CONCRETE RECYCLING <br />with<br />RESONANT MACHINES<br />
Why it’s worth it?<br />Smaller Particles / Speed = Less Overall Job Costs<br />
Breaking Speed – Approx. 7,000 SY Per Shift<br /><ul><li>Example:  Maine DOT 2009
235,000 SY in 12 Days
  As Fast As You Want to Go!</li></li></ul><li>Removal of Reinforcing<br />
Removal of Rebar<br />
Potential Reusable Material<br />
Precision Breaking<br />
Airports / Building Slabs<br />
DESCRIPTION OF<br />RESONANT MACHINES<br />
Description of Rubblizing Equipment<br />Computer Controls<br />Weight<br />Motor<br />Resonant Beam<br />Flotation Tires<...
Description of Resonant Beam<br />Weight<br />Vibration Technology<br />Frequency  44 Hz <br />Amplitude 3/4”<br />
Description of Resonant Beam<br />Weight<br />Vibration Technology	<br />Frequency  44 Hz <br />Amplitude 3/4”<br />
Description of Resonant Beam<br />Weight<br />Vibration Technology	<br />Frequency  44 Hz <br />Amplitude 3/4”<br />
Operational Data of Equipment<br /><ul><li>Strikes PCC 44 Times per Second
2,000 lbs. of Pressure Per Strike
Upcoming SlideShare
Loading in...5
×

Rmi concrete recycling_presentation

455

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
455
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
26
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Rmi concrete recycling_presentation"

  1. 1. CONCRETE RECYCLING <br />with<br />RESONANT MACHINES<br />
  2. 2. Why it’s worth it?<br />Smaller Particles / Speed = Less Overall Job Costs<br />
  3. 3.
  4. 4. Breaking Speed – Approx. 7,000 SY Per Shift<br /><ul><li>Example: Maine DOT 2009
  5. 5. 235,000 SY in 12 Days
  6. 6. As Fast As You Want to Go!</li></li></ul><li>Removal of Reinforcing<br />
  7. 7. Removal of Rebar<br />
  8. 8. Potential Reusable Material<br />
  9. 9. Precision Breaking<br />
  10. 10. Airports / Building Slabs<br />
  11. 11. DESCRIPTION OF<br />RESONANT MACHINES<br />
  12. 12. Description of Rubblizing Equipment<br />Computer Controls<br />Weight<br />Motor<br />Resonant Beam<br />Flotation Tires<br />Pedestal / Shoe<br />
  13. 13. Description of Resonant Beam<br />Weight<br />Vibration Technology<br />Frequency 44 Hz <br />Amplitude 3/4”<br />
  14. 14. Description of Resonant Beam<br />Weight<br />Vibration Technology <br />Frequency 44 Hz <br />Amplitude 3/4”<br />
  15. 15. Description of Resonant Beam<br />Weight<br />Vibration Technology <br />Frequency 44 Hz <br />Amplitude 3/4”<br />
  16. 16. Operational Data of Equipment<br /><ul><li>Strikes PCC 44 Times per Second
  17. 17. 2,000 lbs. of Pressure Per Strike
  18. 18. Beam Weighs 4080 kg.
  19. 19. Raises 3/4” Per Strike
  20. 20. Machine Speed at Approx. 4-5 mph
  21. 21. Breaking Area is 10” Wide
  22. 22. Average Rubblized Per Day: 7,000 sq. yd</li></li></ul><li>BACKEND SAVINGS<br /><ul><li>30% Less Truckloads
  23. 23. Reduced Bed Damage
  24. 24. 20% Faster Loading Costs</li></li></ul><li>Crusher / Recycling Savings<br /><ul><li>Option of Single Stage Crusher
  25. 25. 6 Times Longer Impact Bar Life
  26. 26. Reinforcing Steel Removed / Recycle</li>