    New Directions in Project Management - Presentation Transcript

    1. New Directions in Project Management Issues and Concerns for a Developing Country Like India
    2. Agenda
      • The Brief for this Lecture
      • The Background Scenario
      • The State of the Art in Project Management
      • Issues and Concerns in India
      • Case Study – Sarayu Water Project
      • Knowledge – Based PM Systems Design and Analysis
      • Conclusions
    3. Brief for this Lecture
      • University of Missouri-Rolla to teach a Project Management Course with an International flavor to a group of General Motors students
      • Request from Dr. Benjamin L. Dow, Jr., Assistant Chair for Extended Studies
      • Basic concepts of Project Management, with cultural differences, management nuances, and contract issues highlighted
      • Helpful to have a Case Study to illustrate above concepts
      • Distance education course over the Internet
    4. Background Scenario
      • Faculty, Dr Parameshwar P Iyer (PPI), has over 20 years of experience in research, teaching, and consulting in PM
      • There has been a rather sluggish growth of PM profession in India: the total number of PM professionals estimated at about 25,000; with less than 5000 PMP Certified Project Managers (Exhibit I, next slide)
      • PPI has provided PM education to over 2500 engineers and managers from industry
    5. Background Scenario
      • -
      27500 25000 2500 2005 16750 15000 1750 2000 13300 12500 800 1990 10500 10000 500 1985 Total PM ‘s Non PMP PMP in India Year
    6. Background Scenario – Approach to this Lecture
      • Will first review the basics of PM
      • One Case Example Project, SYSNET, will be used to illustrate fundamental concepts
      • Will then present some India-specific nuances, cultural aspects, and contract issues relating to practice of PM
      • A larger Case Study, concerning a River Water Project, called Sarayu, will follow
      • Will make a case for the development of Knowledge – Based PM Systems Design and Analysis Techniques
    7. State of the Art in PM
    8. Project Management Defined
      • Basic characteristics of modern projects
      • What is project management ?
      • The need for project management
      • Types of project managers
      • The forms of project management
    9. PM – The Systems Approach
      • Some basic systems concepts
      • A general systems approach
      • A project as a system - the lifecycle concept
      • A systems design algorithm
    10. Project Organization
      • Formal and informal organization structure
      • Forms of organization structures
      • Requirements of a project organization
      • Matrix organization structure
      • Pure project organization structure
      • Selecting a project organization structure
    11. Work Definition and WBS
      • Planning the project work
      • Work Breakdown Structure (WBS)
      • Responsibility chart and responsibility matrix
      • Integrating the WBS and the organization structure
    12. Project Scheduling
      • Activities , events , and work packages
      • Gantt charts
      • Network scheduling
      • Programme Evaluation and Review Technique (PERT) : Single-time estimate
      • PERT : Three-time estimates
      • Critical Path Method (CPM)
      • Project scheduling with resource constraints
    13. Project Costing and Assessment
      • Cost estimation and budgeting
      • Project cost accounting system (PCAS)
      • Cost schedules and forecasts
      • Financial evaluation of a project
      • Social cost-benefit analysis
    14. Project Monitoring and Control
      • Phases and types of project control
      • Variance analysis of project performance
      • Problems of project control
      • The role of the project manager
      • Teamwork and leadership functions
      • Computers in project management
    15. SYSNET Case Project
      • Design, fabrication, installation of a parcel transport, storage, and database system for trans-shipment of containers
      • Basic design, hardware design, software development, and on-site operations
      • WBS is a combination type, 19 work packages, costing from $200 to $2000, durations from 1 to 10 weeks, total project cost $20,000 and duration of 47 weeks
    16. WBS of SYSNET Project
    SlideShare Zeitgeist 2009

    + guestbb073eeguestbb073ee Nominate

    custom

    1054 views, 0 favs, 0 embeds more stats

    This is the presentation made to the engineers and more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1054
      • 1054 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 99
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories