Your SlideShare is downloading. ×
0
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
IGARSS-PPT-XiangDING.ppt
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

IGARSS-PPT-XiangDING.ppt

437

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
437
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Paper 2966: THE DEVELOPMENT OF CATASTROPHE EARTHQUAKE RISK ESTIMATION SYSTEM BASED ON GIS Session: FR3.T09.5 - GIS Techniques IV Presentation Type: Oral Session Location: Ballroom C Session Time: Friday, July 29, 13:20 - 15:00 Paper Presentation Time: Friday, July 29, 14:40 - 15:00 Session Chairs: Anita Simic, asimic.canada@gmail.com and Meixia Deng, mdeng@gmu.edu
  • Transcript

    1. Xiang DING Presented by Aixia DOU Institute of Earthquake Science China Earthquake Administration Friday, July 29,2011 IGARSS 2011, July 25-29, Vancouver, Canada
    2. <ul><li>Introduction </li></ul><ul><li>The Design Object of the System </li></ul><ul><li>The Basic Model for Earthquake Risk Assessment </li></ul><ul><li>Earthquake Risk Assessment </li></ul><ul><li>The Main Functions of CERES </li></ul><ul><li>Conclusion and Acknowledgement </li></ul><ul><li></li></ul>
    3. <ul><li>The Catastrophe Earthquake Risk Estimation System ( CERES for Windows) is a professional software system developed specifically for the risk assessment of catastrophe earthquakes in the next ten years in Asia. </li></ul><ul><li></li></ul>
    4. <ul><li>Earthquake risk assessment </li></ul><ul><li>Information service </li></ul><ul><li>Earthquake risk mapping of Asia </li></ul><ul><li></li></ul>
    5. <ul><ul><li>Development Tools </li></ul></ul><ul><ul><ul><li>ArcEngine 9.2 </li></ul></ul></ul><ul><ul><ul><li>Visual Studio VB.NET 2005 </li></ul></ul></ul><ul><ul><li>DataBase </li></ul></ul><ul><ul><ul><li>Micros oft Access </li></ul></ul></ul><ul><ul><ul><li>Oracle </li></ul></ul></ul><ul><ul><li>Runing Environment </li></ul></ul><ul><ul><ul><li>MS Windows XP or upper version </li></ul></ul></ul><ul><li></li></ul>
    6. <ul><li>Conventional models of ER (Wang et al, 2007) </li></ul><ul><li>or </li></ul><ul><li>R - the estimated seismic risk value </li></ul><ul><li>L - the life or economic losses </li></ul><ul><li>P ( Y ) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) </li></ul><ul><li>V ( Y ) - the vulnerability of social wealth (life, building or economic index such as GDP) in Y </li></ul><ul><li>W - Social wealth </li></ul><ul><li></li></ul>
    7. <ul><li>A new ER model developed by Wang et al (2009) </li></ul><ul><li>OR </li></ul><ul><li>R - the estimated seismic risk value </li></ul><ul><li>L - the life or economic losses </li></ul><ul><li>P ( Y ) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) </li></ul><ul><li>A - the ability of disaster reduction </li></ul><ul><li>V ( Y | A ) - the vulnerability under the condition of A </li></ul><ul><li>W - Social wealth </li></ul><ul><li></li></ul>
    8. <ul><li>The basic process of risk assessment for catastrophe earthquake </li></ul><ul><li></li></ul>
    9. <ul><li>The system function frame chart </li></ul><ul><li></li></ul>
    10. <ul><li>System </li></ul><ul><li>Menus </li></ul><ul><li>of </li></ul><ul><li>CERES </li></ul><ul><li></li></ul>
    11. <ul><li></li></ul>
    12. <ul><li></li></ul>
    13. <ul><li></li></ul>The Input of Earthquake Parameters <ul><li>Database maintain </li></ul><ul><ul><li>Add/Batch Add </li></ul></ul><ul><ul><li>Delete/Batch Delete </li></ul></ul><ul><ul><li>Update </li></ul></ul><ul><ul><li>Cancel </li></ul></ul><ul><ul><li>Find </li></ul></ul><ul><ul><li>Auxiliary input list </li></ul></ul>
    14. <ul><li></li></ul>
    15. <ul><li></li></ul>
    16. <ul><li></li></ul>
    17. <ul><li></li></ul>
    18. <ul><li></li></ul>
    19. <ul><li></li></ul>
    20. <ul><li></li></ul>Interface of Control Params for Risk Assessment
    21. <ul><li></li></ul>Example of Risk Assessment Interface of Control Params for Risk Assessment
    22. <ul><li></li></ul><ul><li>Death toll of Ms7.1Yushu earthquake </li></ul><ul><ul><li>Actual: 2698 </li></ul></ul><ul><ul><li>Miss: 270 </li></ul></ul><ul><ul><li>Fast Estimated : 1423 </li></ul></ul>Estimated Seismic Intensity Distribution of 2010 Ms7.0 Yushu Earthquake, Qinghai Province, China Interface of Control Params for Fast Loss Assessment
    23. <ul><li>The Catastrophe Earthquake Risk Estimation System (CERES) has been showing the potential ability in practical research of risk assessment in Asia while the results have not been presented here for a limited extent of paper. </li></ul><ul><li>The research was supported by Ministry of Science & Technology of China (NO. 2008BAC44B02). </li></ul><ul><li></li></ul>
    24. Thank you! Ding xiang [email_address] +86-10-88015736

    ×