Green building presentation eng.ayman

465 views
414 views

Published on

Published in: Business, Design
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
465
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
31
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • Y LEED or QSAS?This is RFP truck parking lots
  • This is TOR for ministry of information (new headquarter)
  • Concentrate on energy aspects ( solar panels)و عالية الصايغ راح تتكلم بالتفصيل عن تطبيقات QSAS
  • High advance smart buildingLighting control is achieved throughout the building through motion sensors and dimming system.
  • We need 900KhW for building usage, and fence lighting with security
  • 4 power socket : Keeping the environment clean by turning off the desiel engine also save the energy
  • Drop off curb departure
  • Chick in hall
  • Departure additional view
  • immigration
  • Premium Check-in Hall – additional departure view
  • Central space
  • Central space
  • Roof Canopy protecting Facades & Boarding Bridges- External view towards the Fixed Bridges-
  • Arrival and baggage reclaim hall
  • Arrivals Concourse
  • TOR
  • Different type of vegetation- leed required protect native vegitation or restore to min. 50%
  • Car, bus, train
  • LEED required at least 50% of car parking should be covered
  • Departure concurse
  • Reduce potable water consumption الماي العادي وليس الصليبية أو الحلو and use it for irregation by 50% from calculated (this LEED requirment)… we are using the whole consmption water then treated then we r using it a gain for irregation
  • LEED required to use on site renewable energy system to offset 11% of the building annual energy cost
  • Green building presentation eng.ayman

    1. 1. Ministry of Public WorksConstruction Project Sector
    2. 2. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 2012MPW has been part of adopting andapplying Green Building Concepts in itsconstruction projects. The application of green and sustainable design has been initiated on a group of selected projects as a required objective. MPW has emphasized in the contractual documents –TOR and RFP- the importance of implementing green and sustainable criteria (i.e. LEED and QSAS).
    3. 3. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 2012MPW has been part of adopting andapplying Green Building Concepts in itsconstruction projects. The application of green and sustainable design has been initiated on a group of selected projects as a required objective. MPW has emphasized in the contractual documents –TOR and RFP- the importance of implementing green and sustainable criteria (i.e. LEED and QSAS).
    4. 4. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 MPW will present three ongoing case studies, detailing information related to green aspects from each case study, and explaining how green design and technology were applied.
    5. 5. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) 2 Trucks Parking Lots in Al-Jahraa Governorate 3 Terminal Two Kuwait International Airport
    6. 6. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)
    7. 7. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) Jaber Al-Sabah Hospital AL-Shuhada AL-Zahra Ministries Zone Six Ring Road Sahara Golf & Country Club
    8. 8. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) Site Area 4,760 m2 The Public Services Public Authority for Built-up Area 33,000 housing Welfare m2 company AL-Zahra Zakat House AL-Shuhada The Public Authority for Civil info. Ministry of Ministry of Electricity & Water Public Works
    9. 9. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) Site Area 4,760 m2 The Public Services Public Authority for Built-up Area 33,000 housing Welfare m2 company Consultant: Alia Al-Sayegh Cons. Stage: Design Phase. AL-Zahra Construction Date: Aug. 2013 Zakat House AL-Shuhada The Public Authority for Civil info. Ministry of Ministry of Electricity & Water Public Works
    10. 10. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) Exportation for Public Welfare Dept. BOT Department: - Administration offices Supporting facilities for the 2 Dept. “3 Basements+ Ground+ 9 Floors”
    11. 11. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)
    12. 12. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) Terms Of Reference Addendum
    13. 13. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) 1 URBAN Connectivity “14%” 2 Site “9%” 3 Energy “18” 4 Water “16%” 5 Material“8%” 6 Indoor Environment “14%” 7 Cultural and Economic Value “13%” 8 Management and Operations “8%” QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
    14. 14. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) 1 URBAN Connectivity “14%” 2 Site “9%” 3 Energy “18” 4 Water “16%” 5 Material“8%” 6 Indoor Environment “14%” 7 Cultural and Economic Value “13%” 8 Management and Operations “8%” QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
    15. 15. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System 1 Using Solar Panels for : External Lighting “Stand-Alone”
    16. 16. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System 1 Using Solar Panels for : External Lighting “Stand-Alone” Supply Electricity “Saving 9%”
    17. 17. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System
    18. 18. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System
    19. 19. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System
    20. 20. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System 1 Using Solar Panels for : External Lighting “Stand-Alone” Supply Electricity “Saving 9%” 2 LED is used for complete lighting fixtures of the building
    21. 21. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT)3Energy “18%”Energy Demand Performance Electrical System 1 Using Solar Panels for : External Lighting “Stand-Alone” Supply Electricity “Saving 9%” 2 LED is used for complete lighting fixtures of the building 3 A full Building Management System (BMS) is applied.
    22. 22. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) 2 Trucks Parking Lots in Al-Jahraa Governorate 3 Terminal Two Kuwait International Airport
    23. 23. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate Site Area 500,000 m2 “Each” Abdally Road West Abdally Road Location East Abdally Road Location Al-Salmy Road Al-Salmy Road Location
    24. 24. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate West Abdally R E Road Location enewable nergy East Abdally Road Location Trucks parking (2000 parking spaces min.) Service center (3000 m2) : - R P Administration offices equest for roposal Al-Salmy Road Location Mechanical and Electrical workshop Trucks Weight station Truck-Wash facilities Supportive facilities Stage: Construction Phase Type: Design / Build. Construction Finish Date: March 2014
    25. 25. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading
    26. 26. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading
    27. 27. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading 1.2 Wind Turbines “backup electrical power”
    28. 28. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading 1.2 Wind Turbines “backup electrical power” 1.3 LED Fixture
    29. 29. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading 1.2 Wind Turbines “backup electrical power” 1.3 LED Fixture 1.4 Stand-Alone Street Light
    30. 30. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading 1.2 Wind Turbines “backup electrical power” 1.3 LED Fixture 1.4 Stand-Alone Street Light 2 Energy Conservation 2.1 Power Sockets (15%) “Trailer Refrigeration Unit”
    31. 31. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 2 Trucks Parking Lots in Al-Jahraa Governorate 1 Clean Green Energy System 1.1 Solar Panels and Shading 1.2 Wind Turbines “backup electrical power” 1.3 LED Fixture 1.4 Stand-Alone Street Light 2 Energy Conservation 2.1 Power Sockets (15%) “Trailer Refrigeration Unit” 3 Treated Water for Irrigation “Storm Water Tank”
    32. 32. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 Exportation for Public Welfare (EPWD) and 1 Build Operate and Transfer Agency (BOT) 2 Trucks Parking Lots in Al-Jahraa Governorate 3 Terminal Two Kuwait International Airport
    33. 33. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport Capital City Hwally Government Fourth Ring Road Fifth Ring Road AL-Farwaniyah South Surrah Government Six Ring Road Abdullah AL-Mubarak Sabhan Mubarak Industrial Area AL-Kabeer New Terminal Government
    34. 34. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport Site Area 6.8 km2 Capital City Built up Area 670,000 m2 Hwally Government Fourth Ring Road Fifth Ring Road AL-Farwaniyah South Surrah Government Six Ring Road Abdullah AL-Mubarak Sabhan Mubarak Industrial Area AL-Kabeer New Terminal Government
    35. 35. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    36. 36. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport Consultant: Foster + Partners in Association with Gulf Cons. Stage: Design Phase. Construction Date: Sept. 2013
    37. 37. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport The New Terminal will initially accommodate 13 MAP with the opportunity to increase it to 25 MAP. The layout of the airport is generated to accommodate 35 flexible contact stands. - 4,500 min. car parking for arrivals and departure .
    38. 38. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    39. 39. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    40. 40. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    41. 41. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    42. 42. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    43. 43. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    44. 44. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    45. 45. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    46. 46. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    47. 47. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    48. 48. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    49. 49. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    50. 50. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport 1 Sustainable Site 2 Water Efficiency 3 Energy and Atmosphere 4 Indoor Environment 5 Material and Resource 6 * Renovation Design and Regional Priority
    51. 51. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport 1 Sustainable Site 2 Water Efficiency 3 Energy and Atmosphere 4 Indoor Environment 5 Material and Resource 6 * Renovation Design and Regional Priority
    52. 52. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International AirportSite Development 1 1 Sustainable Site
    53. 53. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20121 3 Terminal Two Kuwait International AirportSustainable Site Bridge Gardens Site Development 1 Terraced gardens and water features Oasis 100% coverage Native Planting Zone 80% coverage 60% coverage 40% coverage 20% coverage Native Planting Zone Oasis Bridge Gardens
    54. 54. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20121 3 Terminal Two Kuwait International AirportSustainable Site Alternative Transportation 2 Buses Car Park Pedestrian Link Metro Buses
    55. 55. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20121 3 Terminal Two Kuwait International AirportSustainable Site Heat Island Effect “Non-Roof” 3 100% Parking Covered “Green Roof”
    56. 56. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport
    57. 57. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport 1 Sustainable Site 2 Water Efficiency 3 Energy and Atmosphere 4 Indoor Environment 5 Material and Resource 6 * Renovation Design and Regional Priority
    58. 58. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20122 3 Terminal Two Kuwait International AirportWater Efficiency Water Efficient Landscaping 1 3 18 Treatment plant Distributed Reused Processed Water Used Processed Water
    59. 59. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 3 Terminal Two Kuwait International Airport 1 Sustainable Site 2 Water Efficiency 3 Energy and Atmosphere 4 Indoor Environment 5 Material and Resource 6 * Renovation Design and Regional Priority
    60. 60. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Optimize Energy Performance 1 1 Day Light 2 Photovoltaic System 3 Indoor Lighting
    61. 61. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 1 Day Light
    62. 62. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 1 Day LightIncrease glazing toequivalent of LEEDrequirements withcoordinate ofcooling system
    63. 63. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 1 Day Light
    64. 64. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 1 Day Light
    65. 65. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 2 Photovoltaic System 11% renewable energy from solar thermal and Photovoltaic Panels. Approx. 25.3GWh per annum generated from PV panels. Substantial use of photo voltaic arrays (PV) to generate electricity, thus reduce the demand for Grid power.
    66. 66. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 2 Photovoltaic System Total PV Area 200,000 sqm
    67. 67. Ministry of Public Works Construction Project Sector “Green Building in Government Projects” May 20123 3 Terminal Two Kuwait International AirportEnergy and Atmosphere Energy Performance 1 Lighting Solution Reduce building energy consumption by at least 16% of energy needed for the light use Baggage hall lighting mix of fluorescent and LED high bay luminaires.
    68. 68. Ministry of Public WorksConstruction Project Sector “Green Building in Government Projects” May 2012 From three presented case studies, State of Kuwait government represented by MPW had the decision of implementing sustainable and green energy criteria into governmental projects by using any approved measuring system such as LEED or QSAS.
    69. 69. Ministry of Public WorksConstruction Project Sector

    ×