Your SlideShare is downloading. ×
0
The Netherlands
The Netherlands
The Netherlands
The Netherlands
The Netherlands
The Netherlands
The Netherlands
The Netherlands
The Netherlands
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

The Netherlands

461

Published on

The Netherlands Regulatory lessons learnt

The Netherlands Regulatory lessons learnt

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
461
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. The Netherlands Regulatory lessons learntMinistry of Economic Affairs, Agriculture and Innovation Hedwig Verhagen
  • 2. Regulatory lessons learnt• General• Specific: Storage Permit Experience
  • 3. General regulatory lessons learnt• EU Directive CCS: + strict implementation policy + layered approach (law, administrative order, regulation, compliance & supervision) – balance: detail/rules & flexibility – room to incorporate practical experience+ projects help regulation - vice versa- liability remains issue (ETS-allowances)- external safety: lack of standardized models(pipelines)± it is not all about regulation : stakeholderengagement
  • 4. Specific regulatory lessons learnt• Storage permit experience• Taqa gas field P18-4 (ROAD-project)
  • 5. Specific regulatory lessons learntStorage Permit Experience: Taqa field P18-4
  • 6. Specific regulatory lessons learntStorage Permit Experience: Taqa field P18-4
  • 7. Specific regulatory lessons learntTaqa field P18-4 – draft permit+ experienced authorities+ room for direct contact+ clear competences - responsibilities+ balance: rules & compliance+ "future proof": work with updates
  • 8. Specific regulatory lessons learntTaqa field P18-4 – draft permitIssues:• length of procedure (change in legislation)• timing: • need to know everything upfront: evolving knowledge • operational status of plans: evolving • post closure – transfer: uncertainty• financial security – content• ETS rights (3 months uncontrolled leakage)• measures for wells in adjacent reservoir (P15-9)
  • 9. Specific regulatory lessons learntTaqa field P18-4 – draft permitCommission Advisory Opinion• 6 months (documents, meetings)• enabled corrections to draft permit for public consultationround• positive opinion: suitability storage location, delimitationstorage site, requirements for storage, CO2 stream, financialsecurity• general comment on present operational status of plans, Cionto be contacted on updates

×