Valmont Bike Park Concept 1

990 views
921 views

Published on

This is a conceptual overview of Phase 1 of the Valmont Bike Park

Published in: Sports, Lifestyle
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
990
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Valmont Bike Park Concept 1

  1. 1. bike pump trackPhase 1: viewing plazaThis drawing represents the first phases of development at bike terrain parkValmont City Park. This Phase will be limited to the northside and will include development of the bike park, dogpark, multi-use paths, rehabilitated Platt House, and a tot-lot. kids bike skill area historic irrigation ditch* bike skill area* ditch crossings are contingent on negotiations with the ditch company clubhouse (rehabilitated Platt Farmhouse) tot lot dog park 50 (large dogs 3.5 acres) historic irrigation ditch* irrigation pond dog park pump house (small dogs 1.5 acres) potential neighborhood 55 commercial development valmont road roney farmhouse potential neighborhood commercial developmentdisc golf course(18-hole) 34 sterling drive future development zone w ay a rk r lp p eaLEGEND multi-use path network existing vegetation multi-modal trail connections proposed vegetation nordic trail building envelopes (uses to be determined) easy/moderate bike trail (cyclocross race course/ ~2 miles) existing structures moderate/difficult bike trail (singletrack with features/ ~.6 miles) picnic/shade structures 0 50 100 1”=100’ north VALMONT CITY PARK Draft Concept - Phase 1 june 2008

×