Banks
      Banking industry in the US has changed dramatically in recent years. Banks operate in local and regional level.
      Banks must develop formal technology acquisition strategies that focus on process improvement that enable them to better satisfy customer needs.
      Competitors that have world class capabilities can readily and quickly duplicate any product offering.
      Banks compete for customers using such dimensions:
      Cost- to effectively compete on price, banks have to offer low price by cutting cost. Banks require to offer customers attractive return on deposits.
      Flexibility- involves the ability of bank’s systems to introduce new products in a cost effective manner.
      Time- how quickly new products can be delivered.
      Quality- involves aspects related to process that deliver the product and post delivery service( relationship banking)
    • Continue…
      In the banking business, the three measures of TOC are exercised as follow:
      Throughput: is the rate at which banking system generates revenue for service provided in a way consistent with goal. Bank generate money by offering a variety of service such as wire transfers, foreign exchanges, and cashier’s check.
      Operating expenses: all the money the bank spends in the process of generating throughput. These expenses include all direct and indirect expenses except for the cost of obtaining money in the market.
      Inventory investment: amount of money spent by a bank to raise capital necessary to generate throughput. It consists principle amount and interest.
    • Benefits of TOC
      Throughput can be enhanced by increasing the number of borrowers, investment projects, and both the number and amount of transactions.
      Operating expenses can be reduced by making operations more efficient (e.g., through investment in technology).
      Inventory investment can be reduced by reducing the cost of borrowing. Banks offers low interest on short term and small deposits, it is beneficial for bank to attract small term depositors which increases the number of transactions.
    • TOC in Restaurant
      Burger King produces 34227 sandwiches per 172 hours. Average production is 198 sandwiches per hour.
      Burger king experience higher than normal volume on Friday and at 12:00 PM
      Burger King need to produce 256 sandwiches during peak hours.
      Constraints:
      Assembly step can produce 200 sandwiches per hour.
      Upstream processes produces more than 200 sandwiches.
      Maximum through put is 200 sandwiches per hour.
    • How they managed constraints?
      Eliminate defects at the constraint: means waste is eliminated.
      Improve quality steps in front of constraints: made sure parts entering the assembly steps are free of defects.
      Support the constraints: added labor to the constraint
      Appropriately used buffer: reduced variation in front of the constraint.
    • Key assumption
      Organizations can be measured and controlled by variations on three measures:
      throughput
      Throughput is money (or goal units) generated through sales.
      operating expense
      Operating expense is money that goes into the system to ensure its operation on an ongoing basis.
      Inventory
      Inventory is money the system invests in order to sell its goods and services.
    • REFERENCES
      Nahmias, Steven. Production and Operations Analysis, 6th edition.
      Lyman, B. Planning for Surge Capacity in Health Care Services. Department of Public Health.
      “Managing Constraints Under Peak Volumes”. Shmula.
      “Theory of Constraints Production.” <http://www.dbrmfg.co.nz/Productioin.htm>
      example