IGARSS-PPT-XiangDING.ppt

496
-1

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
496
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Paper 2966: THE DEVELOPMENT OF CATASTROPHE EARTHQUAKE RISK ESTIMATION SYSTEM BASED ON GIS Session: FR3.T09.5 - GIS Techniques IV Presentation Type: Oral Session Location: Ballroom C Session Time: Friday, July 29, 13:20 - 15:00 Paper Presentation Time: Friday, July 29, 14:40 - 15:00 Session Chairs: Anita Simic, asimic.canada@gmail.com and Meixia Deng, mdeng@gmu.edu
  • IGARSS-PPT-XiangDING.ppt

    1. 1. Xiang DING Presented by Aixia DOU Institute of Earthquake Science China Earthquake Administration Friday, July 29,2011 IGARSS 2011, July 25-29, Vancouver, Canada
    2. 2. <ul><li>Introduction </li></ul><ul><li>The Design Object of the System </li></ul><ul><li>The Basic Model for Earthquake Risk Assessment </li></ul><ul><li>Earthquake Risk Assessment </li></ul><ul><li>The Main Functions of CERES </li></ul><ul><li>Conclusion and Acknowledgement </li></ul><ul><li></li></ul>
    3. 3. <ul><li>The Catastrophe Earthquake Risk Estimation System ( CERES for Windows) is a professional software system developed specifically for the risk assessment of catastrophe earthquakes in the next ten years in Asia. </li></ul><ul><li></li></ul>
    4. 4. <ul><li>Earthquake risk assessment </li></ul><ul><li>Information service </li></ul><ul><li>Earthquake risk mapping of Asia </li></ul><ul><li></li></ul>
    5. 5. <ul><ul><li>Development Tools </li></ul></ul><ul><ul><ul><li>ArcEngine 9.2 </li></ul></ul></ul><ul><ul><ul><li>Visual Studio VB.NET 2005 </li></ul></ul></ul><ul><ul><li>DataBase </li></ul></ul><ul><ul><ul><li>Micros oft Access </li></ul></ul></ul><ul><ul><ul><li>Oracle </li></ul></ul></ul><ul><ul><li>Runing Environment </li></ul></ul><ul><ul><ul><li>MS Windows XP or upper version </li></ul></ul></ul><ul><li></li></ul>
    6. 6. <ul><li>Conventional models of ER (Wang et al, 2007) </li></ul><ul><li>or </li></ul><ul><li>R - the estimated seismic risk value </li></ul><ul><li>L - the life or economic losses </li></ul><ul><li>P ( Y ) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) </li></ul><ul><li>V ( Y ) - the vulnerability of social wealth (life, building or economic index such as GDP) in Y </li></ul><ul><li>W - Social wealth </li></ul><ul><li></li></ul>
    7. 7. <ul><li>A new ER model developed by Wang et al (2009) </li></ul><ul><li>OR </li></ul><ul><li>R - the estimated seismic risk value </li></ul><ul><li>L - the life or economic losses </li></ul><ul><li>P ( Y ) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) </li></ul><ul><li>A - the ability of disaster reduction </li></ul><ul><li>V ( Y | A ) - the vulnerability under the condition of A </li></ul><ul><li>W - Social wealth </li></ul><ul><li></li></ul>
    8. 8. <ul><li>The basic process of risk assessment for catastrophe earthquake </li></ul><ul><li></li></ul>
    9. 9. <ul><li>The system function frame chart </li></ul><ul><li></li></ul>
    10. 10. <ul><li>System </li></ul><ul><li>Menus </li></ul><ul><li>of </li></ul><ul><li>CERES </li></ul><ul><li></li></ul>
    11. 11. <ul><li></li></ul>
    12. 12. <ul><li></li></ul>
    13. 13. <ul><li></li></ul>The Input of Earthquake Parameters <ul><li>Database maintain </li></ul><ul><ul><li>Add/Batch Add </li></ul></ul><ul><ul><li>Delete/Batch Delete </li></ul></ul><ul><ul><li>Update </li></ul></ul><ul><ul><li>Cancel </li></ul></ul><ul><ul><li>Find </li></ul></ul><ul><ul><li>Auxiliary input list </li></ul></ul>
    14. 14. <ul><li></li></ul>
    15. 15. <ul><li></li></ul>
    16. 16. <ul><li></li></ul>
    17. 17. <ul><li></li></ul>
    18. 18. <ul><li></li></ul>
    19. 19. <ul><li></li></ul>
    20. 20. <ul><li></li></ul>Interface of Control Params for Risk Assessment
    21. 21. <ul><li></li></ul>Example of Risk Assessment Interface of Control Params for Risk Assessment
    22. 22. <ul><li></li></ul><ul><li>Death toll of Ms7.1Yushu earthquake </li></ul><ul><ul><li>Actual: 2698 </li></ul></ul><ul><ul><li>Miss: 270 </li></ul></ul><ul><ul><li>Fast Estimated : 1423 </li></ul></ul>Estimated Seismic Intensity Distribution of 2010 Ms7.0 Yushu Earthquake, Qinghai Province, China Interface of Control Params for Fast Loss Assessment
    23. 23. <ul><li>The Catastrophe Earthquake Risk Estimation System (CERES) has been showing the potential ability in practical research of risk assessment in Asia while the results have not been presented here for a limited extent of paper. </li></ul><ul><li>The research was supported by Ministry of Science & Technology of China (NO. 2008BAC44B02). </li></ul><ul><li></li></ul>
    24. 24. Thank you! Ding xiang [email_address] +86-10-88015736

    ×