Rwh Goal Maidan by G.S.Golani

  • 300 views
Uploaded on

A project completed at Ulhasnagar by G.S.Golani on behalf of UMC to make the park self sufficient in water for its non potable needs through rain water harvesting

A project completed at Ulhasnagar by G.S.Golani on behalf of UMC to make the park self sufficient in water for its non potable needs through rain water harvesting

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
300
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. SUCCESSFUL PROJECT OF
    ULHASNAGAR MUNCIPAL CORPORATION
    RAIN WATER HARVESTING AT GOAL MAIDAN MAKING WATER EVERYBODY’S BUSINESS
  • 2. Requirement at Goal Maidan
    Approx 60000 lit per day for Gardening and other activities.
    Decline in bore well yields and fall in ground water table levels.
    Reduced open soil surface area due to concrete coverage of surface.
  • 3. Objectives
    To reduce run-off.,Stop street flooding.
    To Reduce strain on Municipal water supply
    To make water Availability round the clock at goal maidan for various needs.
  • 4. Previous Water Sources
    Municipal water connections.
    Low yield five bore wells.
    Tanker water supply
  • 5. Rainwater Harvesting Project
    Carried out hydro-geological survey.
    Scheme consist of :
    Dug Well at peace park.
    Pumping machinery.
    Pipe line and storage tanks in different zones.
    Sedimentation chambers & Filters for well and existing bore wells.
  • 6. Where there is well, there is way
    Well is located at peace park at lowest ground level of Garden.
    All the water used in Gardening comes to well through natural filter
    Strom water connected through filters to well.
  • 7. Other Works
    Recharging of existing bore wells through RWH
    Scheme of piped water Pumping machinery, Pipe line, Storage tanks.
    Recharging Pits.
  • 8. Complete System
    The runoff collected from the ground at goal maidan is recharged using a filter pits of size 1.5m x 1.5m x 1.5m which after filtration of storm water recharges existing bore wells and new dug well.
    The water thus collected in dug well at lowest portion is pumped through submersible pump and through pipeline supplied to storage tanks in zones for use of non potable purposes.
  • 9. Distribution System
    Out of 14 parts of Garden 7 parts are supplied water directly from dug well for Gardening through submersible pump.
    Rest of 7 parts getting water through storage tanks provided near by garden.
  • 10. Water Scarcity to 24 hrs Water availability at Bhagwanti Nawani Stage Terrace.
  • 11. Self Sufficient Water for Gardening