• Save
Group 08 Development Presentation
Upcoming SlideShare
Loading in...5
×
 

Group 08 Development Presentation

on

  • 912 views

 

Statistics

Views

Total Views
912
Views on SlideShare
543
Embed Views
369

Actions

Likes
0
Downloads
0
Comments
0

2 Embeds 369

http://mj89sp3sau2k7lj1eg3k40hkeppguj6j-a-sites-opensocial.googleusercontent.com 368
https://twitter.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • LagoIlopango from volcanboqueronLandslide at Santa Tecla (2001)Liquefaction from Niigata, Japan (1964)
  • Questions: What are the river characteristics – size, discharge, strength, pollution levels? Do the locals use any particular methods to treat the surface runoff currently?
  • Questions: Does water provision imply direct connection to peoples houses? Any other water sources located near to village, good site for groundwater wells?

Group 08 Development Presentation Group 08 Development Presentation Presentation Transcript

  • Brief • Transport access • Electricity, sanitation and water • New and repaired housing • Primary school • Slope stabilitySource: Google Image
  • Community Location Lago Ilopango San Jose de Costa Rica Rio DesagueSource: Google Maps
  • Project aims0 Self reliant and self sustaining0 Resistant to natural hazards0 Improve local industry0 Encourage sense of ownership Source: Google images
  • Project Plan
  • Providing transport access to the communityLago Ilopango Main road San Jose de Costa Rica Alternative route Source: Google maps
  • Road Design Concrete main road Unpaved smaller roadshttp://www.holcim.com/en/press-and-media/stories/paving-new-roads-in-el-salvador.html
  • HazardsLandslides Hurricanes VolcanoesFloods Source: Google images Liquefaction
  • Slope Stability
  • Retaining Walls
  • Water Supply ProblemsSource: WHO, 2012 Total Water Consumption = 30 l/c/d Source: Google images
  • New Supply SolutionsWater Kiosks Wells and StorageFog/Rain Collection Connection to Water Mains Source: Google images
  • Available Sanitation SystemsPit and VIP Latrine Composting Latrine Source: WHO, 2012 Sceptic Tank Sewer System Source: 521 FLOW Source: Berry, 2004
  • Composting Latrines Source: A life out there, 2010 Source: Fitch, 2010 Source: Fitch, 2010 Source: Fitch, 2010Source: Ecodana, 2012
  • ElectricityBig Ideas• Mains• Geothermal• Biomass Source: Google maps Smaller Reality http://www.e.quinox.org/
  • Materials • Concrete • Adobe • Corrugated Metal • Breezeblocks • Masonry • Timberhttp://communityrebuilds.wordpress.com/2011/08/17/adobe/ • Bamboo http://www.flickriver.com/groups/structures/pool/random/ • Availability • Cost • Seismic Behaviour • Construction • Durabilityhttp://www.humberside-blocks.com/products/215hcfr.htm • Sustainability http://www.eden-project.co.uk/latest_happenings13.htm
  • Repair & RetrofittingSource: Google images
  • Traditional Low Cost Housing in El SalvadorBahareque AdobeSource: Langenbach, 1989 Source: Google images Confined Masonry Source,: World Housing Encyclopedia
  • Critical initial designs:Dhajji Design Frame Design Superadobe Design Source: Google images
  • Proposed ideas: Square Plan View Sketches of proposed walls 7.6m Roof DesignSource: Google images
  • SchoolSource: Gifford Ugandan School 2011 Source: Google images