26th Street Development
Upcoming SlideShare
Loading in...5
×
 

26th Street Development

on

  • 560 views

renovation of a foreclosure

renovation of a foreclosure

Statistics

Views

Total Views
560
Views on SlideShare
533
Embed Views
27

Actions

Likes
0
Downloads
1
Comments
0

3 Embeds 27

http://eagacompanyhelp.blogspot.com 15
http://www.eagacompanyhelp.blogspot.com 11
https://www.linkedin.com 1

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash
  • Existing 90’s kitchen with mirrored back splash

26th Street Development 26th Street Development Presentation Transcript

  • EAGA Company, LLc Real Estate and Development COST: No charge initial consultations
    • Looking for a resource to develop real estate investment property?
    • Looking for a comprehensive development solution?
    • Concerned with contractor performance?
    • Concerned with falling behind schedule?
    If you answered “YES” to any of these questions, We are the company for you. EAGA provides a “NOT ANY MORE” answer to the these questions. Contact Us Today For a Free Consultation 215-395-6220 office 215-769-1603 fax [email_address] email
  • EAGA Company, LLc Real Estate and Development
    • Five Steps to Project Development
    • Successful Projects Share These Common Components. Plan To Succeed .
    • Design Management
    • Estimating & Bidding Management
    • Contract Management
    • Construction/Production Management
    • Close Out/Occupancy Management
    Coordination and Communication Lead to Successful Projects
  • EAGA Step - 1
    • Design Management .
    • Existing Floor Plans
    • Preliminary Design Floor Plans
    COST: $ 1,000 – $ 3,000 average ( $1 - $1.10/ sf on avg.) Municipal Submissions Zoning/Building Submissions Final Construction Drawings and Permit Sets Small Projects Interiors Layouts: Bathrooms, Kitchens
    • ………… How does Design Management work
    • . and do I need it …………… YES YOU DO….. !
    • … .i t begins with an inch by inch survey of the property……….
    • … . drawings of existing conditions are prepared……
    • ..... Owner ideas for new walls, fixtures and appliances are incorporated into the plans….
    • … ..a materials count for doors, windows and finishes is done ….
    • … . the final plans are priced for materials and labor ready for bidding…
    • The floor plans are also ready for zoning and building permit applications………
    • ……… . For pricing and application
    Coordination and Communication Leads to Successful Projects
  • EAGA Step - 2
    • Estimating & Bidding Management
    COST: Included by percentage in STEP 4 Three estimating methods Itemized estimating Assembly estimating Quantity estimating Three bidding methods Qualifying Application on File Insurance Verification License Verification   
    • …………… .How does Estimating & Bidding Work ?
    • … . and do I need it …………… YES YOU DO….. !
    • … from the priced floor plan other cost are added completing the overall budget….
    • … quotes are requested from qualified contractor(s) ….
    • … contractor bids are received and reviewed….
    • … .bids from Contractors are compared to the budget …..
    • … selected contractor(s) are approved by insurance and license verification…………..
    • ……… . For protection and verification
    Coordination and Communication Leads to Sucessful Projects
  • EAGA Step - 3
    • Contract Management
    COST: Included by percentage in STEP 4 Contracting methods Owner and Construction Manager Owner as General Contractor Owner and Subcontractor   
    • ……… How does Contract Management work
    • … . and do I need it …………… YES YOU DO….. !
    • … contracts are prepared between you and the contractor….
    • … contracts are reviewed for compliance with the budget ….
    • … contracts are reviewed for understanding of the work to be completed….
    • … .contracts are reviewed for method of payment…..
    • ……… . For piece of mind
    Coordination and Communication Leads to Sucessful Projects
  • EAGA Step - 4
    • Construction Management (CM)
    COST: 7% of the projected construction cost ( includes steps 1,2,3 & 5) Production methods Overall Delivery Schedule Long Lead Purchase Agreements Cost Tracking Certificates of Payment for work in Place Regulated Inspections Warranty Program Lawful Use   
    • ……… How does CM work
    • … . and do I need it …………… YES YOU DO….. !
    • … CM schedules and coordinates the contract work and identifies potential conflicts….
    • … .CM monitors long lead purchases avoids shipping delays for critical installations..….
    • … CM tracks cost, reviews and substantiates change orders to control cost……
    • … CM verifies contractor invoices and verifies amounts for payment compared to work completed …
    • … .CM protects the owner from over payment…….…..
    • ……… . For production controls
    Coordination and Communication Leads to Successful Projects
  • EAGA Step - 5
    • Close out and Occupancy Management
    COST: Included by percentage in STEP 4 Close out methods Final Inspections Final Commissioning Final Occupancy Certificate Issuance 30 Day Warranty Period 330 Day Warranty Period Final Contractor Release 1 year   
  • Benefits & Applications
    • Benefits
    • Pricing for the Application,
    • Owner Protection
    • Contractor Verification
    • Production Controls
    • Piece of Mind
    • Applications
    • Residential Projects
    • Renovations/ Rehabs
    • Commercial Projects
    • Fit-outs/Conversions
    • Daycare centers
    • Churches
    • Charter Schools
    • www.eagodboltcm.com
    • A better solution to investing
    • EAGA Company, LLC Real Estate and Development
    • Philadelphia, Pennsylvania
    • Architectural & Interior Designers
    • Construction Managers
    • Licensed Realtors
    • Notary Publics
    • 215-395-6220 office, 215-769-1603 fax, [email_address]
    A Multi-Disciplined Management Approach
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010 Project progress photos for 26 th Street Commons. EAGA Company LLc, manages project development protocols including; architectural design, construction, sales and maintenance services on mid to large scale building projects for a client base of investors, homeowners and developers. Our consulting service manages the project from discovery and acquisition of the property through the completion of construction or renovation. We coordinate the development of the entire project. Our services are licensed and insured. Contact: 215-395-6220
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Discovery
    • Acquisition
    • Closing
    • Construction
    • Property Management
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Building Assessment
    • Electrical Assessment
    • Thermo Assessment
    • Supply Lines Assessment
    • Elevations and Floor Level Assessment
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Building Assessment
    • Electrical Assessment
    • Supply Lines Assessment
    • Elevations and Floor Level Assessment
    • Before /After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Existing Conditions
    • First Floor Front
    • Before /After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • First Floor Full Bathroom
    • Fixture Assessment
    • Re-Design Assessment
    • Preliminary Cost Assessment
    Project progress photos for 26 th Street Commons. Before /After
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Second Floor Rear
    • Existing Condition
    • Electrical Assessment
    • Supply Lines Assessment
    • Elevations and Floor Level Assessment
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Second Floor Front
    • Existing Condition
    • Electrical Assessment
    • Supply Lines Assessment
    • Elevations and Floor Level Assessment
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Second Floor Hall
    • Existing Condition
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Main Entry Foyer Wainscoating
    • Add Poly Finish
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • New Roofing Membrane
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Second Floor Full Bathroom Existing Condition
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Third Floor Landing
    • Existing Condition
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Third Floor Rear
    • Existing Condition
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • First Floor Rear Office
    • Existing Condition
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • Third Floor Electrical Raceway & Wiring
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • First floor bathroom
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • First Floor Entry Hall
    • Before/After
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010
    • First Floor Front Unit
    Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010 Project progress photos for 26 th Street Commons.
  • EAGA Company, LLc Real Estate and Development Sample Project Gallery 2010 The projects in this Gallery were designed, coordinated, managed, supervised and installed by Eric Godbolt and subcontractors of EAGA Company, LL C, a real estate and development consulting firm. EAGA procures and manages architectural design, construction, sales and maintenance services on mid to large scale building projects. Our consulting fee is a percentage of the total development cost and GMP (Gross Maximum Price) for construction inclusive an hourly rate for on site construction administration and supervision. Our services are licensed and insured. Contact: 215-395-6220