TSX-V: OCO
Frankfurt: OR6
www.orocoresourcecorp.com
DISCLAIMER

Some of the statements contained herein may be forward-
looking statements which involve known and unknown ris...
PROJECT LOCATIONS
HIGHLIGHTS

Gold resource: 300,000 ounce indicated oxide gold resource with 85% extraction in
preliminary leach tests.

Zi...
•7,000 Ha Land Position
Containing 17.5 km Strike
Length

•Cerro Prieto $2.5 Million
Purchase Price Fully Paid

•4,200 Ha ...
CERRO PRIETO PROJECT SURFACE PLAN

 2008, Phase 1 Exploration
 Program Managed by Ing.
 Antonio Montante

• 6,000 meters (...
NI 43-101 COMPLIANT 7.5 MILLION TONNE INDICATED GOLD
           RESOURCE USING 0.5 G/T Au CUT OFF
 CATEGORY CUT-OFF TONNES...
NI 43-101 COMPLIANT 20.4 MILLION TONNE INDICATED
         RESOURCE USING 0.5 % ZINC CUT-OFF
   CATEGORY CUT OFF TONNES    ...
CERRO PRIETO PROJECT MINERALIZATION


• Subvertical
  orientation

• Up to 65 meters true
  thickness

• Oxide to 350 mete...
CERRO PRIETO PROJECT LONGITUDINAL SECTION
                 METAL DISTRIBUTION




Gold distribution




Zinc distribution
CERRO PRIETO PROJECT: LOCATION AND INFRASTRUCTURE




     CERRO PRIETO MINE LOOKING NORTH
CERRO PRIETO 3D UNDERGROUND
ANIMATION
OROCO LONGITUDINAL SECTION



                                                             2008 OROCO DRILL HOLES


      ...
OROCO RESOURCE CORP.
       PROGRAM AND BUDGET TO PREFEASIBILITY MAY 2009


DIAMOND DRILLING: Cerro Prieto Claims – 7400 m...
DRILL, DEFINE, MINE: CRITICAL PATH TO MINING


Jan 2009   Complete resource estimate, begin metallurgical   studies
      ...
HIGHLIGHTS

Gold resource: 300,000 ounce indicated oxide gold resource with 85%
extraction in preliminary leach tests.

Zi...
CAPITAL STRUCTURE


 Shares Issued and Outstanding*     27,593,521

 Stock Options and Warrants          7,551,760


 Shar...
DIRECTORS
Stephen M. Leahy, Executive Chairman, Director
• Founder of North American Tungsten
• Over 26 years of experienc...
TSX-V: OCO
Frankfurt: OR6
www.orocoresourcecorp.com
Oroco Resource Corp Oco May 2009 Update
Upcoming SlideShare
Loading in...5
×

Oroco Resource Corp Oco May 2009 Update

410

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
410
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Oroco Resource Corp Oco May 2009 Update

  1. 1. TSX-V: OCO Frankfurt: OR6 www.orocoresourcecorp.com
  2. 2. DISCLAIMER Some of the statements contained herein may be forward- looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward looking statements that involve various degrees of risk. The following are important factors that could cause the Company’s actual results to differ materially from those expressed or implied by such forward looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital.
  3. 3. PROJECT LOCATIONS
  4. 4. HIGHLIGHTS Gold resource: 300,000 ounce indicated oxide gold resource with 85% extraction in preliminary leach tests. Zinc resource : +500,000,000 pound zinc resource with 85.3% extraction in preliminary leach tests. Oxide gold and zinc resources open along strike in both directions. Recent expansion of landholdings with Yamana property option Agreement, 7,000 ha concession total containing 17.5 km of strike length Sulphide resource open to depth and north and south on strike. Drill Hole CP011 intersected 10% combined lead and zinc, 0.78% copper and good silver and gold credits over significant width. Thickness of zone, topography and grade indicate potential for very low cost initial open pit operation focused on mining the oxide gold resource. Premier logistics include water source, paved highway and national power grid within 10 kilometers and good mining work force within one hour of project. Mining friendly Mexico gives the opportunity to put project into production within a short time frame.
  5. 5. •7,000 Ha Land Position Containing 17.5 km Strike Length •Cerro Prieto $2.5 Million Purchase Price Fully Paid •4,200 Ha Property Option With Yamana Gold
  6. 6. CERRO PRIETO PROJECT SURFACE PLAN 2008, Phase 1 Exploration Program Managed by Ing. Antonio Montante • 6,000 meters (22 holes) diamond drilling over 600 meter strike length • Trenching successful along 1,250 meter strike length • $1,000,000 program completed on time and on budget • Mineralization remains open on strike north and south and to depth • Mineralized structure continues on Yamana Option Concession and Cerro Prieto North concession
  7. 7. NI 43-101 COMPLIANT 7.5 MILLION TONNE INDICATED GOLD RESOURCE USING 0.5 G/T Au CUT OFF CATEGORY CUT-OFF TONNES Au Ag Pb Zn (g/t Au) (g/t) (g/t) (%) (%) INDICATED 0.5 7,450,000 1.24 12.8 0.41 1.04 INFERRED 0.5 140,000 0.99 11.2 0.73 1.98 CONTAINED METAL IN 0.5G/T GOLD CUTOFF RESOURCE CATEGORY TONNES GOLD (OUNCES) SILVER (OUNCES) LEAD (POUNDS) ZINC (POUNDS) INDICATED 7,480,000 297,000 3,066,000 67,321,200 170,766,000 INFERRED 140,000 4,500 50,400 2,252,500 6,109,500
  8. 8. NI 43-101 COMPLIANT 20.4 MILLION TONNE INDICATED RESOURCE USING 0.5 % ZINC CUT-OFF CATEGORY CUT OFF TONNES Au Ag Pb Zn (% Zn) (g/t) (g/t) (%) (%) INDICATED 0.5 20,440,000 0.43 8.7 0.38 1.2 INFERRED 0.5 6,290,000 0.13 14.5 0.3 1.04 CONTAINED METAL IN 0.5% ZINC CUT-OFF RESOURCE CATEGORY GOLD (OUNCES) SILVER (OUNCES) LEAD (POUNDS) ZINC (POUNDS) INDICATED 282,600 5,717,400 171,189,100 540,597,100 INFERRED 26,300 2,932,400 41,589,500 144,176,900
  9. 9. CERRO PRIETO PROJECT MINERALIZATION • Subvertical orientation • Up to 65 meters true thickness • Oxide to 350 meters from surface • Topographically amenable to open pit mining
  10. 10. CERRO PRIETO PROJECT LONGITUDINAL SECTION METAL DISTRIBUTION Gold distribution Zinc distribution
  11. 11. CERRO PRIETO PROJECT: LOCATION AND INFRASTRUCTURE CERRO PRIETO MINE LOOKING NORTH
  12. 12. CERRO PRIETO 3D UNDERGROUND ANIMATION
  13. 13. OROCO LONGITUDINAL SECTION 2008 OROCO DRILL HOLES PROPOSED 2009 DRILL HOLES – OROCO CLAIM PROPOSED 2009 DRILL HOLES – YAMANA CLAIM 500 Meters 1000 Meters 500 Meters OXIDE GOLD Ç Ç 1,250m RESOURCE Historical Workings CP023 8 Level Shaft 9 Level 1,000m 10 Level Water Table OXIDE 750m SULPHIDE OROCO CLAIM BOUNDARY 500m
  14. 14. OROCO RESOURCE CORP. PROGRAM AND BUDGET TO PREFEASIBILITY MAY 2009 DIAMOND DRILLING: Cerro Prieto Claims – 7400 m 800,000 Yamana Option – 8000 m 885,000 METALLURGY, ENGINEERING, ENVIRONMENT 1,000,000 SUPERVISION AND OVERHEAD 840,000 Sub Total 3,525,000 OTHER EXPLORATION: Cerro Prieto North 625,000 Yamana Option (non oxide) 850,000 Sub Total 1,475,000 GRAND TOTAL 5,000,000
  15. 15. DRILL, DEFINE, MINE: CRITICAL PATH TO MINING Jan 2009 Complete resource estimate, begin metallurgical studies and preliminary mine plan May 2009 Commence infill and extension drilling Nov 2009 Complete drilling Complete environmental studies Jan 2010 Complete updated resource calculation Commence prefeasibility Jul 2010 Complete prefeasibility study Oct 2010 Begin construction Apr 2011 Complete construction
  16. 16. HIGHLIGHTS Gold resource: 300,000 ounce indicated oxide gold resource with 85% extraction in preliminary leach tests. Zinc resource : +500,000,000 pound zinc resource with 85.3% extraction in preliminary leach tests. Oxide gold and zinc resources open along strike in both directions. Sulphide resource open to depth. CP011 intersected 10% combined lead and zinc, 0.78% copper and good silver and gold credits over significant width. Thickness of zone, topography and grade indicate potential for very low cost initial open pit operation focused on mining the oxide gold resource. Premier logistics include water source, paved highway and national power grid within 10 kilometers and good mining work force within one hour of project. Mining friendly Mexico gives the opportunity to put project into production within a short time frame.
  17. 17. CAPITAL STRUCTURE Shares Issued and Outstanding* 27,593,521 Stock Options and Warrants 7,551,760 Shares Issued and Outstanding 35,145,281 Fully Diluted Common Share Listing: TSX.V:OCO Frankfurt: OR6 *Management Holdings +11,000,000
  18. 18. DIRECTORS Stephen M. Leahy, Executive Chairman, Director • Founder of North American Tungsten • Over 26 years of experience in venture capital • Chairman, CEO, Director of North American Tungsten Ltd. Ken Thorsen, President and CEO, Director • Over 40 years of experience in the mining business • 8 years with Selection Trust; 3 years with Cameco • 21 years with Teck Corporation and 7 years as a consultant • Senior Exploration Executive at Teck Cominco including 2 year period as President of Teck Exploration Ltd. Robert Friesen, Director • Over 40 years of experience in mining and minerals exploration • 7 years as Chief Geologist with Noranda Group • 5 years as a Project Geologist with Teck Exploration Ltd. Casey Forward, Director and Chief Financial Officer • Over 25 years of accounting experience in North America and the United Kingdom with numerous public companies
  19. 19. TSX-V: OCO Frankfurt: OR6 www.orocoresourcecorp.com
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×