Philippe Joubert Alstom CCS presentation

1,726 views
1,590 views

Published on

Philippe Joubert, Deputy CEO of Alstom, presented on the technology provider’s portfolio of projects around the world. He also discussed challenges for CCS.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,726
On SlideShare
0
From Embeds
0
Number of Embeds
214
Actions
Shares
0
Downloads
40
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Philippe Joubert Alstom CCS presentation

  1. 1. Carbon Capture & Storage Philippe Joubert Durban, December 2011
  2. 2. Context: CO2 emissions continue to grow World energy-related CO2 emissions CO2 emissions by sectorGt CO2 30 Others Residential, services & agriculture 20 Power generation 10 Industries 0 Transport 1880 1900 1920 1940 1960 1980 2000 2020 Source: IEA 2010 Source: Alstom, adapted from CDIAC 2004 Power generation represents >40% of CO2 emitted by fossil fuels ALSTOM © 2011. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  3. 3. Global power market forecast – next 5 years New Power Plant Orders in GW p.a Biggest demand in emerging countries Growing share of CO2-free all across the globe.ALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  4. 4. Alstom Clean Power strategy Emissions CO2 (Gt/y) N° 1 nuclear* & biomass * Conventional islands Technology Mix Wind, solar & Efficiency geothermal CCS N° 1 hydro Efficiency: Plant optimisation & retrofit 2005 Ref 2030 Stabilize Needed 1000 ppm emissions path First CO2 capture +6oC 550 ppm 450ppm demo plant in the +30C +20C max world Alstom is the world leader in clean integrated solutionsALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  5. 5. The CCS Vision • International Energy Agency BLUE Map − CCS accounting for 19% of the 2050 CO2 emissions reduction goal - Failure to deploy CCS would increase cost of 2050 power sector decarbonization by 70%ALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  6. 6. Alstom activity on demonstrations 1st and 2nd Generation CCS Completed Operating Under Pre-commercial Projects Construction NER300 NER300 AEP Mountaineer Vattenfall Schwarze- Total Lacq TCM Mongstad PGE Belchatow Drax - Selby USA - 58 MWth Pumpe Germany- France - 30 MWth Norway - 40 MWth Poland – 260 MWe Adv. UK - 426 MWeChilled Ammonia, Coal 30 MWth Oxy - Lignite Oxy - Gas Chilled Ammonia - Gas Amines - Lignite Oxy – Hard Coal 2nd Gen NER300 EoN Karlshamn Dow Chemical Co. DOE/Alstom Windsor EDF – Le Havre Getica - CET Turceni Datang- China Sweden - 5 MWth USA, West Virginia US – 3 MWth France – 5 MWth Adv. Romania – >250MWe Oxy 350 Mwe lignite,Chilled Ammonia -Fuel Adv. Amines - Coal Chemical looping, Coal Adv. Amines - Coal Chilled Ammonia - Lignite Post 350 MWe eq. Coal 2nd Gen NER300 2 Gen ON HOLD ON HOLD WE – Energie Alstom BSF Windsor Alstom Labs Växjö RFCS EU -Darmstadt Vattenfall Jänschwalde AEP Mountaineer USA WI - 5 MWth US - 15 MWth Sweden – 0.25 MWth Germany –1 MWth Germany - 250 MWe USA – 235MWeChilled Ammonia, Coal Oxy - Coals Post C. – multi purpose Chemical Looping - Coal Oxy - Lignite Chilled Ammonia - Coal NER300: Applied for EU ETS Selected for receiving New Entrant Reserve funding EEPR funding ALSTOM © 2011. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  7. 7. Mountaineer inauguration Mountaineer: First world CCS project with chilled ammonia Tens of thousands of tons captured and stored in MountaineerALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  8. 8. CCS roadmap: time-to market 5 Commitment taken in 2005 to be ready before 2015ALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  9. 9. The CCS Reality today• 74 large-scale integrated CCS projects identified world-wide *• 8 already operating – on gas processing/synfuels/fertilizer plants• Only 6 new projects in execution, including 2 for power• Many major demonstrations postponed indefinitely due to uncertain policy environment & lack of funding• Technology has hit speed-bump on the road to commercialization• Government support has detached from timetable set for CCS deployment by the 2009 CSLF * GCCSI project database June 2011 2020 targets will not be achieved at current pace ALSTOM © 2011. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  10. 10. What have we learned ?• It’s not a technology problem…CCS works − Capture rates as high as 90% − CO2 purity about 99% CCS PLANT – ENERGY PENALTY % AGAINST MWe net REF PLANT − Energy penalty <20%, on the way to 15% 20% CCS OXY 19% CCS PCC 18% 17% 16% 15% 14% 2010 2015 2020 2025 2030 2035ALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  11. 11. What have we learned ? • It’s not the cost…CCS already is cost-competitive − In-depth Alstom cost analysis shows that: • Coal & Gas with CCS provides − Electricity cost lower than solar, geothermal, offshore wind − Is competitive with nuclear, large hydro & onshore wind − Is competitive with renewables even without counting for system costsALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  12. 12. Costs of decarbonised power compared€ / MWh CoE - Low Carbon technologies Europe, 2011-2016 400 300 200 Reference case 100 84 65 0 15 ro 15 ar al d V al d in in rP rm d le rm 20 20 W W Hy uc la e he S S e e So th C C N r r rT ho eo ho TC C la l ns ffs G oa G So O O C dc C r Ha PCSource : Alstom analysis 2011 CCS on Coal and Gas are competitive ALSTOM © 2011. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  13. 13. Getting back on track CCS Deployment & Progress Towards Climate GoalsALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  14. 14. Conclusion This is urgent – no solution without CCSALSTOM © 2011. We reserve all rights in this document and in the information contained therein.Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
  15. 15. www.alstom.com

×