0
Renewable Power - Remote Sites   Mobile Phone Transmission Towers
Repeater Towers Require Power Supply To Transmit Rs.3 Lacs per km of power line extension 10 km = Rs.30 Lacs
Repeater Towers Require Power Supply To Transmit Battery Diesel Generator Annual Diesel use 17520 liters  ( @ 16 hrs opera...
Repeater Towers Require Power Supply To Transmit <ul><li>Various Types of Repeaters – Different Power needs </li></ul><ul>...
Alternative/ Renewable Energy  for Repeater Towers   Intelligent Controller Remote Control thru Internet Micro wind turbin...
Natural Heights for micro wind turbines at no extra cost Reduces turbulence effect Improves Generation
The Solar Array
 
The Solar Array
1.Solar charge   controller 2.Wind controller and dump load 3.Output voltage control 4.Battery S.O.C monitor 5.Auto DG sta...
Battery  The heart  of the system. <ul><li>  </li></ul>
Wind Turbine Power Generation at Various Wind Speeds 750 500 300 150 Whisper 500 250 200 125 60 Whisper 200 150 100 60 25 ...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year 10kw generator 17520 lits pa 12000 (33KW/Day) 9000...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.20 Lacs...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year 10kw generator 17520 lits pa 6570 (18kwh/Day 4745 ...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.20 Lacs...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year 10kw generator 17520 lits pa 11000 (30kwh/Day 9000...
Wind Solar Power Generation Vs Diesel  Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.43 Lacs...
 
 
Wind map of India
 
Battery use in Cycling Applications   Cycle Life Vs depth of discharge 30% 50% 80% 400 1000 1200 ?? 2000 ?? Small smf Larg...
Cycle Life Vs Depth of Discharge 30% 50% 80% 1400 2500 tubular
Time required for Recharge 80% 20% 5 to 6 hrs + 5 hrs 4 to 5 hrs + 20 hrs tubular smf
 
Battery discharge – recharge profile 80ah = 25% 20ah in 1 hr 300 ah smf 30ah in +10 hrs 40A X 2hr Power cut before full re...
Next discharge 80ah = 30% 50ah in 2 hr 270 ah smf 30ah in +10 hrs Last discharge This discharge 30ah in +20 hrs 300 ah smf
Unequal Cell Behavior – Leads to Battery Bank Failure  100% 80% 90% 85%
How to Save the Battery ? <ul><li>Monitor State of Charge </li></ul><ul><li>Monitor Health </li></ul><ul><li>Impart freshe...
How to Save the Battery ? <ul><li>Replace faulty cells in time </li></ul><ul><li>Do not allow very deep discharge </li></u...
How to Save the Battery ? <ul><li>Battery Remote Monitoring </li></ul>
Upcoming SlideShare
Loading in...5
×

Presentation Of Ren Energy

631

Published on

ALTERNATIVE POWER SOLUTIONS FOR REMOTE TELECOMMUNICATION BASE TOWERS

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
631
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
31
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Presentation Of Ren Energy"

  1. 1. Renewable Power - Remote Sites Mobile Phone Transmission Towers
  2. 2. Repeater Towers Require Power Supply To Transmit Rs.3 Lacs per km of power line extension 10 km = Rs.30 Lacs
  3. 3. Repeater Towers Require Power Supply To Transmit Battery Diesel Generator Annual Diesel use 17520 liters ( @ 16 hrs operation per day Rs.700000 per year – only fuel)
  4. 4. Repeater Towers Require Power Supply To Transmit <ul><li>Various Types of Repeaters – Different Power needs </li></ul><ul><li>500 to 600 watts 24 hours a day for 365 days = 14 Kwh / day </li></ul><ul><li>1800 watts 24 hours X 365 days = 48 Kwh / day </li></ul>
  5. 5. Alternative/ Renewable Energy for Repeater Towers Intelligent Controller Remote Control thru Internet Micro wind turbine Solar P V Battery Generator
  6. 6. Natural Heights for micro wind turbines at no extra cost Reduces turbulence effect Improves Generation
  7. 7. The Solar Array
  8. 9. The Solar Array
  9. 10. 1.Solar charge controller 2.Wind controller and dump load 3.Output voltage control 4.Battery S.O.C monitor 5.Auto DG start stop 6.AC/DC Battery charger 7.Power input output data integrator 8. Remote monitoring & control System Master Controller
  10. 11. Battery The heart of the system. <ul><li> </li></ul>
  11. 12. Wind Turbine Power Generation at Various Wind Speeds 750 500 300 150 Whisper 500 250 200 125 60 Whisper 200 150 100 60 25 Whisper 100 60 45 25 10 Air X 14mph (6.3m/s) 12mph (5.4m/s) 10mph (4.5m/s) 8mph (3.6m/s) Machine type Power Generation per month in kilo watt hour Vs annual average wind speeds
  12. 13. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year 10kw generator 17520 lits pa 12000 (33KW/Day) 9000 (24KW/day) 5000 watts 1800 watts 3200 watts 5kw generator 8000 liters pa 3720 (10kwh/day) 3120 (8.5kwh/day) 1500 watts 500 watts 1000 watts 5kw generator 8000 liters pa 2700 (7.4kwh/day) 2100 (5.7kwh/day) 1500 watts 600 watts 900 watts Equivalent Generator fuel Consumption Generation at 6.3 m/s KW hr pa Generation at 5.4 m/s KW hr/ annum Installed Capacity Solar Photovoltaic Capacity Wind Turbine Capacity
  13. 14. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.20 Lacs + 4 Lacs Diesel 12000 (33KW/Day) 9000 (24KW/day) 5000 watts Rs.16 Lacs 5kw generator 8000 liters pa Rs.8 Lacs + 1 Lac Diesel 3720 (10kwh/day) 3120 (8.5kwh/day) 1500 watts Rs.16 Lacs 5kw generator 8000 liters pa Rs.7 Lacs 2700 (7.4kwh/day) 2100 (5.7kwh/day) 1500 watts Diesel cost 5 years Equivalent Generator fuel Consumption Cost of wind solar Generation at 6.3 m/s KW hr pa Generation at 5.4 m/s KW hr/ annum Installed Capacity
  14. 15. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year 10kw generator 17520 lits pa 6570 (18kwh/Day 4745 (13kwh/day) 5000 watts 1800 watts 3200 watts 5kw generator 8000 liters pa 2190 (6kwh/day) 1460 (4kwh/day) 1500 watts 500 watts 1000 watts Equivalent Generator fuel Consumption Generation at 4.5 m/s KW hr pa Generation at 3.6 m/s KW hr/ annum Installed Capacity Solar Photovoltaic Capacity Wind Turbine Capacity
  15. 16. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.20 Lacs +9 Lacs Diesel 6570 (18kwh/Day 4745 (13kwh/day) 5000 watts Rs.16 Lacs 5kw generator 8000 liters pa Rs.8 Lacs + 2 Lacs Diesel 2190 (6kwh/day) 1460 (4kwh/day) 1500 watts Cost of Diesel 5 years Equivalent Generator fuel Consumption Cost of Wind Solar Generation at 4.5 m/s KW hr pa Generation at 3.6 m/s KW hr/ annum Installed Capacity
  16. 17. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year 10kw generator 17520 lits pa 11000 (30kwh/Day 9000 (25kwh/day) 8700 watts 5000 watts 3200 watts 5kw generator 8000 liters pa 3650 (10kwh/day) 3120 (8.5kwh/day) 2500 watts 1500 watts 1000 watts Equivalent Generator fuel Consumption Generation at 4.5 m/s KW hr pa Generation at 3.6 m/s KW hr/ annum Installed Capacity Solar Photovoltaic Capacity Wind Turbine Capacity
  17. 18. Wind Solar Power Generation Vs Diesel Genset Fuel consumption per year Rs.32 Lacs 10kw generator 17520 lits pa Rs.43 Lacs + 5 Lacs Diesel 11000 (30kwh/Day 9000 (25kwh/day) 8700 watts Rs.16 Lacs 5kw generator 8000 liters pa Rs.12.5 Lac + 1 Lac Diesel 3650 (10kwh/day) 3120 (8.5kwh/day) 2500 watts Diesel Cost 5 Years Equivalent Generator fuel Consumption Wind Solar Cost Generation at 4.5 m/s KW hr pa Generation at 3.6 m/s KW hr/ annum Installed Capacity
  18. 21. Wind map of India
  19. 23. Battery use in Cycling Applications Cycle Life Vs depth of discharge 30% 50% 80% 400 1000 1200 ?? 2000 ?? Small smf Large smf
  20. 24. Cycle Life Vs Depth of Discharge 30% 50% 80% 1400 2500 tubular
  21. 25. Time required for Recharge 80% 20% 5 to 6 hrs + 5 hrs 4 to 5 hrs + 20 hrs tubular smf
  22. 27. Battery discharge – recharge profile 80ah = 25% 20ah in 1 hr 300 ah smf 30ah in +10 hrs 40A X 2hr Power cut before full recharge
  23. 28. Next discharge 80ah = 30% 50ah in 2 hr 270 ah smf 30ah in +10 hrs Last discharge This discharge 30ah in +20 hrs 300 ah smf
  24. 29. Unequal Cell Behavior – Leads to Battery Bank Failure 100% 80% 90% 85%
  25. 30. How to Save the Battery ? <ul><li>Monitor State of Charge </li></ul><ul><li>Monitor Health </li></ul><ul><li>Impart freshening Charge – Equalize </li></ul>
  26. 31. How to Save the Battery ? <ul><li>Replace faulty cells in time </li></ul><ul><li>Do not allow very deep discharge </li></ul><ul><li>Change Battery type – Charging Algorithm </li></ul>
  27. 32. How to Save the Battery ? <ul><li>Battery Remote Monitoring </li></ul>