The international boiling point project
Upcoming SlideShare
Loading in...5
×
 

The international boiling point project

on

  • 1,337 views

Project description for purifying polluted water.

Project description for purifying polluted water.

Statistics

Views

Total Views
1,337
Views on SlideShare
1,302
Embed Views
35

Actions

Likes
0
Downloads
0
Comments
0

3 Embeds 35

http://blog.ssis.edu.vn 21
http://sandbox3.ssis.edu.vn 13
http://www.slideshare.net 1

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

The international boiling point project The international boiling point project Presentation Transcript

  • Saigon South International School
    Mr. Johnston
    Grade 7 Science
    The International Boiling Point Project
  • “F” Block Data
    Trial 1
    Average Room Temp: 25.1 C
    Average Boiling Temp: 98.6 C
    Average Cost for student apparatus: $264.5
    Trial 2
    Average Room Temp: 24 C
    Average Boiling Temp: 98.8 C
    Average Cost for student apparatus: $410.67
    Trial 3
    Average Room Temp: 24.5 C
    Average Boiling Temp: 98.6 C
    Average Cost for student apparatus: $529
    Note: Mr. J’s apparatus not factored into average cost. Cost of Mr. J’s apparatus: Trial #1=$545
  • “F” block average price per milliliter
  • “A” Block Data
    Trial 1
    Average Room Temp: 25.7 C
    Average Boiling Temp: 96.3 C
    Average Cost for student apparatus: $246.80
    Trial 2
    Average Room Temp: 25.4 C
    Average Boiling Temp: 97.8 C
    Average Cost for student apparatus: $504.60
    Trial 3
    Average Room Temp: 25 C
    Average Boiling Temp: 98 C
    Average Cost for student apparatus: $570
    Note: Mr. J’s apparatus not factored into average cost. Cost of Mr. J’s apparatus: Trial #1=$545
  • “A” block average price per milliliter
  • “B” Block Data
    Trial 1
    Average Room Temp: 24.3 C
    Average Boiling Temp: 98.3 C
    Average Cost for Apparatus: $282.67
    Trial 2
    Average Room Temp: 24.8 C
    Average Boiling Temp: 99 C
    Average Cost for Apparatus: $395
    Trial 3
    Average Room Temp: 26.8 C
    Average Boiling Temp: 93.3 C
    Average Cost for Apparatus: $484
    Note: Mr. J’s apparatus not factored into average cost. Cost of Mr. J’s apparatus: Trial #1=$545
  • “B” block average price per milliliter
  • Mr. J’s Design-Trial #1
    Trial 1
    Cost-$545
    Water Collected: 21 ml
    Cost/ml: $25.95/ml
  • Mr. J’s Design-Trials 2 and 3
    Trial 2
    Cost: $588
    Water Collected: 44ml
    Cost/ml: $13.36
    Trial 3