• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Afganistan ing referasn albümü hg
 

Afganistan ing referasn albümü hg

on

  • 574 views

 

Statistics

Views

Total Views
574
Views on SlideShare
574
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Afganistan ing referasn albümü hg Afganistan ing referasn albümü hg Presentation Transcript

    • GÖNKA GÖNKA A.S. Afghanistan References Afghanistan National Army Military Hospital
    • Afghanistan National Army Military Hospital Renovation of the Afghanistan National Army Military Hospital Location: Kabul, Afghanistan Project Description: Project Start Date:: 01.10.2004 ! Renovation of existing Military Hospital in Kabul Project Completion Date: : 01.04.2006 ! Project consists of patient care building, operationsz Client: US Army building, kitchen, wastewater treatment, rehabilitation building, polytechnic institute, morgue, engineering offices, workshops, administration building ! Approximately 45,000 sqm construction area 2006
    • 2/3 2008 Design/Build Communication Support Element Upgrade (CSE) Element Upgrade (CSE) Design/Build Communication Support
    • Design/Build Communication Support Element Upgrade (CSE) Location: Kabul, Afghanistan Project Start Date: : 11.01.2007 Project Completion Date: : 11.01.2008 Client: USACE Afghanistan Engineer District Project Description: This project consists of the design and construction of upgrading an existing compound and new additions in Kabul, Afghanistan. The work will take place on the existing Compound. The purpose of this expansion is to support a 600-soldier Communications Support Element (CSE) compound. Guard houses, maintenance buildings, dormitory building, communication, training building and all required utility works will be constructed.
    • 2/3 2008 Design/Build Communication Support Element Upgrade (CSE)
    • Air handling unit Standard Accessories; Standard Series Optional Accessories; ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and different productivity levels on demand. microprocessor control unit. ! 8 different models which provide required humidity ! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity. range of 3000m³/h and 100.000 m³/h. electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for ! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air. structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board. Rubber gaskets which reduce air leakage through blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter galvanized iron in a standard way. ! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a and high duct pressures,. standard way.
    • GÖNKA Afghanistan References - Afghanistan National Army Military Hospital - Design/Build Communication Support Element Upgrade (CSE) - Qandahar Ana Brigade Project Communication Building - Contrack Int. Inc. - U.S. Army Corps. - Afganistan FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE Sincan Organize Sanayi Nasimi Rayonu, . Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7, Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29 Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29
    • 2005 Qandahar Ana Brigade Project Communication Building ANA Brigade Headquarters construction begins in Farah KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started recently. The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers. General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important step in the development of the ANA. “We are very happy to see the construction of a new base that will become one of the most important in western Afghanistan.” The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year. Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn, Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100 men in Qal-e Kah. Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast construction, a building method new to Afghanistan Project Under Construction Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a required part of the contract. The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters, and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a 6MW prime power plant and electrical distribution system, and other buildings to serve the base. 2/3
    • Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEY Sincan Organize Sanayi Bölgesi Tel :+90 312 267 09 90(pbx) Göktürk Caddesi No : 6 Fax:+90 312 267 09 93 Sincan / ANKARA / TURKEY Tel :+90 312 267 09 90(pbx) http://www.gonka.com.tr Fax:+90 312 267 09 93 e-mail: gonka@turk.net http://www.gonka.com.tr CUSTOMER METAG ÝNÞ. TÝC. A.Þ. e-mail: gonka@turk.net JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING CUSTOMER METAG ÝNÞ. TÝC. A.Þ. EQUIP.NAME PRECISION AIR CONDITIONER JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING MODEL GHP 160 S SERIAL NO 05/1006 EQUIP.NAME CONDENSER UNIT SUPPLY FAN FLOW RATE 9.300 m³/h MODEL GHP 160 S SERIAL NO 05/1006 SUPPLY FAN TOTAL PRESSURE 30 mmSS CAPACITY 48,5 kW MOTOR POWER 2.2 kW FAN BRAND ZIEHL-ABEGG HEATING CAPACITY 15 kW OPERATING VOLTAGE 380V/3/50 Hz COOLING CAPACITY 37.5 kW PRODUCTION DATE SEPTEMBER 2005 EXHAUST FAN FLOW RATE - QUALITY CONTROL DATE SEPTEMBER 2005 EXHAUST FAN TOTAL PRESSURE - MOTOR POWER - TSEK OPERATING VOLTAGE 380V/3/50 Hz KAZAKHSTAN PRODUCTION DATE SEPTEMBER 2005 QUALITY CONTROL DATE SEPTEMBER 2005 TSEK KAZAKHSTAN
    • Contrack Int. Inc. Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEY Tel :+90 312 267 09 90(pbx) Fax:+90 312 267 09 93 http://www.gonka.com.tr e-mail: gonka@turk.net ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA CUSTOMER CONTRACK INT. INC. JOB NAME AFGANISTAN EQUIP. NAME UNIT HEATER WITH AXIAL FAN MODEL GTA 4 SERIAL NO 08/1001 AIR FLOWRATE 650 m3/h HEATING POWER 5 kW INLET AIR TEMPERATURE 18 °C OUTLET AIR TEMPERATURE 39 °C POWER INPUT 220V/50Hz ELECTRIC MOTOR POWERR 66 W COIL TYPE STEEL TUBE STEEL FIN PRODUCTION DATE APRIL 2008 QUALITY CONTROL DATE APRIL 2008 TSEK 2008 2/3
    • 2/3 2007 -u.s. Army Corps. - Afganistan -u.s. Army Corps. - Afganistan