• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Azerbaycan referans
 

Azerbaycan referans

on

  • 1,213 views

 

Statistics

Views

Total Views
1,213
Views on SlideShare
1,213
Embed Views
0

Actions

Likes
0
Downloads
2
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Azerbaycan referans Azerbaycan referans Presentation Transcript

    • BÝlesuvar Olympic Training Complex GÖNKA A.S. Azerbaijan References GÖNKA
    • BÝlesuvar Olympic Training Complex ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA Bilesuvar Olympic Training Complex The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2008 Chiller Air Cooled Fan Coils Ceiling & Wall Type Air Handling Units Boiler Systems 2008 Are used in complex 2/3
    • Baku Turkish Anatolian High School Baku Turkish Anatolian High School 2008 4/5 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Baku Turkish Anatolian High School Baku Turkish Anatolian High School T.C. Ministry of Education From time to time school teacher who has visited or invited A school in Physics, Biology and Chemistry-A has a Computer and Azerbaijan Respublikasý Study on Nazir February 28, 1992 guests or conferences for students in this hall is carried Laboratory. In all three laboratories are in a position to according to the memorandum of understanding signed on out.Understanding of technical systems in conference rooms respond to needs in terms of materials. Physics, Chemistry 24.01.1994 was opened. with a modern arrangement was.Every moment ready and Biology teachers try in this laboratory, as well as have the School, celebration of certain days and weeks, panel, sound system, computer and projection equipment are ability to make the computer-aided instruction. debate and cinema shows a conference room of 200 available. people can be made available.
    • Göyçay Olympic Training Complex Göyçay Olympic Training Complex The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009 2009 6/7 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Boiler house, pump station and piping whole mechanical job Ductwork Chiller Air Cooled Fan Coils Ceiling & Wall Type Air Handling Units Boiler Systems Are used in complex
    • Hövsan Olympic Training Complex Hövsan Olympic Training Complex ! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA ! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009 Chiller Air Cooled Fan Coils Ceeling & Wall Type Air Handling Units Boiler Systems Are used in complex 2009 8/9
    • Air cooled liquid chiller GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level. groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency. high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor. comfort and industrial purposes. circuit elements entirely independent for every compressor. Hardconstruction and long life. R22 , R134a or R407c options. Easy handling, installation and service. Electrical Screen and Control Board; board including Compressors; Half hermetic screw compressors. Effortless service. switch and micro-processor controlled module and control Compressors changing between 1 and 4 according to Compatible with available BMS systems. cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way cooling capacity. elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives. Condenser; Highly efficient, original condenser situated in V Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value. low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures. condenser. electrical diagram. Rational control.
    • Serin Hotel Baku Serin Hotel Baku 2006 10/11 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Air cooled liquid chiller GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to comfort and industrial purposes. comfort and industrial purposes. comfort and industrial purposes. R22 , R134a or R407c options. R22 , R134a or R407c options. R22 , R134a or R407c options. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to cooling capacity. cooling capacity. cooling capacity. Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the condenser. condenser. condenser.
    • Balaken Olympic Training Complex Balaken Olympic Training Complex The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009 2009 Chiller Air Cooled Fan Coils Ceiling & Wall Type Air Handling Units Boiler Systems Are used in complex 12/13
    • ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Baku Administration Of The National Archive Building Baku Administration Of The National Archive Building 2008 14/15 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Air handling unit Standard Accessories; Standard Series Optional Accessories; ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and different productivity levels on demand. microprocessor control unit. ! 8 different models which provide required humidity ! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity. range of 3000m³/h and 100.000 m³/h. electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for ! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air. structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board. Rubber gaskets which reduce air leakage through blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter galvanized iron in a standard way. ! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a and high duct pressures,. standard way.
    • Hb Clinique Baku Hb Clinique Baku 2007 16/17 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Packaged hygienic air conditioner Laminar flow air system ! Highly efficient filtration of supply and extract air. ! HEPA filters which clean filtrated air before going into ! Maximum function control: room temperature and operating room. relative humidity control throughout the year. ! Mounting situated in ceiling of the operating theatre in ! Meeting fresh air that surgical operations require such a way that it should locate over operating table. ! Quiet and non-vibrating operation that operating theatres require. ! Stainless steel air distribution box, Hepa filters, ! An independent system which is under direct control of transparent air distributor (laminarizator) and pendant authorized health staff. operating table lighting connection. ! Pressure control in aseptic and septic surgical operations. ! Easy maintenance and disinfection because of ! Continuous control of room temperature and humidity. transparent air distributor's being pulled down. ! Quiet and non-vibrating operation. Operating theatre lighting system made up of airproof ! Replacing the old installation in available places and construction. generally, because their sizes are small, occupying less ! A laminar, vertical air flow from transparent air room than any time before, however available air distributor through operating table prevents turbulent canal and water installation could be, easy erection in any type of health institutions. air flow in conventional air systems and offers a high level cleanliness class around the operating table ! In fan part, one or two directly actuated highly static during the operati pressurized fans to provide required air volumetric flow rate even when filters are choked. ! The system which remove particulates and microbes ! Fans with inverter; St316 stainless steel fans which are from operation part due to laminar flow. used as a higher standard in respect to epoxy dyed ! Special design for operation theatres which require standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, especially high level sterilization in accordance with inverter equipment in supply and extract fans. DIN 1946. ! Air Filters; F5 class filter in fresh air input and F9 class ! Differential pressure sensors. Easy connection filters on the extract side. differential pressure sensors and leakage testing. ! Dx battery; ! Easy installation to all kinds of ceilings. ! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro- process control. ! Compressor; 1 or 2 Scroll Compressors according to the capacity. ! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device. ! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI). ! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
    • Baku Ministry Of Health Topçubaþov Hospital Baku Ministry Of Health Topçubaþov Hospital Laminar flow air system ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. 2008 Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. 18/19 operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
    • ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA Laminar flow air system
    • Serin Hospital Azerbaijan Serin Hospital Azerbaijan 2008 20/21 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Serin Hospital Azerbaijan Packaged hygienic air conditioner ! Highly efficient filtration of supply and extract air. ! Replacing the old installation in available places and ! Dx battery; generally, because their sizes are small, occupying less Vapor humidifiers; Standard steam cylinder, dipping ! Maximum function control: room temperature and ! room than any time before, however available air electrodes, stainless steam distributor and micro- relative humidity control throughout the year. canal and water installation could be, easy erection in process control. ! Meeting fresh air that surgical operations require any type of health institutions. ! Compressor; 1 or 2 Scroll Compressors according to ! Quiet and non-vibrating operation that operating ! In fan part, one or two directly actuated highly static the capacity. theatres require. pressurized fans to provide required air volumetric flow rate even when filters are choked. ! Electrical Board; All of the elements required for the ! An independent system which is under direct control of trouble-proof operation of master switch and device. 2008 authorized health staff. ! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed ! Micro-processor; AC micro-processor control of ! Pressure control in aseptic and septic surgical temperature and relative humidity over all of the operations. standard fans in terms of hygiene and endurance. operation and safety functions integrally (I) or rational- With a view to achieving continuous speed control, ! Continuous control of room temperature and humidity. integrally (PI). inverter equipment in supply and extract fans. ! Quiet and non-vibrating operation. ! PCO2 micro-processor of device control and ! Air Filters; F5 class filter in fresh air input and F9 class adjustment system which provides remote control 22/23 filters on the extract side. terminal with erection inside the clean room.
    • Azerbaijan Military Hospital 300 Bed Azerbaijan Military Hospital 300 Bed Laminar flow air system ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. 2007 Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. 24/25 operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
    • !Hvac equipments for operating theatres are supplied by GONKA ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Central Bank of Azerbaijan Republic ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA Central Bank of Azerbaijan Republic Hvac equipments periodic maintenance are being provided bye GONKA 2009 26/27
    • Hvac equipments periodic maintenance are being provided bye GONKA
    • Azerbaijan Mc Donald’s Azerbaijan Mc Donald’s Centrifugal roof extracts Technical specification The manufactured centrifugal roof Body It is designed according to the bat environment Fan has dense fimed, low sound level and extract unit has been designed for the effective exhaust. it is conditions Galvanized stell frame, aluminium upper cover highperformance.It is easy to open the fan and clean the fin possible to montage in the desired angle with the small are used. Moto-fan group Cenrifugal ventilatör is statically at shot notice. By the help aof special protection cover, itwork sound Ievel it may be used in for the industrial applications and dynamically balanced.Motor serves 380V/50 Hz 900- many years without any problem. Centrifugal roof extract and kitchens. It has been designed for Iong service Iife 1400d/d as astandard and directly coupled with d-phase units designed as direct extraction or combined with a duct without maintenance. The manufacturing range 500-12.000 electirical motor.By this way, it works quitely and without type. m³/h air and 0-50 mmSS pressure. vibration. 2002 28/29 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Baku State University Kitchen And Restaurant Baku State University Kitchen And Restaurant 2008 30/31 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Air handling unit Standard Accessories; Standard Series ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. different productivity levels on demand. ! 8 different models which provide required humidity ! Heating and Cooling Coils; Seamless cooper tubes. In Optional Accessories; and temperature by conditioning air volume in the heating coils, 4 options: warm water, vapor, hot water, ! GONKA vapor humidifier, standard vapor cylinder, range of 3000m³/h and 100.000 m³/h. electrically heated; in cooling coils, 2 options: chilled immersion electrodes, stainless vapor distributor and water and DX (direct expansion). ! The framework which is formed by combination of microprocessor control unit. ! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with ! Mufflers which are made up of coulisses to provide structure which is the least resistant against airflow. plastic and aluminum comers. Rubber gaskets which reduce air leakage through required sound holding capacity. blades to the minimum level. ! Boards which are made up of double skilled ! Plate heat exchanger or Heat recovery wheel for galvanized iron in a standard way. recovery of the heat emitted with exhaust air. ! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in ! Electrical board. type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a and high duct pressures,. ! Frequency Converter standard way.
    • Azerbaijan Gönka Shops and Office Azerbaijan Gönka Shops and Office 2009 32/33 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
    • Fan coil units ! The most important feature of decorative type Fan-Coil ! Low sound level; quality is high level for providing quiet ! Internal frame; Mounting upon originally designed units is their use both with casing and without casing study environment. framework made from galvanized steel together with ! Ideal acoustic and thermal insulation. (concealed) in every position. While ceiling cabinet and battery, fan, motor group, dried pan and dropper. ! Functional remote control. cabinet floor types are mounted inside the room, ! 2 or 3-way On/ Off or rational control. ! Battery; Copper pipe, aluminum fins. concealed types are mounted within ceilings or walls. ! Outer casing; It is made from DKP sheet steel, outside ! Fan and engine group; 1 or 2 fans to provide required Unit models which operate both heating and cooling or and inside of the unit are painted with electrostatic capacity in devices in accordance with capacity table. only heating are available. powder paint against rust and external effects.
    • GÖNKA Azerbaijan References - Hövsan Olympic Training Complex - Baku Turkish Anatolian High School - Göyçay Olympic Training Complex - Serin Hotel Baku - Balaken Olympic Structure - BÝlesuvar Olympic Structure - Baku Administration Of The National Archive Building - Hb Clinique Baku - Azerbaijan Baku Endos. Hospital - Azerbaijan Military Hospital 300 Bed - Karwan Mtk Azerbaijan - Ata Okul Azerbaijan - Serin Hospital Azerbaijan - Baku Ministry Of Health Topçubaþov Hospital - Baku State University Kitchen And Restaurant FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE Sincan Organize Sanayi Nasimi Rayonu, . Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7, Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29 Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29