Allen Engineering Contractor Capabilities Presentation

  1. 1. Allen Engineering Contractor, Inc. An 8(a), HUB Zone, DBE Design Build General Contractor Roger Tate, President 909-478-5500 Allenec.Com
  2. 2. San Diego, CA Field Office (1) Field Office (2) Field Office (3) Field Office (4) Yuma, AZ Field Office El Paso, TX Field Office  San Bernardino, CA Corporate Office Barstow, CA Field Office Miramar, CA Field Office 29 Palms, CA Field Office China Lake, CA Field Office Lemoore, CA Field Office AEC Current Office Locations for Support of Work Located in the Western US Office Locations Throughout the Southwest
  3. 3. <ul><ul><li>Provide a team of highly qualified and experienced personnel with extensive backgrounds in all aspects of horizontal, vertical, waterfront, and utility construction. </li></ul></ul><ul><ul><li>Successful partnering and negotiation. </li></ul></ul><ul><ul><li>Maintain necessary resources to get the job done right. </li></ul></ul><ul><ul><li>Deliver high quality projects within budget and on schedule. </li></ul></ul><ul><ul><li>Provide rapid response solutions to emergency or mission critical situations. </li></ul></ul><ul><ul><li>Understand that our success depends on your success. </li></ul></ul>What can Allen Engineering do for you?
  4. 4. ` Bonding Capacity Allen Engineering Contractor, Inc. has 100 Million Dollars in bonding capacity. We are approved on single size projects in the low eight figure range ($15,000,000) with an aggregate backlog in the mid eight figure ($100,000,000) neighborhood .
  5. 5. NAICS Codes Current JOC, BOA, IDIQ and MATOC Contracts
  6. 6. <ul><li>Design/Build </li></ul><ul><li>Heavy Civil Construction </li></ul><ul><li>Medical Facility Renovation </li></ul><ul><li>Electrical/Mechanical </li></ul><ul><li>Concrete Structures </li></ul><ul><li>Demolition </li></ul><ul><li>Abatement </li></ul><ul><li>Waterfront Construction </li></ul><ul><li>Vertical Construction </li></ul><ul><li>Anti-Terrorism/Force Protection </li></ul><ul><li>Fire Suppression </li></ul><ul><li>Emergency Services </li></ul><ul><li>Environmental Restoration </li></ul><ul><li>Service & Maintenance </li></ul><ul><li>Pre-Engineered Buildings </li></ul><ul><li>Tenant Improvements </li></ul>Experience & Capabilities
  7. 7. Heavy Civil Construction
  8. 8. <ul><li>Design Build Security Upgrades for Main and North Gates, Marine Corps Air Station, Yuma, AZ - </li></ul><ul><ul><li>Completed on schedule, zero accidents or safety incidents </li></ul></ul><ul><ul><li>Outstanding past performance evaluation </li></ul></ul>-pop-up barrier installation -new drop arm crash gate Anti-Terrorism/Force Protection
  9. 9. <ul><li>Design Build 29 Palms Range 500 Range Target, Marine Corps Base, 29 Palms, CA </li></ul><ul><ul><li>Completed 70 days ahead of schedule , zero accidents </li></ul></ul><ul><ul><li>Outstanding past performance evaluation </li></ul></ul><ul><ul><li>Self performed 95% of work scope </li></ul></ul><ul><li>Repair Bullion Training Area Access, Marine Corps Air Ground Combat Center, 29 Palms, CA </li></ul><ul><ul><li>Completed 18 days ahead of schedule , zero accidents </li></ul></ul><ul><ul><li>Outstanding past performance evaluation </li></ul></ul><ul><ul><li>Self performed 100% of work scope </li></ul></ul>-site work in progress -site work in progress Design Build-Heavy Civil -paving complete
  10. 10. Design Build Solutions All Engineering is a leader in green building technology, with a Silver LEED Building Certification
  11. 11. Design <ul><li>Construction of Marine Corps Reserve Center, Edwards AFB, CA - </li></ul><ul><ul><li>Work performed within Flight-line, high security area </li></ul></ul><ul><ul><li>On schedule, zero accidents or safety incidents </li></ul></ul><ul><ul><li>Customer Letter of Appreciation </li></ul></ul><ul><li>Design Build Ground Mobility Support Building, Billy Machen Marine Corps T.C. </li></ul><ul><ul><li>Completed 7 days ahead of schedule </li></ul></ul><ul><ul><li>Zero accidents or safety incidents </li></ul></ul><ul><ul><li>Outstanding performance evaluation </li></ul></ul>-PEB during construction -finished PEB -Forming Foundation Design Build Vertical Construction & Pre-Engineered Buildings
  12. 12. 11 <ul><li>USACE IDIQ Removal & Disposal of Lead Based Paint, Fort Bliss, TX-$1M </li></ul><ul><li>Hazardous materials abatement </li></ul><ul><li>Zero accidents or safety incidents </li></ul><ul><li>Multiple simultaneous project locations </li></ul>-after -before Specialized Services: Abatement & Environmental <ul><li>Installation of Storm Water Runoff Treatment Technology at Navy Regional Recycling Center, San Diego, CA </li></ul><ul><li>Prototype filtration system </li></ul><ul><li>Zero accidents or safety incidents </li></ul><ul><li>Customer commendation </li></ul>-completed system
  13. 13. Work with the top 8(a) Hub Zone, DBE company on the West Coast Allen Engineering Contractor, Inc. a proven leader
  14. 14. ` Thank You www.allenec.com Contact: Fernando Martinez @ 909-478-5500

×