III B.TECH. II SEM R09 PENDING RESULT
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

III B.TECH. II SEM R09 PENDING RESULT

  • 4,807 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
4,807
On Slideshare
542
From Embeds
4,265
Number of Embeds
10

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 4,265

http://sietkexamcell.blogspot.in 3,753
http://www.sietkexamcell.blogspot.in 303
http://sietkexamcell.blogspot.com 169
http://sietkexamcell.blogspot.de 13
http://sietkexamcell.blogspot.com.es 9
http://sietkexamcell.blogspot.co.uk 7
http://feeds.feedburner.com 5
http://www.sietkexamcell.blogspot.com 3
http://sietkexamcell.blogspot.ae 2
http://webcache.googleusercontent.com 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR ANANTAPUR - 515002 (A.P.) INDIA EXAMINATION BRANCH B Tech III Year II Semester (R09) Regular/Supplementary Examinations - April/May 2013 Results Discrepancy Results SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS N BHAKTHA PRAHALADA REDDY093N1A0247 9A10504 LINEAR & DIGITAL IC APPLICATIONS 29 31 60 P 4 VINODH KUMAR REDDY N10F61A04B2 9A04601 DIGITAL COMMUNICATIONS 26 25 51 P 4 9A04602 MICROPROCESSORS & MICROCONTROLLERS 24 25 49 P 4 9A04603 DIGITAL SIGNAL PROCESSING 26 32 58 P 4 9A04604 ELECTRONIC MEASUREMENTS AND INSTRUMENTATION 26 28 54 P 4 9A04605 VLSI DESIGN 30 49 79 P 4 9A04606 MICROWAVE ENGINEERING 26 31 57 P 4 9A04607 ANALOG & DIGITAL COMMUNICATIONS LAB 23 46 69 P 2 9AHS601 ADVANCED ENGLISH LANGUAGE COMMUNICATION SKILLS L 25 42 67 P 2 Page 1 of 1 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Tuesday, August 27, 2013