Emc   firms experience sheets 2012
Upcoming SlideShare
Loading in...5
×
 

Emc firms experience sheets 2012

on

  • 2,422 views

 

Statistics

Views

Total Views
2,422
Views on SlideShare
2,422
Embed Views
0

Actions

Likes
1
Downloads
15
Comments
2

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Emc   firms experience sheets 2012 Emc firms experience sheets 2012 Document Transcript

  • FIRMS EXPERIENCEAssignment Name:Initial Environmental Examination of Study of Sale Country:of 2 MW Surplus Power to HESC from Digri Sugar PakistanMills Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Taluka Digri, District Mirpurkhas Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Digri Sugar Mills (Pvt) Ltd Seven (06) No. of Staff Months: Duration ofAddress: Assignment:48-J/1, Block-6, PECHS, Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 3,350 Jul 2012 August 2012 Rs. 318,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (ProjectCoordinator/Environmentalist), Dr. Badar Munir Ghauri (Air Quality Management Expert), S.M.Zaman (Senior Geologist), Zulekha Soorma (HSE Advisor), Masood ur Rahman(Environmental Expert), Sarah Siddiki (Environmentalist)Narrative Description of Project:The project comprises of construction, up gradation and installation of power transfercomponents that includes power cables, transformer, switch gears and other connectivityequipments. The power plant is provided with two Shinko 3 megawatt turbo generators togenerate 6 MW electricity, out of which upto 4 MW is utilized by the Digri Sugar Mills,whereas, upto2 MW surplus power will be supplied to HESCO during cane crushing season.Description of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposedproject; a mitigation matrix containing technical and non-technical measures was developedfor both the project phases. Future monitoring requirements were also identified 1|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Satellite Data PakistanReceiving Ground Station for Agriculture Project Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Industrial Triangle at Islamabad Highway near Toll Environmentalists, Engineers and otherPlaza specialistsName of Client: No. of Staff:Pakistan Space & Upper Atmosphere Research Six (06)Commission (SUPARCO)Address: No. of Staff Months: Duration ofSUPARCO-Headquarters Assignment:Sector-28, Gulzar-e-Hijri, Off University Road, 10 Staff Months, Two (02) MonthsKarachi Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 2,370 Jun 2012 Jul 2012 Rs. 225,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Deputy Project Manager/EIAExpert), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Syed AsadGhufran (Ecologist), Masood ur Rahman (Wastewater & Drainage Specialist), Madiha Syed(Environmentalist)Narrative Description of Project:The building locates in Industrial Triangle at Islamabad Highway near Toll Plaza. The projectrequires the establishment and operation of ground receiving station that will perform thefollowing operations: Receiving signals from remote satellite Acquisition of Satellite Remote Sensing (SRS) data for agriculture crops in Pakistan Acquisition of SRS data will also be used for earth resources surveying, mapping and environmental monitoring studies Acquisition of data for atmospheric/meteorological studiesDescription of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposedproject; a mitigation matrix containing technical and non-technical measures was developedfor both the project phases. Future monitoring requirements were also identified 2|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Study of Faras Fertilizer’s PakistanAcid Manufacturing Plant Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Port Qasim Authority, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Faras Fertilizer Company (Pvt) Ltd Nine (09)Address: No. of Staff Months: Duration of77-D, New Muslim Town, Main Wahdat Road, Assignment:Lahore 34 Staff Months, Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 10,010 Apr 2012 Jul 2012 Rs. 950,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (EIA Expert), Dr. Mirza Arshad AliBeg (Team Leader/Principal Expert), Dr. Muhammad Mansha (Expert on Air Quality), Dr.Mansoor Imam (Waste Management Expert), Mr. Masood ur Rahman (EnvironmentalEngineer), Madiha Syed (Environmentalist), Sarah Siddiki (Environmentalist), Nida Kanwal(Sociologist)Narrative Description of Project:The proposed project site is located in Eastern Industrial Zone of Port Qasim Authority. Theproposed acid manufacturing plant will be established over an area of 2 acres.The proposed project is an integrated Acid Plant that will produce Sulphuric Acid, Formic Acidand Sulphonic Acid. The major components of the project include the following mainmanufacturing units and associated structures: Sulphuric Acid Plant Formic Acid Plant Sulfonic Acid Plant Other Associated StructuresDescription of Actual Services Provided by Your Staff: Site visits Review of Legislation and Guidelines Secondary Data Collection Scoping Sessions with Relevant Stakeholders Field Surveys for Data Collection Impact Identification and Assessment Recommendations to Mitigate Impacts Environmental Management Plan (EMP) 3|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Naxon’s PakistanMarriage Hall Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Bahadur Yar Jang Cooperative Housing Society, Environmentalists, Engineers and otherBlock-3, Karachi specialistsName of Client: No. of Staff:Mr. Junaid & Mr. Umer Naqi Seven (07)Address: No. of Staff Months: Duration ofSNPA 64-B, Waheeduddin Khan Bozai Road, Assignment:Bahadurabad, Karachi 6 Staff Months, One (01) Month Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 1,580 Jul 2012 Jul 2012 Rs. 150,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi (Senior Environmental Expert), Saquib Ejaz Hussain(Environmental Expert), Noor Fatima (Environmentalist), Nida Kanwal (Project Coordinator),Madiha Syed (Environmentalist),Narrative Description of Project:The Marriage Hall is ground floor + Boundary wall, it comprising bridal room, stage, toilet,store room, kitchen, reception, booking office, open lawn, underground water tank, drive wayand proponent are also providing motor cycle parking area. The total plot area of the project1023.00 SQ. YRD or 9208.68 SQ. FT.The project is surrounded by open spaces and serenity, Marriage Hall is basically the latestaddition to the accessible modern wedding halls present in the area of Bahadurabad thatpromises optimum space utilization, comfort and stylish making merry.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 4|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Agha Steel PakistanMills Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Agha Steel Industries Seven (07) No. of Staff Months: Duration ofAddress: Assignment:Plot-48, Sector-28, Korangi Industrial Area, Karachi 26 Staff Months, Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 8,429 Apr 2012 Jul 2012 Rs. 800,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi (Senior Environmental Expert), Saquib Ejaz Hussain(Environmental Expert), Noor Fatima (Environmentalist), Nida Kanwal (Project Coordinator),Madiha Syed (Environmentalist)Narrative Description of Project:The proposed Agha Steel Mill will be established on a 10 Acres of plot of land located at PortQasim, Karachi. The production capacity of this steel manufacturing plant will be 2,50,000Tons per Annum.The project will comprise the following components: Meltshop for production of High/Low carbon, Stainless Steel Products and cast billets Rolling Mill for production of hot rolled bar and wire rodDescription of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 5|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental & Social Impact Assessment (ESIA) Pakistanof Karachi – Hyderabad Motorway (M-9) Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Existing 136 Km Karachi – Hyderabad section of Environmentalists, Engineers and otherNational Highway N-5 specialistsName of Client: No. of Staff:Binapuri Pakistan Pvt Ltd (BPL) Ten (10)Address: No. of Staff Months: Duration ofOffice # 84, Street No. 3, Sector-HH, Phase-IV, Assignment:Defence Housing Authority, Lahore 38 Staff Months, Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 47,418 Mar 2012 Jun 2012 Rs. 4,500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Project Coordinator), Dr. MirzaArshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Muhammad Mansha (Expert onAir Quality), Dr. Mansoor Imam (Expert on Waste Management), Dr. Syed Ali Ghalib/Razaque(Expert on Fauna), Dr. Viqar Hussain (Expert on Geology), Saddar-ud-din (Expert on Flora),Tasneem Bhatti (Expert on Social Issues), Noor Fatima (Environmentalist)Narrative Description of Project:The project starts off at Km 13+000 (Project Chainage 0+000) of the NHA reference underthe flyover/interchange provided for the Lyari Expressway on the Lyari River and ends at Km149+000 (Project Chainage 136+000) in the proximity of the clover leaf interchange on theHyderabad Bypass.The proposed project involves rehabilitation of the existing 134.35 Km (Length reduced by1.65 Km at Hyderabad end, terminating before Hyderabad Interchange) of 4-Lanecarriageway both north-bound and south-bound and construction of an additional new laneon the inner side of the Highway wherever technically feasible. Both rehabilitation andwidening bound carriageways will be divided by a New Jersey Barrier. Extensions are to bemade to all the existing bridge structures and culverts. Four (4) bridges have an additionalextension on either side accommodating service roads to allow local traffic to negotiate landlocked areas between canals.Description of Actual Services Provided by Your Staff:The ESIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 6|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Aviation PakistanEnclave (Housing Project) Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Gadap Town, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Central Builders & Developers Nine (09) No. of Staff Months: Duration ofAddress: Assignment:3 – Main Shahrah-e-Faisal, Karachi 15 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 9,483 May 2012 Jun 2012 Rs. 900,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Deputy Project Manager), Dr.Mirza Arshad Ali Beg (Team Leader/EIA Expert), Dr. Mansoor Imam (Urban Planner & WasteManagement Expert), Dr. Shahid Alam (Structural Engineer), Ashar Hashmat Lodi (TransportEngineer), Dr. Badar Munir Khan Ghauri (Air Quality Expert), Nida Kanwal (Sociologist),Masood Rahman (Environmental Engineer)Narrative Description of Project:Aviation Enclave is proposed to have single and one unit bunglows measuring 120-400 sq.yds and open plots in both residential and commercial category measuring 120-400 sq. ydsresidential plots and 750-5295sq. yds commercial plots.All the infrastructure facilities will e provided at the site.Description of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposedproject; a mitigation matrix containing technical and non-technical measures was developedfor both the project phases. Future monitoring requirements were also identified 7|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Machiyara PakistanTower Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):KDA Scheme No. 5, Clifton, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Bashir Machiyara Six (06) No. of Staff Months: Duration ofAddress: Assignment:Near Portia Fabrics, Main Bahadurabad, Karachi 10 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 6,322 May 2012 Jun 2012 Rs. 600,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi (Senior Environmental Expert), Saquib Ejaz Hussain(Environmental Expert), Madiha Syed (Project Coodinator), Noor Fatima (Environmentalist)Narrative Description of Project:The proposed project is a development project covering a total area of plot i.e. 1220.75SQ.YRD, (10986.75 SQ.FT). The project development will comprises of site developmentworks and construction of i8nfrastructure including building structures, drains, sewers andother utilities. The project is surrounded by open spaces and serenity. “Machiyara Tower” isbasically the latest addition to the accessible modern homes present in the area of Cliftonthat promises optimum space utilization, comfort and stylish living. Machiyara Tower”accommodates to all necessities which a family desires from the residential areas andapartment buildings i.e. to has easy access to the schools, religious places and businessdistricts.Description of Actual Services Providedby Your Staff:Study was made to develop the baseline andidentify the potential impacts of the proposedproject; a mitigation matrix containingtechnical and non-technical measures wasdeveloped for both the project phases.Future monitoring requirements were alsoidentified 8|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Tayyabi Garden Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):North Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Hiba Builders & Developers Six (06)Address: No. of Staff Months: Duration of6-7, Ground Floor, 64/3, C.P.Berar Society, Assignment:Sharafabad, Karachi, Karachi Approx. Value of Services (In Start Date CompletionDate Current US$ &Rs.) (Month/Year) (Month/Year) US$. 5,268 Jun 2012 Jun 2012 Rs. 500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Environmental Expert), Dr. MirzaArshad Ali Beg (Team Leader/Senior Environmental & Social Expert), Faisal Mustafa (Air NoiseQuality Expert), Madiha Syed (Project Coordinator), Noor Fatima (Environmentalist)Narrative Description of Project:Tayyabi Garden apartments are ground+ 15 floors car parking, children play area, 12 floorresidential project comprising 2 & 3 bedrooms super luxury apartments. The total area of theproject is 1000.00 SQ.YRD. The project development will comprises of site development works &construction of infrastructure including building structures, drains, sewers and other utilities. Theproject accommodates to all necessities which a family desires from the residential areas andapartment buildings to the schools, religious and business districts.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 9|P age
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Euro Duplex City Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):North Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Euro Builders & Developers Six (06)Address: No. of Staff Months: Duration ofPlot No.D-14, Block-F, Hydri, North Nazimabad, Karachi, Assignment:Karachi Approx. Value of Services (In Start Date CompletionDate Current US$ &Rs.) (Month/Year) (Month/Year) US$. 6,322 Jun 2012 Jun 2012 Rs. 600,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (EIA Specialist), Dr. Mirza Arshad AliBeg (Team Leader/Senior Environmentalist), Noor Fatima (Environmentalist), Sarah Siddiqui(Environmentalist), Nida Kanwal (Sociologist)Narrative Description of Project:The proposed project comprises construction of thirteen (13) floor apartments with 04, 05 & 06rooms super executive apartments in three categories, Executive, Super Executive and Duplex.The project also houses exquisitely designed ultramodern showrooms fit for multinationalcompanies, chain stores, banks and other prestigious business establishments. The projectis ideally located for family living with easy access to schools, hospitals, parks, shopping centersand restaurants for a modern lifestyle.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 10 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Capacity PakistanEnhancement Project Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Qadirabad, 20 km from Sahiwal, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Phillip Morris Pakistan Ltd Nine (09)Address: No. of Staff Months: Duration of19th Floor, The Harbour Front, Dolman City, HC-3, Assignment:Block-4, Clifton, Karachi 15 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 7,376 April 2012 May 2012 Rs. 700,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Environmental Specialist), Dr.Mirza Arshad Ali Beg (Process Specialist & Senior Environmentalist), Dr. Iqbal Hashmi (WaterQuality Specialist), Jamal uddin Qureshi (Environmental Expert), Sultan Mehmood Zaman(Geologist), Faisal Mustafa (Air Quality Assessment Expert), Masood ur Rahman(Environmental Scientist), Nida Kanwal (Sociologist)Narrative Description of Project:The site located in Qadirabad, 20 km from Sahiwal. The site area is spread over 69635 m 2 ofland.The proposed project will compose of the following units:• New primary processing area• Modification in secondary production area• Additional secondary area• Modification in utility building• Installation of Wastewater Treatment Plant• Generator house extension• Medical Centre (Future Plan)• Modification of fire protection system in all buildings• Improvement in site equipment and services• Prayer Area• Workers CanteenDescription of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposedproject; a mitigation matrix containing technical and non-technical measures was developedfor both the project phases. Future monitoring requirements were also identified 11 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Kotri Unit PakistanExpansion Project Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Kotri, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Phillip Morris Pakistan Ltd Eight (08)Address: No. of Staff Months: Duration of19th Floor, The Harbour Front, Dolman City, HC-3, Assignment:Block-4, Clifton, Karachi 14 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 5,795 April 2012 May 2012 Rs. 550,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Environmental Specialist), Dr.Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Iqbal Hashmi (Water QualitySpecialist), Sultan Mehmood Zaman (Geologist), Faisal Mustafa (Air Quality AssessmentExpert), Masood ur Rahman (Environmental Scientist), Nida Kanwal (Sociologist)Narrative Description of Project:The site located in SITE Area Kotri District Jamshoro. The site area is spread over 1875 Acresof land.The proposed project will compose of the following units: New primary processing including FTD area Renovation of existing primary building Modification in secondary production area Additional secondary area Modification in utility building Installation of gas fired power plant Installation of Wastewater Treatment Plant Generator house extension Medical Centre Modification of fire protection system in all buildings Improvement in site equipment and services Prayer Area Workers canteenDescription of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposedproject; a mitigation matrix containing technical and non-technical measures was developedfor both the project phases. Future monitoring requirements were also identified 12 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Construction Pakistan& Operation of Denim International (Pvt) Ltd Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Denim International (Pvt) Ltd Six (06)Address: No. of Staff Months: Duration ofPlot No. 48, Sector 28, Korangi Industrial Area, Assignment:Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 5,795 April 2012 May 2012 Rs. 550,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Deputy Project Manager & ESIASpecialist), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Badar MunirGhauri (Air Quality Expert/Environmentalist), Noor Fatima (Environmentalist), Nida Kanwal(Sociologist)Narrative Description of Project:The proposed facility (DIPL) will be located in the Northwestern industrial zone of Port QasimArea over an area of 7 acres.The proposed Denim processing unit will be established at PortQasim to produce the finest quality of real indigo denim, and its variants, to suit the needs ofdiscerning customers worldwide. With a current proposed capacityof 1 million meters permonth, it can supply any variant of denim; basic, premium and high quality oe/oe, ring/oe,ring/ring in 100% cotton as well as polyester and streach denim.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 13 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Sumya Silk Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):BYJ Cooperative Housing Society, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:D.J. Builders & Developers Seven (07)Address: No. of Staff Months: Duration ofRoom # 203, 2nd Floor, Business & Finance Centre, I.I Assignment:Chundrigar Road, Karachi 13 Staff Months, Two (02) Months Approx. Value of Services (In Start Date CompletionDate Current US$ &Rs.) (Month/Year) (Month/Year) US$. 10,537 May 2012 Jun 2012 Rs. 1,000,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (EIA Specialist), Samita Nadeem (Civil& Environmental Engineer), Faisal Mustafa (Air & Noise Quality Expert), Noor Fatima(Environmental Scientist), Sarah Siddiki (Environmentalist), Nida Kanwal (Sociologist)Narrative Description of Project:The proposed project is being constructed on commercial plot of and measuring 1916 square.yards. The project is 15 stories residential and commercial development consisting of residentialapartments offered in 6 categories & shops at ground floor.The project development comprises ofLuxury Apartments and spacious ultramodern shops that have been assembled on the basement,ground floor, first floor and second floor and facing the inflow of traffic.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 14 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study for Karachi PakistanTransportation Improvement Project Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Nippon Koei Co. Ltd, Japan Ten (10) No. of Staff Months: Duration ofAddress: Assignment:Parsa Tower, Shahrae Faisal, Karachi 47 Staff Months, Five (05) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 99,750 Jan 2012 May 2012 Rs. 9,077,310Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Project Coordinator & EIA Specialist),Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Viqar Hussain (Geologist),Dr. Badar Munir Ghauri (Air Quality Assessment Specialist), Dr. Syed Ali Ghalib (Ecologist), Dr.Mansoor A.H. Imam (Waste Management Specialist), Syed AzharZaidi (Transportation Engineer),Khurram Shams Khan (Sociologist), Noor Fatima (Environmental Scientist)Narrative Description of Project:The project will be implemented on two priority corridors named as “Green Line Corridor” and“Red Line Corridor”.The 22 km long proposed Green Line corridor originates from Surjani Town and Terminates atRegal ChowkSaddar. This route passes through major roads of Karachi having significant demandof passengers including Sakhi Hassan Round About, Sher Shah Suri Road (Board Office RoundAbout), NazimabadChowrangi, Gulbahar/Golimar, Business Record Road (Lasbela), Gurumandir toM.A. Jinnah Road up to Radio Pakistan/Jamia Cloth Market. There are 28 stations and one depotproposed on this corridor.The 21 km long proposed Red Line Corridor originates from Model Colony (Tank Chowk) andPassing through Check Post No.6 of MalirCantt, SafooraMazar-e-Quaid/People’s Party Secretariatto Preedy Street Extension, Empress Market terminating at Regal Chowk. There are 27 stationsand two depots proposed on red line corridor.Both Green and Red Lines will operate up to Jama Cloth Market on M.A. Jinnah Road on GreenLine and to Regal Chowk along New M. A. Jinnah Road on the Red Line. This will avoid thetransfer between two lines near the center of the city.Description of Actual Services Provided byYour Staff: Site visits Review of Legislation and Guidelines Secondary Data Collection Scoping Sessions with Relevant Stakeholders Field Surveys for Data Collection Impact Identification and Assessment Recommendations to Mitigate Impacts Environmental Management Plan (EMP) 15 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Flood Emergency Reconstruction Project Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Two Districts of Sindh namely Jacobabad & Environmentalists, Engineers and otherKambar-Shahdadkot specialistsName of Client: No. of Staff:ECIL Six (06)Address: No. of Staff Months: Duration of29, Block 7/8, Darul Aman Housing Society, Sharae Assignment:Faisal, Karachi - 75350, 33 Staff Months, Six (06) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 14,225 Oct 2011 Mar 2012 Rs. 1,350,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Saquib Ejaz Hussain (Sociologist), Dr. Badar Munir Ghauri (Air QualityExpert/Environmentalist), Noor Fatima (Environmentalist), Muhammad Haseeb(Environmentalist)Narrative Description of Project:The reconstruction and rehabilitation project of five P1 roads is a network of five provincialroads.Roads spread over two districts of Sindh namely Jacobabad & Kambar-Shahdadkot.Four roads lie in Jacobabad district while the other in Kambar-Shahdadkot district.Description of Actual Services Provided by Your Staff: 16 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Preparatory Study on Karachi Circular Railway PakistanRevival Project (SAPROF-II) Hydrological Survey Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:JICA Seven (07) No. of Staff Months: Duration ofAddress: Assignment:223-F, Block-2, PECHS, Karachi 25 Staff Months, Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 140,659 Oct 2011 Jan 2012 Rs. 12,800,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager & ESIASpecialist), Dr. Mirza Arshad Ali Beg (Team Leader/ESIA Specialist), Dr. Iqbal Hashmi(Environmental Chemist & Technical Writer), Dr. Iqbal Ali (Hydrologist), Dr. Viqar Hussain(Geologist), Dr. Moazzam Ali Khan (Water Quality Specialist)Description of Actual Services Provided by Your Staff:Environmental Management Consultants (EMC) conducted the “Hydrological Survey” forJapan International Cooperation Agency (JICA) under the preparatory study on “Revival ofKarachi Circular Railway”. The scope of works for the survey included the following items:(1) Survey on Quantity of Stagnated Water(2) Survey on Quantity of Household Wastewater(3) Survey on the Discharge Point to be proposed(4) Collection of Rainfall Data, Water Level Data and Flow Regime Data(5) Survey/Collection on Flood Disaster Records(6) Water Quality Analysis(7) Wastewater Treatment Standards for discharge into public water in Pakistan(8) Existing Water Supply Drainage and Sewerage Survey. 17 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Construction & PakistanOperation of Grace Tower Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Siddiqui Builders & Developers Eight (08) No. of Staff Months: Duration ofAddress: Assignment:SB-1, Block-F, North Nazimabad, Karachi 14 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 4,395 Apr 2012 May 2012 Rs. 400,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Team Leader/Environmental Specialist),Dr. Mirza Arshad Ali Beg (Process Specialist/Senior Environmentalist), Dr. Iqbal .H. Hashmi (WaterQuality Specialist), Masood ur Rahman (Environmental Scientist), Sultan Mehmood Zaman(Geologist), Noor Fatima (Air Quality Assessment Expert), Nida Kanwal (Sociologist)Narrative Description of Project:The proposed project is a Mixed Use Development Project covering an area of 1153 square yards &located in Nazimabad. The project is fifteen stories residential and commercial developmentconsisting of residential apartments offered in 06 categories.The project development will include site development works and construction of infrastructureincluding building structures, drains, sewers and other utilities. Elevators, fire alarm and protectionsystem, intercom system, generators, and amenities areas have been allocated to make the projectmore attractive.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 18 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination Study for Establishment Pakistanof Smelting Plant Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Hub, Baluchistan Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Technova Enterprises (Pvt) Ltd Eight (08)Address: No. of Staff Months: Duration ofSuite No. 202, Silver Square, 6-C, 33rd Commercial Street, Assignment:Tauheed Commercial Area, Phase-V, DHA, Karachi 21 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 3,846 Mar 2012 May 2012 Rs. 350,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Team Leader/Environmental Specialist),Dr. Mirza Arshad Ali Beg (Pollution Control Specialist), Dr. Iqbal Hashmi (Waste Management Expert),Dr. Badar Munir Ghauri (Chemical Engineer/Air Quality Expert), Noor Fatima (Air Quality AssessmentExpert), Masood ur Rahman (Environmental Scientist), Sultan Mehmood Zaman (Geologist)Narrative Description of Project:The proposed smelting plant will be sited on plot # C-387, HITE, Hub Baluchistan. The primaryproject is designed for the reclamation of the lead in the scrap automotive or industrial batteries onan environmentally sustainable basis & selling the same for further use in the production of leadoxides or in the casting of grids, which will be used again in the production of lead acid batteries.Description of Actual Services Provided by Your Staff:Study was made to develop the baseline and identify the potential impacts of the proposed project; amitigation matrix containing technical and non-technical measures was developed for both the projectphases. Future monitoring requirements were also identified. 19 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination Study of Proposed Pakistan2.7 MW (Extendable to 12 MW) Gas Based Power Plant Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Kotri-Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Salim Yarn Mills (Pvt) Ltd Seven (07)Address: No. of Staff Months: Duration of7-B/1, near National Refinery Ltd, Korangi Industrial Assignment:Area, Karachi 13 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 2,197 Mar 2012 Apr 2012 Rs. 200,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/EnvironmentalSpecialist), Saquib Ejaz Hussain (Project Coordinator/Environmentalist), Dr. Badar Munir Ghauri (AirQuality Management Expert), Sultan Mehmood Zaman (Senior Geologist), Tauseef Latif(Socioeconomic Expert), Noor Fatima (Environmentalist)Narrative Description of Project:The project comprises construction, installation and operation of 2.7 MW (extendable to 12 MW)Gas Based Power Plant being installed at Salim Yarn Mills.The proposed plant comprises of six Caterpillar (Model Cat 3520-C) gas power internal combustionengines, each coupled with two MW generators. Each Engine is capable to produce 1900 KW.Natural Gas will be the main fuel for the plants. The plant is technically designed to operate on gasgenerating units with 90% power availability.Description of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts during constructionand operational phases were dealt separately. Mitigation measures were proposed for the potentialimpacts. Formulation of environmental monitoring program and institutional requirement was alsoincluded in the report 20 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of BOPET Unit Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Shah Latif Town, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Novatex Limited Eight (08) No. of Staff Months: Duration ofAddress: Assignment:8th Floor Textile Plaza, M.A. Jinnah Road, Karachi 14 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 4,670 Mar 2012 Apr 2012 Rs. 425,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Team Leader/Environmental Specialist),Dr. Mirza Arshad Ali Beg (Process Specialist/Senior Environmentalist), Dr. Iqbal .H. Hashmi (WaterQuality Specialist), Masood ur Rahman (Environmental Scientist), Sultan Mehmood Zaman(Geologist), Noor Fatima (Air Quality Assessment Expert), Nida Kanwal (Sociologist)Narrative Description of Project:The project will comprise of a single production line of BOPET film with an average production ofapproximately 25,000 tons/year. The BOPET line will be fully equipped with state-of-the arttechnology for the production of a wide variety of polyester films with thicknesses ranging from 12um to about 100 um and will be able to utilize not only for the packaging of products such asconfectionary, biscuits, potato snacks but also in textiles, tea, soaps, shampoos, and many otherapplications.Description of Actual Services Provided by Your Staff:Initial Environmental Examination (IEE) has been carried out to provide all necessary informationon potential environmental and social impacts at the different stages of BOPET Unit; an IEEdocument has been prepared to meet the legislative requirement of Pakistan EnvironmentalProtection Act 1997. All options for impact mitigation and management for the BOPET Unit wereexplored and suitable recommendations were given 21 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Sumya Bridge PakistanView Super Luxury Apartments Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):PECHS Block-3, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Sumya Builders & Developers Six (06)Address: No. of Staff Months: Duration ofPlot No. 159-R, Block-3, PECHS, Shaheed-e-Millat Road, Assignment:Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 5,494 Feb 2012 Mar 2012 Rs. 500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/Environmentalist),Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Faisal Mustafa (Air & NoiseQuality Expert), Noor Fatima (Environmentalist), Sarah Siddiki (Environmentalist)Narrative Description of Project:The proposed project comprises construction of seventeen (17) stories of 03, 04 & 05-roomexecutive suites and spacious, modern showrooms ideal for prestigious national and internationalcompanies.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 22 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Saima Pari Centre Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):North Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:S.P. Associates Builders and Developers Six (06) No. of Staff Months: Duration ofAddress: Assignment:Plot No. D-08, Block-N, North Nazimabad, Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 4,395 Feb 2012 Mar 2012 Rs. 400,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi (Senior Environmental Expert), Saquib Ejaz Hussain (ProjectCoordinator), Noor Fatima (Environmentalist), Madiha Syed (Environmentalist)Narrative Description of Project:The proposed Saima Paari Centre is being constructed on a commercial plot of land measuring18000.00 sq.ft (2000.00 sq.yd) and is located in North Nazimabad, Karachi. The project comprisedof fourteen storeys residential and commercial development consisting of 91 limited editionapartments of 4-5 rooms & showrooms at ground floor.The project is ideally located for family living with easy access to schools, hospitals, parks,shopping centers and restaurants for a modern lifestyleDescription of Actual Services Provided byYour Staff:Study was made to develop the baseline andidentify the potential impacts of the proposedproject; a mitigation matrix containing technicaland non- technical measures was developed forboth the project phases. Future monitoringrequirements were also identified. 23 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Futehally PakistanChemicals (Pvt) Ltd Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Mangohpir Road, Site, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Futehally Chemicals (Pvt) Ltd Seven (07) No. of Staff Months: Duration ofAddress: Assignment:D-86, Site, Manghopir Road, Karachi 46 Staff Months, Seven (07) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 6,923 Sep 2011 Mar 2012 Rs. 630,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmentalist), SaquibEjaz Hussain (Project Coordinator), Noor Fatima (Environmentalist), Masood-ur-Rahman(Environmentalist), Zulekha Soorma (HSE Advisor), Faisal Mustafa (Air Quality Expert)Narrative Description of Project:Futehally Chemicals is located at Site on an area of 6.75 Acres. The project has been undertakenas part of increase in production capacity of detergent manufacturing plant to 400 TPD (tons perday) and also to increase procurement of generic raw, packaging and finished product byconstruction of new warehouse.Another expansion to diversify its toll manufacturing business through the construction of adedicated sate of the art facility to cater to home care products and provision of wastewatertreatment plant.Description of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts duringconstruction and operational phases were dealt separately. Mitigation measures were proposedfor the potential impacts. Formulation of environmental monitoring program and institutionalrequirement was also included in the report 24 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed PakistanSeismic Survey Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Badin Block (Non Protected Area) Environmentalists, Engineers and other specialistsName of Client: No. of Staff:United Energy Pakistan Ltd Ten (10)Address: No. of Staff Months: Duration of4th Floor, Bahria Complex, 24 Maulvi Tameezuddin Assignment:Road, Karachi 24 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 6,593 Jan 2012 Mar 2012 Rs. 600,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Team Leader/ESIA Specialist),Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr. Iqbal Hashmi (Air QualityManagement Expert), Dr. Viqar Hussain (Senior Geologist), Dr. A. H. Imam (WasteManagement Expert), Dr. Asad Ghufran (Expert on Flora), Dr. Syed Ali Ghalib (Expert onFauna), Professor Mushtaq Mirani (Socio-Economic Expert)Narrative Description of Project:The project of seismic operations by UEPL in non-protected areas of Badin Concession Blockcomprises the said operation as a prelude to oil and gas exploration.The said Block covers a total area of approximately 6,600 sq.km and located in the fourdistricts of Sindh Province, which are Badin Thatta, Hyderabad and Mirpurkhas.Description of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts duringconstruction and operational phases were dealt separately. Mitigation measures wereproposed for the potential impacts. Formulation of environmental monitoring program andinstitutional requirement was also included in the report 25 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study of Thar PakistanCoal Mining Project Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Sinhar Vikian Varvai, Block-1 Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Sino-Sindh Resources (Pvt) Ltd Twelve (12) No. of Staff Months: Duration ofAddress: Assignment:House # 43/3/J/1, Block-6, PECHS, Karachi Five (05) Months Approx. Value of Services (In Start Date Completion Current US$ &Rs.) (Month/Year) Date(Month/Year) US$. 29,605 Oct 2011 Feb 2012 Rs. 2,700,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager & ESIASpecialist), Dr. Mirza Arshad Ali Beg (Team Leader/ESIA Specialist), Dr. Iqbal Hashmi(Environmental Chemist & Technical Writer), Dr. Iqbal Ali (Hydrologist), Dr. Badar Munir Ghauri(Air Quality Expert), Dr. Mansoor.A.H. Imam (Waste Management Expert), Dr. ViqarHussain(Geologist), Dr. Moazzam Ali Khan (Water Quality Specialist), Dr. Syed Ali Ghalib (Ecologist;Expert on Flora & Fauna), Abdul Razzaq (Expert on Fauna), TasneemBhatti (Socio-economicExpert)Narrative Description of Project:The project aims at mining of coal from Thar Coal field Block-1 for power generation of 900Mega Watts (MW)s. The main objective of the Thar Coal Mining Project Block-1 is to develop thecoalfield resource for power generation for energy and economic security of the country.Description of Actual Services Provided by Your Staff:The ESIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 26 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Euro Classic Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):North Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Euro Builders & Developers Six (06) No. of Staff Months: Duration ofAddress: Assignment:Plot No.D-14, Block-F, Hydri, North Nazimabad, Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 4,395 Jan 2012 Feb 2012 Rs. 400,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi (Senior Environmental Expert), Saquib Ejaz Hussain (ProjectCoordinator), Noor Fatima (Environmentalist), Sarah Siddiki (Environmentalist)Narrative Description of Project:The proposed project is a development project covering an area of 26996.06 sq.ft. Euro Classic isbasically the latest addition to the accessible modern homes present in the area of NorthNazimabad that promises optimum space utilization, comfort and stylish living.The project comprises of fire protection system, earthquake proof structure, wide internal roads,underground parking, modern elevators, a home automation system for energy saving and easyliving, Wi-Fi internet, water purification (reverse osmosis system, imported sanitary ware andfixtures, underground parking, porcelain floor tiles, security and extreme privacy, seweragetreatment line, concealed cabling (Tel, Cable and Intercom) and amenity areas have beenallocated to make the project more attractive.Description of Actual Services Provided byYour Staff:Screening of potential impacts of environmentalparameters was done, impacts duringconstruction and operational phases were dealtseparately. Mitigation measures were proposedfor the potential impacts. Formulation ofenvironmental monitoring program andinstitutional requirement was also included inthe report 27 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study for PakistanProposed Exploration Activities Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Dakhni M.L Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Oil & Gas Development Company Ltd (OGDCL) Eight (08)Address: No. of Staff Months: Duration ofOGDCL House, Jinnah Avenue, Sector F-6, Blue Assignment:Area, Islamabad 106 Staff Months, Fifteen (15) Months Approx. Value of Services (In Current Start Date Completion Date US$ &Rs.) (Month/Year) (Month/Year) US$. 16,483 Oct 2010 Jan 2012 Rs. 1,500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/EIA Specialist),Dr. Mirza Arshad Ali Beg (Team Leader/Principal Environmental Expert), Dr. Badar Munir Ghauri(Air Quality Management Expert), Dr. Viqar Hussain (Senior Geologist), Dr. Mansoor Imam(Waste Management Expert), Dr. Asad Ghufran Ecologist/Wildlife Expert), Jamal Qureshi (SocialEnvironmental Expert)Narrative Description of Project:The seismic data acquisition will be carried out using a combination of vibroseis and dynamitetechnologies. The 2D seismic operation is estimated to span over a period of 4-6 months. Theobjective of the seismic survey is to explore the subsurface in the area to identify hydrocarbonladen formations. This EIA study identifies and makes assessment of the impacts likely to arisefrom the seismic and drilling activities in Dakhni Mining LeaseDescription of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provide SEPAand other relevant agencies all the necessary information pertaining to social and environmentalimpacts of construction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 28 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study of 100 MW PakistanNBT Wind Power Project Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Dhabeji Environmentalists, Engineers and other specialistsName of Client: No. of Staff:NBT-Zab Wind Power Pakistan (Pvt) Ltd Nine (09)Address: No. of Staff Months: DurationD-94, B Street, 5th Avenue, Block-5, Kehkashan, Clifton, of Assignment:Karachi 23 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. Nov 2011 Jan 2012 Rs. 525,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/EIASpecialist), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr. Iqbal Hashmi(Technical Writer & EIA Specialist), Kaneez Fatima (Sociologist) Dr. Badar Munir Ghauri (Air &Noise Quality Expert), Dr. Syed Ali Ghalib (Expert on Flora & Fauna), Noor Fatima(Environmental Scientist), Irfan Hashmi (Expert on Carbon Management)Narrative Description of Project:The project has about 1500 Acres of SZABIST land in Dhabeji on the outskirts of Karachi. Theproject includes designing, testing, manufacturing and operation as well as maintenance ofwind turbines.The project includes installation and operation of 33 wind turbines in Phase-I for theproduction of 50 MW. Phase-II comprises installation of another 33 wind turbines andgeneration of 50 MW. The total capacity generation will then be raised to 100 Mw.Description of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 29 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination Study of Al Ghafoor PakistanOrchid Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Gulshan Iqbal Block-3, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Zuhair Builders Nine (09) No. of Staff Months: DurationAddress: of Assignment:Plot No. 26/1, Block-A, Nazimabad No. 1, Karachi 15 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 5,494 Dec 2011 Jan 2012 Rs. 500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. ProjectManager/Environmentalist), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr.Shahid Alam (Structural Engineer), Dr. Badar Munir Ghauri (Air Quality Expert), Ashar HashmatLodi (Transport Engineer), Dr. Mansoor Imam (Urban Planner/Environmental Engineer), NoorFatima (Environmental Sociologist), Amir Aziz (Environmental Scientist)Narrative Description of Project:The Project comprises construction of a sixteen (16) storeys tower over1066.67 yd 2 (9600.0 ft2)area of commercial plot (Plot No. C-14), located in Block-3, K.D.A. Scheme SCH-24, Gulshan-e-Iqbal Karachi East District. The project development consisting of 85 apartments with 3, 4 & 5room executive suites and spacious in four categories, Rose, Lily, Bluebell and Olive. The buildingheight is 165 ft. above ground level. The project offers accommodation options in 2 and 3Bedrooms with separate TV lounge and Drawing Room.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 30 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed Offshore PakistanDrilling Of NMR-01and NMR-02 Wells Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Indus Basin Block-Y Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Nikoresources (Pakistan) Ltd Eight (08)Address: No. of Staff Months: DurationBranch Office # 19, Faqir Aipee Road, Sector-I-11/3, of Assignment:Islamabad. 40 Staff MonthsSix (06) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 17,115 Jun 2011 Nov 2011 Rs. 1,557,465Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/Expert onPollution Chemistry), Dr. Mirza Arshad Ali Beg (Team Leader/Senior EnvironmentalSpecialist), Dr. Mansoor Imam (Natural Resource Management Expert), Dr. Shahid Amjad(Marine Ecosystem Expert), Dr. Iqbal Ali (Hydrologist), Dr. Viqar Hussain (Geologist), AhmedRaza (Petroleum Engineer)Narrative Description of Project:The project proponent has acquired four offshore blocks of Indus Basin in Pakistan namely,Indus X, Indus Y, Indus Z and Indus North & is planning to drill and conduct initial testing ontwo offshore exploration wells (NMR-01 and NMR-02) in Block Indus Y 2465.4in the IndusBasin. The drilling will be conducted with an area of approximately 80 km to 100 kmSouthwest of Karachi and at least 60 km offshore from the nearest landfall. The proposedwell locations are located within two 10 km radius polygons.The IEE Study has identified the environmental aspects likely to arise from the drilling andassociatedactivities in Indus Basin Y and has made assessment of the impact andrecommended mitigation measures to ensure environmental impacts are minimized and keptto acceptable limits.Description of Actual Services Provided by Your Staff:Initial Environmental Examination (IEE) has been carried out to provide all necessaryinformation on potential environmental and social impacts at the different stages of offshoredrilling; an IEE document has been prepared to meet the legislative requirement of PakistanEnvironmental Protection Act 1997. All options for impact mitigation and management for theproposed project were explored and suitable recommendations were given 31 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study of Seismic PakistanSurvey Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Fatehjang Block Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Oil & Gas Development Company Ltd (OGDCL) Eight (08)Address: No. of Staff Months: Duration ofOGDCL House, Jinnah Avenue, Sector F-6, Blue Assignment:Area, Islamabad 96 Staff Months, Fourteen (14) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 16,483 Oct 2010 Dec 2011 Rs. 1,500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Nil Provided by Associated Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/EIA Specialist),Dr. Mirza Arshad Ali Beg (Team Leader/Principal Environmental Expert), Dr. Badar Munir Ghauri(Air Quality Management Expert), Dr. Viqar Hussain (Senior Geologist), Dr. Mansoor Imam(Waste Management Expert), Dr. Asad Ghufran Ecologist/Wildlife Expert), Jamal Qureshi (SocialEnvironmental Expert)Narrative Description of Project:The proposed exploration activities include the acquisition of approximately 800-1000 line kmof 2D seismic survey in the Fatehjang block. The seismic data acquisition will be carriedout using a combination of vibroseis and dynamite technologies. The 2D seismic operation isestimated to span over a period of 4 months.This EIA study identifies and makes assessment of the impacts likely to arise from the seismicand drilling activities in Fatehjang BlockDescription of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 32 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Euro Grand Park Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Nazimabad Block-1, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Euro Builders & Developers Seven (07) No. of Staff Months: Duration ofAddress: Assignment:Plot No.D-14, Block-F, Hydri, North Nazimabad, Karachi 12 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 5,494 Nov 2011 Dec 2011 Rs. 500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Dr. Iqbal Hashmi, Mr. Saquib Ejaz Hussain (Dy. ProjectManager/Environmentalist), Mr. Ejaz Hussain, Dr. Mansoor Imam (Urban Planner/EnvironmentalEngineer), Mr. Amir Aziz (Environmental Scientist)Narrative Description of Project:The proposed project is located in Block-1, Nazimabad and is Mixed Use Development Projectcovering an area of 2502 sq.yds. The project development will include site development works andconstruction of infrastructure including building structures, drains, sewers, and other utilities.Elevators, fire alarm and protection system, intercom system, generators, and amenities areas havebeen allocated to make the project more attractive.Initial Environmental Examination (IEE) of proposed project: ‘Euro Grand Park’ has been carried outin compliance with the mandatory requirements of Section 12 of Pakistan Environmental ProtectionAct (PEPA) 1997 and Pakistan Environmental Protection Agency (PEPA) Review of IEE/EIARegulations 2000.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 33 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed Residential Pakistan& Commercial Building Project COM-3 Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Clifton, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Ishaq Enterprises Nine (09)Address: No. of Staff Months: DurationSuite No. 101-Fortune Centre, Shahrah-e-Faisal, PECHS of Assignment:Block-6, Karachi 16 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 3,296 Oct 2011 Nov 2011 Rs. 300,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Mr. Saquib Ejaz Hussain (Dy. Project Manager/Environmentalist), Dr. MansoorImam (Urban Planner/Environmental Engineer), Dr. Shahid Alam (Structural Engineer), Mr. AsharHashmat Lodi (Transport Engineer), Dr. Badar Munir Ghauri (Air Quality Expert), Ms. SamreenSiddiqui (Environmental Scientist), Mr. Muhammad Haseeb (Environmental Scientist)Narrative Description of Project:“COM-3” is an Urban Development Project comprising two 32 storeys Residential cumCommercial Towers being established over an area of 9689 square yards of a commercial plotlocated at the edge of Khayaban-e- Saadi and Khayaban-e-Ghalib adjoining at Bilawal Chowrangiin Block-6 KDA Scheme No. 05 of Clifton Karachi. Administratively the area falls in Saddar Townof defunct CDGK.Initial Environmental Examination (IEE) of proposed project: ‘COM-3’ has been carried out incompliance with the mandatory requirements of Section 12 of Pakistan Environmental ProtectionAct (PEPA) 1997 and Pakistan Environmental Protection Agency (PEPA) Review of IEE/EIARegulations 2000.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 34 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination Study for Construction & PakistanOperation of Al Ghafoor Chalet Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):PECHS, Block-2, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Zuhair Builders Six (06) No. of Staff Months: DurationAddress: of Assignment:Plot No. 26/1, Block-A, Nazimabad No.1, Karachi 10 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 3,846 Oct 2011 Nov 2011 Rs. 350,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/SeniorEnvironmentalist), Mr. Saquib Ejaz Hussain (Dy. Project Manager/Environmentalist), Ms. ZulekhaSoorma (HSE Advisor), Dr. Mansoor Imam (Urban Planner/Environmental Engineer), Mr. Amir Aziz(Environmental Scientist)Narrative Description of Project:The proposed project is located in PECHS Block-2 comprising of an eight storey tower with a 04 & 05room super executive apartment accentuated by its gorgeous elevation and evitable location. Theproject covers an area of 438 sq. yds. The project development will include site development worksand construction of infrastructure including building structures, drains, sewers and other utilities.Elevators, fire alarm and protection system, intercom system, Wi-fi Internet System, CCTVsurveillance system, generators and amenities areas have been allocated to make the project moreattractive.Initial Environmental Examination (IEE) of proposed project: ‘Al Ghafoor Chalet’ has been carried outin compliance with the mandatory requirements of Section 12 of Pakistan Environmental ProtectionAct (PEPA) 1997 and Pakistan Environmental Protection Agency (PEPA) Review of IEE/EIARegulations 2000Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 35 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Study for Seismic PakistanSurvey Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Baran Block Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Oil & Gas Investments Ltd (OGIL) Seven (07)Address: No. of Staff Months: Duration of508, 5th Floor, Continental Trade Centre Block-8, Assignment:Clifton, Karachi 43 Staff Months, Seven (07) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 9,890 Apr 2011 Oct 2011 Rs. 900,000/-Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Saquib Ejaz Hussain (Dy. Project Manager/EIA Specialist),Dr. Mirza Arshad Ali Beg (Team Leader/Principal Environmental Expert), Dr. Badar Munir Ghauri(Air Quality Management Expert), Dr. Viqar Hussain (Senior Geologist), Dr. Mansoor Imam(Waste Management Expert), Dr. Asad Ghufran Ecologist/Wildlife Expert),Narrative Description of Project:The proposed exploration activities include the acquisition of approximately 400 line km of 2Dand 100 sq. km of 3D seismic survey in the Baran block. The seismic data acquisition will becarried out using a combination of vibroseis and dynamite technologies. The 2D and 3D seismicoperation is estimated to span over a period of 4 months for both 2D and 3D seismic surveys.This EIA study identifies and makes assessment of the impacts likely to arise from the seismicand drilling activities in Baran Block.Description of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 36 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of New Power House Pakistan Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):West Wharf, Karachi Port, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Karachi International Container Terminal Limited (KICTL) Six (06)Address: No. of Staff Months: Duration ofAdministration Building, Berth No. 28-30, Dockyard Road, Assignment:West Wharf, Karachi 15 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 2,747 Aug 2011 Oct 2011 Rs. 250,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Mr. Saquib Ejaz Hussain (Dy. ProjectManager/Environmentalist), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Dr.Badar Munir Ghauri (Air Quality Expert), Ms. Zulekha Soorma (HSE Advisor), Mr. Shakil A. ShaikhNarrative Description of Project:The proposed project comprises of construction of a new powerhouse at Karachi InternationalContainer Terminal (KICT). This will include installation of eight Diesel Engine driven generatorsafter removal from the Container Quay Cranes. All the generating sets will run in parallel supportedby a control/synchronizing system. Requisite equipment like switch gears/step up/downtransformers will also be installed. Power supply cables will be laid up to each Quay Crane (QC). Atotal of 8 nos. of Caterpillar engines which shall be removed from the cranes and relocated in thepowerhouse, will have a power generation capacity of 11.8 MW. The area of the proposedpowerhouse is 60m x 10.2m (612 sq. m) which will be located inside the Terminal near theEngineer Building. The estimated capita cost of the project is US$ 2.7m.Initial Environmental Examination (IEE) of proposed project: Construction and Operation of NewPower House at Karachi International Container Terminal (KICT) has been carried out incompliance with the mandatory requirements of Section 12 of Pakistan Environmental ProtectionAct (PEPA) 1997.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 37 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Smelting Plant Pakistan Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:H.M. Ilyas Traders Eight (08)Address: No. of Staff Months: Duration ofPlot No. 6-C, 2nd Floor, 33rd Street, Phase-V, Defence Assignment:Housing Authority, Karachi 23 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 3,296 Jul 2011 Sep 2011 Rs. 300,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed: Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader/Senior Environmentalist), Mr. Saquib Ejaz Hussain (Dy. Project Manager/Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. Badar Ghauri (Air Quality Expert), Mr. S .M. Zaman (Geo-technical Expert), Mr. Amir Aziz (Environmental Scientist), Ms. Noor Fatima (Environmentalist)Narrative Description of Project:The project includes setting up a smelting plant in PQ Karachi. The smelting cycle in the rotaryfurnace includes following sequence: Preheating of the Rotary furnace to 1100oC to 1200oC. Feed of the charge mix into the furnace with Furnace charging machine in 25-30min. Rotation of the furnace at speed of 1 to 1.5 RPM Burning of organic materials at 60-90oC. Drying of charge at 120oC to 150oC. Melting of metallic lead at 327oC. Reduction of lead oxides and lead sulphate with reducing agents at 650 oC to 1200 oC. Formation of liquid Lead Bullion. Formation of a liquid slag. Discharge of liquid lead through discharge port at periphery of furnace. Discharge of slag.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 38 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental & Social Impact Assessment of Coal PakistanClinker & Cement Terminal Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Pakistan International Bulk Terminal (PIBT) Eight (08)Address: No. of Staff Months: Duration of2nd Floor, Business Plaza, Mumtaz Hassan Road, Assignment:Karachi Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. Dec 2010 Mar 2011 Rs. 2,000,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmentalist),Mr. Saquib Ejaz Hussain (Project Coordinator & Environmentalist), Dr. Mansoor Imam (WasteManagement Expert), Dr. Badar Ghauri (Air Quality Expert), Mr. S.M. Zaman (Geo-technicalExpert), Ms. Zulekha Soorma (HSE Advisor), Ms. Noor Fatima (Environmental Scientist)Narrative Description of Project:In a two phase development, PIBT will build capacity for handling up to 4 million tons perannum of coal, cement and clinker in Phase I development. Handling capacity at additional 4million tons will be developed in Phase II. At the end of Phase II, the terminal handlingcapacity will be 8 million tons per annum which can further be enhanced to 12 million tonsper annum in future. the total estimated cost of development in Phase I and II is estimatedto be 140 million USD.As the project involves financial support by International Finance Corporation (IFC) thus theESIA study gratifies the evaluation criteria of the funding body. Also all applicable national &International guidelines and regulations have been used as a reference in preparing thisESIA.Description of Actual Services Provided by Your Staff:The ESIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 39 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Maru-Reti Gas PakistanPipeline Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Gotki, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Oil & Gas Development Company Ltd Nine (09) No. of Staff Months: Duration ofAddress: Assignment:OGDCL House, Jinnah Avenue, Islamabad 31 Staff-Months, Four (04) Months Approx. Value of Services (In Start Date Completion Date Current US$ &Rs.) (Month/Year) (Month/Year) US$. 3,488 Feb 2011 May 2011 Rs. 300,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Expert),Dr. Shahid Amjad (Wildlife Expert), Dr. Mansoor Imam (Waste Management Expert), DrBadar Munir Ghauri (Air Quality Management Expert), S.M. Zaman (Senior Geologist),Khurram Shams Khan (Socio-Economic Expert), Syed Mustafa Matloob (Environmentalist),Amir Aziz (Environmentalist)Narrative Description of Project:Maru-Reti Gas Field is located in the Northern Sindh Province, 7 km South of Ubaro. OGDCLintends to lay a gas pipeline between Maru Reti gas wells to existing Guddu Power Plant gassupply line for onward supply to Guddu Pipeline.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 40 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Sumya Residency Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Shaheed-e-Millat Road, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Hiba Builders & Developers Eight (08)Address: No. of Staff Months: Duration of6-7, Ground Floor, 64/3, C.P.Berar Society, Sharafabad, Assignment:Karachi 14 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 5,494 Jul 2011 Aug 2011 Rs. 500,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmentalist), Mr.Saquib Ejaz Hussain (Project Coordinator & Environmentalist), Dr. Mansoor Imam (WasteManagement Expert), Dr. Badar Ghauri (Air Quality Expert), Mr. S.M. Zaman (Geo-technicalExpert), Ms. Zulekha Soorma (HSE Advisor), Ms. Noor Fatima (Environmental Scientist)Narrative Description of Project:The Sumya Residency is a 14 storeys residential development consisting of 52 apartments offeredin 6 categories. It offers 2, & 4 Bedrooms Super Luxury Apartments. The features and design arein accordance with the requirements of modern day living and creative use of technology such ashome automation and internet facility. The project is ideally located for family living with easyaccess to schools, hospitals, parks, shopping 3centres and restaurants for a modern lifestyle. Theunique modern design with provision of large LCD screens for product advertisement makes thisbuilding a landmark location in the area which will be easily identifiable to guests of the residents.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 41 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Euro Clock Tower Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):North Nazimabad, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Euro Builders & Developers Nine (09) No. of Staff Months: Duration ofAddress: Assignment:Plot No. D-14, Block-F, Hydri, North Nazimabad, Karachi 23 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Completion Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 7,692 Jul 2011 Sep 2011 Rs. 700,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr. Syed Nadeem Arif (Project Director), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Mr. Saquib Ejaz Hussain (Project Coordinator & Environmentalist) , Dr. Mansoor Imam Dr. BadarMunir Ghauri (Air Quality Expert), Dr. Shahid Alam (Senior Structural Engineer), Mr. Ashar HashmatLodi (Transportation Engineer), Mr. Amir Aziz, Ms. Noor FatimaNarrative Description of Project:The proposed Euro Clock Tower (ECT) project comprises of shops and residential flats shall belocated in North Nazimabad, Karachi, The project aims at providing a landmark to the skyline in thecommercial and residential sector of North Nazimabad. Euro Clock Tower is a 9 storeys residentialdevelopment consisting of 63 apartments offered in 5 categories. Building height is 146 ft aboveground level. The project is ideally located for family living with nearby access to schools, hospitals,parks, shopping malls and restaurants for an ideal family lifestyle.Description of Actual Services Provided byYour Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 42 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Social Impact Assessment (SIA) for Karachi PakistanTransportation Improvement Project (SOSE). Professional Staff Provided by YourLocation within Country: Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Nippon Koei Co. Ltd of Japan Ten (10) No. of Staff-Months; Duration ofAddress: Assignment:Parsa Tower, Shahrae Faisal, Karachi 56 Staff-Months, Seven (07) Months Approx. Value of Services (in Start Date Completion Date Current US$ &Rs.): (Month/Year) (Month/Year) US$. 124,426 Jan 2011 JuL 2011 Rs. 10,700,700Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed NadeemArif (Project Director), Dr. MirzaArshad Ali Beg (Advisor on Social ImpactAssessment), SaquibEjazHussain (Project Coordinator), Dr. Mansoor Imam (Urban PlanningExpert), Khurram Shams Khan (Team Supervisor), Akhtar Abdul Hai (DevelopmentEconomist), MushtaqMirani (Sociologist), Tauseef Latif (Development Anthropologist),Mohammad Tayyab (Transport Planner), Noor Fatima (Meeting Organizer)Narrative Description of Project:The Study for Karachi Transportation Improvement Project (KTIP) has proposed 1) the 18 kmlong Radial Corridor 01 to start from Guru Mandir and to conclude at Surjani, 2) the 14.5 kmlong Circular Corridor 2 to start from Singer Chowrangi and end at NaganChowrangi, 3) the15.5 km long Radial Corridor 3 to begin from Guru Mandir and end at Saforah Goth, 4) the14.5 km long Circular Corridor 4 to start from Cantt Station and terminate at SingerChowrangi, while 5) the 16.5 km long Radial Corridor 6 to operate between Tower and NewSabziMandi.The Study has offered the following four systems for public consideration: Bus Rapid Transit (BRT), Light Rail Transit (LRT) Mono Rail Transit and Metro Rail Transit (MRT).The Karachi Transportation Improvement Project is in line with several national, provincial,and local policy frameworks that highlight the need for enhancing Karachi’s urban transportnetwork.Description of Actual Services Providedby Your Staff:Scope of the project works is as follows: Review of Guiding Principles Stakeholder Consultation Key Informants Survey Baseline Survey & Analysis  Develop Socio–economic profile of each corridor  Evaluate the issues related to the Resettlement and Rehabilitation of the affected population Socioeconomic Impact Analysis 43 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed Transplant PakistanTower Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Saddar Town, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Sindh Institute of Urology and Transplantation (SIUT) Eight (08)Address: No. of Staff-Months; Duration ofYaqoob Khan Road, Behind Civil Hospital Saddar Town, Assignment:Karachi 13 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,360 Apr 2011 May 2011 Rs. 375,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (senior Environmental Specialist), Dr.Shahid Alam (Structural Engineer), Dr. Mansoor Imam Waste Management Expert), Ashar HashmatLodi (Ttransport Expert), Mushtaq Mirani (Socio-economic Expert), Syed Mustafa Matloob(Environmental Scientist), Amir Aziz (Environmentalist)Narrative Description of Project:This public health project will be located on Yaqub Khan Road. The proposed SIUT TransplantTower will be treating all transplant patients under one roof and comprises of transplant surgeryward, laboratory, radiology and will also accommodate patients suffering from other diseases. Theproposed tower would be connected with the existing Dewan Farooq Medical Centre (DFMC).Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 44 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed 3 D Seismic PakistanOperations in Tando Ghulam Ali (TGA) & Buzdar Regions Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Badin Concession Area Environmentalists, Engineers and other specialistsName of Client: No. of Staff:BP Pakistan Exploration & Production Inc. Eight (08) No. of Staff-Months; DurationAddress: of Assignment:4th, Floor, Bahria Complex-1, 24- M. T. Khan Road, Karachi 22 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 3,488 Feb 2011 Apr 2011 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Dr. Shahid Amjad (Wildlife Expert), Dr. Mansoor Imam (Waste Management Expert), Dr BadarMunir Ghauri (Air Quality Management Expert), Dr. Viqar Hussain (Senior Geologist), MushtaqMirani (Socio-Economic Expert), Syed Mustafa Matloob (Environmental Expert)Narrative Description of Project:Proposed seismic survey is use to produce a three-dimensional (3D) map of the subsurfacegeological structures so potential locations for oil and gas production wells can be identified withgreater accuracy.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 45 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Compact Steel Plant Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Abbas Steel Group (Pvt) Ltd Eight (08) No. of Staff-Months; Duration ofAddress: Assignment: , Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. Dec 2010 Apr 2011 Rs.Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Saquib Ejaz Hussain (Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. BadarGhauri (Air Quality Management Expert), Sultan Mehmood Zaman (Senior Geologist), MushtaqMirani (Socio-Economic Expert). Ms. Zulekha Soorma (HSE Advisor)Narrative Description of Project:The proposed project is of an integrated steel making plant to produce cast billets by recyclingprocess using induction furnaces for melting scrap. The process of producing liquid steel is suchthat it helps refine the tapped heat from the Induction Furnace. The secondary refining of liquidsteel will be done at ladle furnace before sending it to Continuous Casting Machine to cast thebillets.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 46 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Proposed 11.7 MW Pakistan(Extendable to 16 MW) Gas based Power Plant Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Nooriabad, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Anoud Power Generation Ltd Eight (08)Address: No. of Staff-Months; Duration ofPlot No. 7-B/1, Adjacent to National Refinery Ltd, Korangi Assignment:Industrial Area, Karachi 13 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$.1,860 Mar 2011 Apr 2011 Rs. 160,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Saquib Ejaz Hussain (Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. BadarGhauri (Air Quality Management Expert), Sultan Mehmood Zaman (Senior Geologist), MushtaqMirani (Socio-Economic Expert). Ms. Zulekha Soorma (HSE Advisor)Narrative Description of Project:The project comprises of construction, installation and operational stages of 11.7 MW (extendableto 16 MW) gas based power plant with waste heat recovery boilers (WHRB) and installation ofsteam turbine to produce additional electricityDescription of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 47 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Sundar Gas LPG PakistanStorage & Filling Station Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Sundar Gas (Pvt) Ltd Ten (10) No. of Staff-Months; Duration ofAddress: Assignment:Korangi Industrial Area, Karachi 16 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 2,051 Dec 2010 Jan 2011 Rs. 175,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Saquib Ejaz Hussain (Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. BadarGhauri (Air Quality Management Expert), Dr. Shahid Alam (Structural Engineer), Ashar HashmatLodi (Transport Engineer), Sultan Mehmood Zaman (Senior Geologist), Kaneez Fatima (Sociologist),Noor Fatima (Environmental Scientist)Narrative Description of Project:The proposed site for the Sundar Gas LPG storage and filling facility is located in the LPGdesignated area at Plot F-01, NorthWest Industrial Zone of Port Qasim. The total area of the plantis 8090 sq.m. Keeping in view the present scenario and demand, Sundar Gas has planned todevelop a storage facility of 120metric tons which will be increased to 170 metric tons.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 48 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Capacity Enhancement Pakistan& GMP Compliance Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Mauripur Road, SITE, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Reckitt Benckiser Pakistan Ltd Seven (07) No. of Staff-Months; Duration ofAddress: Assignment:Plot No. F-18, Mauripur Road, SITE, Karachi 17 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,186 Feb 2011 Apr 2011 Rs. 360,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmentalist), SaquibEjaz Hussain (Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. Badar Ghauri(Air Quality Management Expert), Ms. Zulekha Soorma (HSE Advisor), Faisal Mustafa (ProjectCoordinator)Narrative Description of Project:The project has been undertaken as a part of Reckitt Benckiser’s Capacity Enhancement and GMPCompliance Project, comprising of addition of in-house production and packing of Harpic and MPC(Multi-Purpose Cleaner), capacity enhancement of Veet Cream and upgrade of Disprin area tomeet GMP compliance requirementsDescription of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 49 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Naya Nazimabad PakistanHousing Scheme Phase-I Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Gadap Town Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Jawedan Cement Ltd Ten (10) No. of Staff-Months; Duration ofAddress: Assignment:Arif Habib Centre, 23- M.T. Khan Road, Karachi 55 Staff-Months, Six (06) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 11,723 Oct 2010 Mar 2011 Rs. 1,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmentalist), SaquibEjaz Hussain (Environmentalist), Dr. Mansoor Imam (Urban Planner), Dr. Badar Ghauri (Air QualityExpert), Dr. Shahid Alam (Structural Engineer), Ashar Hashmat Lodi (Transport Expert), SultanMehmood Zaman (Geotechnical), Kaneez Fatima (Socio-economic Expert), Noor Fatima(Environmental Scientist)Narrative Description of Project:The proposed Naya Nazimabad Housing Scheme (NNHS) is a multiuse project which includesresidential plots for houses, large plots for flats, commercial areas and other amenities includinghealth facility, praying areas, grave yard, schools, colleges, university and some open and greenareas. Build up area required for the proposed housing scheme will be about 1,238 acres. Majorportion of the proposed site for NNHS is located in Gadap town while its minor portion is located inOrangi town of Karachi city. Initially 372 acres of land (Zone-1) will be developed in the first phaseand the remaining land (Zone 2 to Zone-4) will be developed in the remaining phases of theproject.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 50 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Drilling & Associated PakistanProduction Activities in Hala Block Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Mirpurkhas Block, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:BP Pakistan Exploration & Production Inc. Eight (08) No. of Staff-Months; Duration ofAddress: Assignment:4th Floor, Bahria Complex-1, 24- M. T. Khan Road, Karachi 30 Staff-Months, Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 14,067 Jun 2010 Oct 2010 Rs. 1,200,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Saquib Ejaz Hussain (Environmentalist), Dr. Mansoor Imam (Waste Management Expert), Dr. BadarGhauri (Air Quality Management Expert), Dr. Viqar Hussain (Senior Geologist), Khurram ShamsKhan (Socio-economic Expert)Narrative Description of Project:The proposed project (Drilling & Associated Activities) will be carried out in Hala Game Reservewhich is located in Mirpurkhas Block. The project area for which the study has been performedcovers about 9.538 km2.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 51 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental & Social Impact Assessment of LNG Terminal Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Engro Vopak Terminal Ltd Twelve (12) No. of Staff-Months; Duration ofAddress: st Assignment:1 Floor, Bahria Complex-I, 24-MT Khan Road, Karachi 88 Staff-Months, Eight (08) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 19,929 Jun 2010 Jan 2011 Rs.1,700,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Specialist),Dr. Iqbal Ali (Senior Hydrologist), Saquib Ejaz Hussain (Environmentalst), Dr. Shahid Amjad(Wildlife Expert), Dr. Mansoor Imam (Waste Management Expert), Dr. Badar Ghauri(Air QualityManagement Expert), S.M. Zaman (Senior Geologist), Zulekha Soorma (HSE Advisor), KaneezFatima (Socio-economic Expert), Noor Fatima (Environmental Scientist), Samreen Siddiqui(Environmental Scientist)Narrative Description of Project:The project is intended to provide facilities for receiving supplies of liquified natural gas (LNG) viaconventional LNG carrier (LNGC), for offloading and dockside transfer to an FSRA. The re-gasifiedliquefied natural gas (RLNG) will be delivered via a jetty and onshore facilities to the gas networksoperated by SSGC (underground/overhead connection to the pipeline proposed by SSGC forMASHAL Project, off take, approximately 2 to 3 km in length)Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Identification of likely impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure Development of Environmental Management and monitoring plan 52 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Housing Society Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Gulshan Iqbal, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:KDA Officers Cooperative Housing Society Seven (7)Address: No. of Staff-Months; Duration ofSt-19, Block-A, KDA Officer Cooperative Housing Society Ltd, Assignment:Karachi 19 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 2,637 Oct 2010 Dec 2010 Rs. 225,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Saquib Ejaz Hussain (Environmental Expert), Dr. Mansoor Imam (Urban Development Expert),Samreen Siddiqui (Environmental Scientist), Noor Fatima (Environmental Scientist), Faisal Mustafa(Project Coordinator)Narrative Description of Project:The site of the proposed KDA Officers Society comprises a 5.46 acres vacant plot in Gulshan-e-IqbalTown behind National Stadium. The proposed housing scheme will be developed within the existingboundaries of KDA OCHS. The project site is surrounded by other Urban settlements.Description of Actual Services Provided by Your Staff:The IEE study was conducted by Environmental Management Consultants (EMC) to provide SEPAand other relevant agencies all the necessary information pertaining to social and environmentalimpacts of construction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 53 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Generation’s School Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Site Area Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Generation School Eight (8) No. of Staff-Months; Duration ofAddress: Assignment:F-100, Block-B, North Nazimabad, Karachi 23 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 4,628 Aug 2010 Oct 2010 Rs 395,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Saquib Ejaz Hussain (Environmental Expert), Dr. Shahid Alam (Structural Engineer), Dr. MansoorImam (Urban Development Expert), Ashar Lodhi (Transport Expert), Muhammad Haseeb(Environmentalist), Samreen Siddiqui (Environmental Scientist)Narrative Description of Project:The proposed South Campus of Generation’s School shall be constructed in South Avenue SITE,Industrial Area, Karachi having an area of 5.81 acres.The project comprises of Standard Classrooms. Libraries, Labs, Office Block, Playground and InsideCar ParkingDescription of Actual Services Provided by Your Staff:Initial Environmental Examination (IEE) has been carried out to provide all necessary information onpotential environmental and social impacts at the school; an IEE document has been prepared tomeet the legislative requirement of Pakistan Environmental Protection Act 1997. All options forimpact mitigation and management for the construction and operation phase of the treatment plantwere explored and suitable recommendations were given 54 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Central Tower PakistanResidential cum Commercial Project Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Clifton, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Central Builders & Developers Nine (09) No. of Staff-Months; Duration ofAddress: Assignment:3 – Main Shahrah-e-Faisal, Karachi 24 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 4,220 Jun 2011 Aug 2011 Rs 360,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Saquib Ejaz Hussain (Environmental Expert), Dr. Mansoor Imam (Urban Planner), Dr. Badar MunirGhauri (Air Quality Management Expert), Dr Shahid Amjad (Wildlife Expert), Dr. Viqar Hussain(Senior Geologist), Sultan Mehmood Zaman (Geotechnical Expert), Samreen Siddiqui(Environmental Scientist)Narrative Description of Project:Central tower is proposed to have a 15 storey residential cum commercial tower on 2133.33 sq.ydsarea on plot # F-96 Block 7 KDA Scheme #5 Clifton, Karachi. According to the approved plan, theBasement, Ground and First Floor would be reserved for car parking, while the sixth floor tofourteen floor shall accommodate apartments.Description of Actual Services Provided byYour Staff:The EIA study was conducted by EnvironmentalManagement Consultants (EMC) to provide SEPAand other relevant agencies all the necessaryinformation pertaining to social andenvironmental impacts of construction andoperation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 55 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Lucky One, PakistanApartment & Shopping Mall Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Plot LA-2/B, Federal B Area, Rashid Minhas Road Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Lucky One (Pvt) Ltd Nine (9) No. of Staff-Months; DurationAddress: of Assignment:Federal B Area, Karachi 46 Staff-Months, Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 20,349 Apr 2010 Aug 2010 Rs. 1,750,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal EnvironmentalExpert), Saquib Ejaz Hussain (Environmental Expert), Dr. Mansoor Imam (Urban Planner), Dr.Badar Munir Ghauri (Air Quality Management Expert), Sultan Mehmood Zaman (GeotechnicalExpert). Dr Shahid Amjad (Wildlife Expert), Dr. Viqar Hussain (Senior Geologist), SamreenSiddiqui (Environmental Scientist), Haseeb Zaman (Environmentalist)Narrative Description of Project:Lucky One is an Urban Development Project comprising A Mall & Apartments being establishedover an area of 15 acres at the present site of Fazal Textile Mills Limited, on Rashid MinhasRoad in Federal B Industrial Area, Karachi. Lucky One will include 1500 large size apartments,which will attract a permanent population of approximately 9000-10,000 people. Convenientlysituated on the prime location of Central Karachi, at Fazal Mill Roundabout, the apartments areeasily accessible through major flyovers of Karachi.Description of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provideSEPA and other relevant agencies all the necessary information pertaining to social andenvironmental impacts of construction and operation of the project. The methodology of thestudy includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 56 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Environmental Impact Assessment of Country:Noman Castello, Office Tower Project Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Noman Builders & Developers 10Address: No. of Staff-Months; Duration1st Floor, Al-Samad Tower, Plot No. SB-33, Block 13-B, Main of Assignment:University Road, Gulshan-e-Iqbal, Karachi. 37 Staff Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) Rs.375,000 May 2010 Aug 2010 US$ 4,360Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Mirza Arshad Ali Beg, Saquib Ejaz Hussain, Mr. Khurram Shams Khan, Dr. MansoorImam, Dr. Shahid Alam, Ashar Hashmat Lodi, Dr. Badar Munir Ghauri, Samreen Siddiqui, Mr. Sultan MehmoodZaman.Narrative Description of Project:The Project comprises construction of a 20 storey tower over 100495.48 Sq. ft covered area(presently a residential bungalow) at Khayaban-e- Saadi, Clifton Karachi; to provide a prime officespace for national and multinational companies.Description of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provide SEPAand other relevant agencies all the necessary information pertaining to social and environmentalimpacts of construction and operation of the project. The methodology of the study includes:  Site visits  Baseline survey  Review of relevant legislations  Evaluation of all activities carried out during construction and post construction phases.  Analysis of social impacts  Development of Environmental Management and monitoring plan 57 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Initial Environmental Examination of Dalton Parking Plaza, Country:Shopping Mall & Upgradation of Zamzama Club & Sports PakistanComplex Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Defence Housing Authority (DHA) Nine (9) No. of Staff-Months; DurationAddress: of Assignment:2-B, East Street, Phase-I, Karachi 37 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$ 6,918 Mar 2010 Jun 2010 Rs. 595,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Saquib Ejaz Hussain (Environmental Expert), Dr. Mansoor Imam (Waste Management Expert), Dr.Badar Munir Ghauri (Air Quality Management Expert), Dr Shahid Alam (Structural Engineer), Dr.Viqar Hussain (Senior Geologist), Mushtaq Mirani (Socio-economic Expert), Samreen Siddiqui(Environmental Scientist), Shahla Ijtaba (Environmental Engineer),Narrative Description of Project:DHA has, in launching on the Project: “Construction of Dalton Parking Plaza, Shopping Mall &Upgradation of Zamzama Club & Sports Complex” on Approx 100,000 m2 aims to: Restore the status of the site as a large state of the art recreation complex; the site was underused as sports ground and was home to Zamzama Club Fulfill its commitment to social responsibility by proactively promoting public interest, and Respond to the goals of sustainability by promoting sustainable development and a better quality of life for everyone.Description of Actual Services Provided by Your Staff:The IEE study was conducted by Environmental Management Consultants (EMC) to provide SEPAand other relevant agencies all the necessary information pertaining to social and environmentalimpacts of construction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 58 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Corridor-IV Pakistan Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Shahrah-e-Faisal, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:City District Government Karachi Eight (08) No. of Staff Months: Duration ofAddress: th Assignment:4 Floor Civic Centre, Karachi 14 Staff Months, Two (02) Months Approx. Value of Services (In Start Date Start Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 13,953 Nov 2009 Dec 2009 Rs.1,200,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Director), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr.Shahid Alam (Senior Structural Engineer), Dr. Badar Munir Ghauri (Air Quality Expert), Ashar HashmatLodi (Transportation Engineer), Saquib Ejaz Hussain (Project Coordinator & Environmentalist), ShahlaIjtaba (Environmental Engineer), Samreen Siddiqui (Project Coordinator & Environmentalist)Narrative Description of Project:Construction of eight flyovers at designated intersections on Corridor IV Shahrah-e-Faisal Karachi hasbeen produced in compliance with the requirement of Section 12 of Pakistan Environmental ProtectionAct (PEPA) 1997. Section 12 of PEPA directs that an initial environmental examination (IEE) or wherethe project is likely to cause an adverse effect, an environmental impact assessment (EIA) be filed withthe Agency or Department, which has been given delegated authority for environmental assessment,for review and approval of project.Corridor IV is part of the overall scheme of improvement of road network and construction of newflyovers in Karachi, the largest city of Pakistan and the capital of province of SindhDescription of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provide SEPA andother relevant agencies all the necessary information pertaining to social and environmental impacts ofconstruction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 59 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Special Assistance for the Project Formulation (SAPROF) Country:for Implementation of Karachi Circular Railway (KCR) PakistanProject: Framework for Resettlement Action Plan (RAP) Professional Staff Provided byLocation within Country: the Firm/Entity (Profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Nippon Koei of Japan Eight (08)Address: No. of Staff Months: Duration ofOff. No. 409, 4th Floor, Parsa Tower, Shahrah-e-Faisal, Assignment:Karachi 52 Staff-Months, Seven (07) Months Approx. Value of Services (In Start Date Start Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 216,558 Mar 2009 Sep 2009 Rs. 18,623,995Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Nil Consultants: NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Director), M. Rashid Siddiqui (Project Coordinator), Saquib Ejaz Hussain(PCM Coordinator), Dr. Akhtar Hai (Economic Advisor), Dr. Mansoor Imam (Urban DevelopmentSpecialist), Dr. Mirza Arshad Ali Beg (Senior Socio-Environmental Expert), Mushtaq Mirani (SeniorSocio-Economic Expert), Kaneez Fatima (Senior Sociologist), Safia Minhaj (Data Acquisition Expert)Sultan Mehmood Zaman (Socio-Economic Survey Coordinator).Narrative Description of Project:The Government of Japan was interested in sponsoring a Mega project focusing of a commuter RailSystem in Karachi called Karachi Circular Railway (KCR) Project. The project involved Designing andConducting extensive field surveys focusing on development of Binary Logit models for variousmodes of transport being used by various people in Karachi. This eventually resulted in developingFare Based Modal Share Model. Potential diversion to KCR under various fare scenarios wereestimated using this model.Description of Actual Services Provided by Your Staff:This framework of RAP aims at setting up broad guidelines for the formulation and implementationof RAP by KUTC as a project proponents as per JICA Guidelines for the Environment and SocialConsiderations of April 2002. The land required for Karachi Circular Railway Project (KCR) is for apublic use and that shall be owned and administer by Pakistan Railway. In places within the right ofway, there are large clusters of households that shall be requiring relocation. In view of this,relocation and resettlement of the PAPs, a large majority is in squatters. It is therefore necessarythat socioeconomic considerations should be made in context to mitigation suggested in variousaspects of the project. In places where new railway line and road-over bridges are constructed,land acquisition and consequent displacement of the title holders should also disrupt the presentsocioeconomic condition. 60 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Bulk Oil Storage Facility Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):District Shikarpur, Sindh Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Hascombe Storage Ltd. Five (05)Address: No. of Staff-Months; DurationThe Forum”, 1st Floor, Suite No. 105-106, G-20, Khayaban-e- of Assignment:Jami, Block-9, Clifton, Karachi 15 Staff Months, Three Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. Sep 2009 Dec 2009 Rs. 300,000/-Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader), Saquib Ejaz Hussain(Environmental Expert), Shahla Ijtaba (Environmental Engineer), Rashid Siddiqui (EnvironmentalEngineer)Narrative Description of Project:Hascombe Storage Limited plans to launch the project of setting up a Bulk Oil Storage Facility atDistrict Shikarpur to facilitate the increasing demand of petroleum products in the country byspeedily supplying the products in the target markets within reach through accessible roads usingfast transport servicesDescription of Actual Services Provided by Your Staff:The IEE study was conducted by Environmental Management Consultants (EMC) to provide SEPAand other relevant agencies all the necessary information pertaining to social and environmentalimpacts of construction and operation of the project. The methodology of the study includes:  Site visits  Baseline survey  Review of relevant legislations  Evaluation of all activities carried out during construction and post construction phases.  Analysis of social impacts  Development of Environmental Management and monitoring plan 61 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for Construction of PakistanCentrepoint (Formerly Trakker Tower) Professional Staff Provided by theLocation within Country: Firm/Entity (Profiles):Korangi, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:A&A Associates Eight (08) Total No. of staff-months of theAddress: duration of assignment:39-K, Block 6, P.E.C.H.S. Karachi-75400 22 Staff Months, Three (03) Months Approx. Value of Services (In Start Date Start Date Current US$ & Rs.) (Month/Year) (Month/Year) US$. 3,592 Jul 2009 Sep 2009 Rs. 300,000Name of Associated Consultants, If Any No. of Months of Professional Staff Provided by Associated Consultants: Nil NilName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert),Dr. Badar Munir Ghauri (Air Quality Expert), Dr. Mansoor Imam (Waste Management Expert), SaquibEjaz Hussain (Project Coordinator & Environmental Expert), Shahla Ijtaba (Environmental Engineer),Samreen Siddiqui (Environmental Scientist), Ahsanullah Soomro (Environmental Engineer)Narrative Description of Project:The Centrepoint Building comprises 3, 57,720 sq.ft of commercial space standing at a height of 492feet including the communication tower. It will comprise of office spaces, swimming area and parkinggarage. The project development will include site development works and construction ofinfrastructure including building structures, drains, sewers, wastewater treatment facility, landscapingof the area and other utilities. International standards of design in commercial building have beenadopted. High speed elevators, security system, rooftop swimming pools and amenities areas havebeen allocated to make the project more attractive.Description of Actual Services Provided by Your Staff:The IEE study was conducted by Environmental Management Consultants (EMC) to provide SEPA andother relevant agencies all the necessary information pertaining to social and environmental impacts ofconstruction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 62 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Nation-Wide Mapping of Industries to Analyze The PakistanRequirement of Combined Effluent Treatment Plants (CETPs) Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Islamabad Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Ministry of Textile Industries, Government of Pakistan Four (04) No. of Staff-Months; DurationAddress: nd of Assignment:G-5/2, 2 Floor FBC Building, Islamabad 196 Staff Months, 52 Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$.115,000 Nov 2008 Mar 2012 Rs. 9,200,000/-Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), M. Rashid Siddiqui (Project Coordinator), Shahla Ijtaba(Environmental Engineer), Saquib Ejaz Hussain (Environmental Expert)Narrative Description of Project:Ministry of Textile Industries (MINTEX), Government of Pakistan decided to initiate a nationwidemapping of the entire textile industry sector to identify and priorities future interventions andprepare a comprehensive policy on environmental compliance of the textile industries.The study, “Nationwide Mapping of Industries to Analyze the Requirement of EffluentTreatment Plants “has been prepared in order to fulfill the requirement of the ToR laid by theMinistry of Textile. This report will help out the Consultant and the Ministry of Textile towardsachieving their goal in the most effective manner.Description of Actual Services Provided by Your Staff: Mapping of all the textile mills in six major cities i.e. Karachi, Lahore, Faisalabad, Sialkot, Hub, Multan Preparation of feasibility report Suggestion of appropriate technology for Combined Effluent Treatment Plant 63 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Housing Society Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:KMC Officers Cooperative Housing Society Eight (08)Address: No. of Staff-Months; Duration of103-1st Floor, Al-Amin Towers, NIPA Chowrangi, Gulshan Iqbal, Assignment:Karachi 23 Staff Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 5,000 Apr 2009 Jun 2009 Rs. 400,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Dr. Iqbal Ali (Hydrologist), Dr. Shahid Alam (Structure Engineer), Saquib Ejaz Hussain (EnvironmentalExpert), Samreen Sidddiqui (Environmental Scientist), Ahsanullah Soomro (Environmental Engineer),Naheed Iqbal (Project Coordinator)Narrative Description of Project:The proposed project covers an area of 200 acres and has the potential to contribute towardsrevitalization of the housing sector and towards the economic development of the country and isproposed to be developed in compliance with Housing Guidelines of Pak-EPA laws as well as otherrelevant environmental legislations.Description of Actual Services Provided by Your Staff:The IEE study was conducted by Environmental Management Consultants (EMC) to provide SEPA andother relevant agencies all the necessary information pertaining to social and environmental impactsof construction and operation of the project. The methodology of the study includes: Site visits Baseline survey Review of relevant legislations Evaluation of all activities carried out during construction and post construction phases. Analysis of social impacts Development of Environmental Management and monitoring plan 64 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental and Social Impact Assessment of Gizri Flyover Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):DHA, Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Defence Housing Authority Eleven (11) No. of Staff-Months; Duration ofAddress: Assignment:2-B, East Street, Phase-I, Karachi 32 Staff Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 7,500 Mar 2009 May 2009 Rs. 600,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert),Ashar Lodi (Traffic Management Expert), Dr. Mansoor Imam (Solid Waste Expert), Dr. Badar MunirGhauri (Air Dispersion Modeling Expert), Dr. Shahid Alam (Bridge Structure Engineer), Shahid AliLutfi (Environmental Engineer), Mushtaq Mirani (Social Consideration Expert) Saquib Ejaz Hussain(Environmental Expert), Samreen Sidddiqui (Environmental Scientist), Shahla Ijtaba(Environmental Engineer)Narrative Description of Project:The Study “Transport Planning & Traffic Management Plan for DHA” revealed that approximately44000 vehicles enter/leave DHA from Submarine Intersection. All these vehicles pass throughGizri Commercial Area to approach Khayaban-e-Hafiz. Heavy traffic volume and encroachments inthe Gizri commercial area creates a chaos at this main entry / exist point.Due to the current traffic congestion problems, DHA started the construction of 1.2 km longflyover in Gizri commercial area, in order to solve the congestion problems.Description of Actual Services Provided by Your Staff:The EIA study was conducted by Environmental Management Consultants (EMC) to provide SEPA andother relevant agencies all the necessary information pertaining to social and environmental impactsof construction and operation of the project. The methodology of the study includes: Site visits Baseline survey Project Specific Acquisition Impact identification and Assessment Mitigation Measures Development of Environmental Management and monitoring plan 65 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Resettlement Action Plan (RAP) for Project Affected Persons Pakistan(PAPs) of Karachi Circular Railway (KCR) Revival Project Professional Staff Provided by YourLocation within Country: Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Karachi Urban Transport Corporation (KUTC) Nine (09) No. of Staff-Months; Duration ofAddress: Assignment:53-B, Rest Camp Road, Karachi Cantt. Karachi 205 Staff-Months, Twenty Seven (27) Months Approx. Value of Services (in Current Start Date Completion Date US$ & Rs.): (Month/Year) (Month/Year) US$. 420,056 May 2009 Aug 2011 Rs. 33,604,500Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated Consultants: NIL NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Director), Dr. Mirza Arshad Ali Beg (Senior Advisor on RAP), Saquib EjazHussain (Social Environment Expert & Project Coordinator), Dr. Akhtar Hai (Senior Economist), Dr.Mansoor Imam (Senior Expert on Urban Development), Safia Minhaj (Senior Economist), Mushtaq Mirani(Senior Sociologist), Kaneez Fatima (Sociologist), Sultan Mehmood Zaman (Meetings Organizer & FieldSurvey Supervisor), Nadeem Beg (Topographical Survey & Mapping Supervisor)Narrative Description of Project:This study pertains to social aspects of consultancy provided by Environmental Management Consultants(EMC) Pakistan in preparing this Resettlement Action Plan (RAP) of Project Affected Persons due to theproposed Revival of Karachi Circular Railway. Because of a large scale project like KCR Project funded byinternational funding agencies, and that it would involve resettlement of a large number of PAPs, a studyof comprehensive Resettlement Action Plan is mandatory. In this respect the World Banks "OperationalPolicy (OP) 4.12" has become a widely used instrument as policy for internationally funded projects. Thusthis RAP has been prepared based on this principle. Apart from OP 4.12, other policies and guidelines ofJICA, IFC & ADB were also considered and referenced while preparing this RAP.The socioeconomic survey of PAPs was an integral component of RAP Study. In all, 2997 (2696Residential & 301 Commercial) structures were surveyed out of 3320 structures, of which 4653 formswere filled in along the entire loop and the main PR line on the Karachi Circular Railway Right of Way(KCR-ROW). These include 4352 households & 301 shop / business operatorsDescription of Actual Services Provided by Your Staff:KUTC has awarded the contract for RAP-Study to Environmental Management Consultants (EMC). TheScope of work includes detailed land/demarcation survey (about 40 km KCR loop), Inventory/CensusSurvey of squatter families (around 8000 to 10,000 families) and developing the compensationmechanism through public/stakeholder consultation meetings. 66 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Revival of Karachi PakistanCircular Railway Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:Karachi Urban Transport Corporation Fourteen (14) No. of Staff-Months; Duration ofAddress: Assignment:53-B, Rest Camp Road, Karachi Cantt. Karachi 42 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 24,642 Oct 2008 Jan 2009 Rs. 19,80,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Director), Dr. Mirza Arshad Ali Beg (Team Leader & Senior EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Badar Munir Ghauri (Air Quality Expert), Dr. Viqar Hussain(Geologist), Mushtaq Mirani (Socio-economic Expert), Dr. Mansoor Imam (EIA Consultant), Shahid AliLutfi (Environmental Engineer), Saquib Ejaz Hussain (Project Coordinator & Environmental Expert),Satoshi Higashinakagawa (Environmental Expert), Shahla Ijtaba (Environmental Engineer), ShusukeMinato (Socioeconomic Expert), Sultan Mehmood Zaman (Geo-Technical Expert), Faisal Mustafa(Project Coordinator)Narrative Description of Project:Karachi Circular Railway (KCR) will be revived as a Modern Commuter System to meet the essentialtransportation need of the citizens of Karachi. The total route length of the dual tracks on the KarachiCircular Railway project stage-I & stage-II is 43.12 Km (Karachi city to Nipa: 22.86 Km and Nipa toKarachi City Station & along mainline: 20.26 Km) with 24 stations. Stage III Drigh road to JinnahAirport (6.1 Km) is itself a viable project and will be implemented after stabling initial operating periodof 7 years for stage I & II. This stage is neither included nor under consideration for the funding byJICA. 290 trains/day will be operated at 6 minutes headway in each direction with capacity of942/1391 passengers/train, 18840/30602 passengers/hour and 0.69 million passengers/day (As perSAPROF Study).Description of Actual Services Provided by Your Staff:The Environmental Impact Assessment (EIA) for KCR Revival Project has also been conducted by EMCin January 2009. The EIA report has been presented after undergoing and examining theenvironmental aspects upon screening the potential impacts to ensure that the proposed activitiespertaining to revival of KCR are environment friendly evaluated through an environmentalexamination carried out in accordance with applicable laws and regulations of Pakistan EnvironmentalProtection Act 1997. Sub-section 3 of Pakistan Environmental Protection Agency (Review of IEE andEIA) Regulations 2000 requires for Projects that need to submit an EIA 67 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Framework of Resettlement Action Plan (RAP) for Project Country:Affected Persons (PAPs) due to proposed Revival of Karachi PakistanCircular Railway Professional Staff Provided by Your Firm/Entity(profiles): Sociologists, Economists, DataLocation within Country: Acquisition Specialists, MassKarachi Communication Experts, Environmental Engineers and Environmental Scientists.Name of Client: No. of Staff:Karachi Urban Transport Corporation (KUTC) 12 (Experts), 70 (Surveyors) No. of Staff-Months; DurationAddress: of Assignment:53-B, Rest Camp Road, Karachi Cantt. Karachi 12 Staff Months, Five Months Start Date Completion Date Approx. Value of Services (in (Month/Year) (Month/Year) Rs.): May 2009 Sep 2009 Rs. 33,604,500Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Shegoru Sai (Advisor, Japanese RAP expert), Syed Nadeem Arif (Project Director), M. Rashid Siddiqui(Project Coordinator), Saquib Ejaz Hussain (PCM Coordinator), Dr. Akhtar Hai (Economic Advisor),Dr. Mansoor Imam (Urban Development Specialist), Dr. Mirza Arshad Ali Beg (Senior Socio-Environmental Expert), Mushtaq Mirani (Senior Socio-Economic Expert), Kaneez Fatima (SeniorSociologist), Safia Minhaj (Data Acquisition Expert) Sultan Mehmood Zaman (Socio-Economic SurveyCoordinator).Narrative Description of Project:This Framework of Resettlement Action Plan is intended to provide the project proponent of JICAfunded project a planning method of appropriate involuntary action plan for resettlementarrangement. Thereby KUTC as a project proponent would be able to develop appropriateResettlement Action Plan, or RAP.This framework of RAP aims at setting up broad guidelines for the formulation and implementationof RAP by KUTC as a project proponents as per JICA Guidelines for the Environment and SocialConsiderations of April 2002.Description of Actual Services Provided by Your Staff:In this project the socio-economic trends of the encroached area were ascertained and householddata collection was done. The major task involved in the project have been described as under:  Estimation of Project Affected Persons (PAPs) from the project area  Supervision of Entire Data Collection Tasks  Social Impact Assessment of the project related activities  Identification of Resettlement related legislation in Pakistan and Suggestion  Development of framework / guideline for RAP or LARP  Preparation of Final Reports and Submission to the client 68 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Beneficiaries’ Survey for the Study on “Ex-post Evaluation of Country:ODA Loan Projects (Sri Lanka & Pakistan-Fiscal Year 2008) PakistanProject Name: “Karachi Water Supply Improvement Project” Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Wa Water Quality Expert, Surveyors for Beneficiary SurveyName of Client: No. of Staff:Karachi Water & Sewerage Board (KW&SB) 01 (Water Quality Expert), 08 (Surveyors) No. of Staff-Months; DurationAddress: of Assignment:Ninth Mile Karsaz, Main Shahrah-e-Faisal, Karachi 03 Months Start Date Completion Date Approx. Value of Services (in (Month/Year) (Month/Year) Rs.): Mar 2009 May 2009 Rs. 1,756,950Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Saquib Ejaz Hussain (Water Quality Expert)Narrative Description of Project:The survey for “Karachi Water Supply Improvement Project” was conducted by EnvironmentalManagement Consultants (EMC) in Feb 2009 on request of “Kaihatsu Management Consulting(KMC) Inc. of Japan. The proposed project was funded by JICA for Karachi Water and SewerageBoard in which loan was provided to KW&SB for Installation of Water Filtration Plants at Pipri andHub.The Beneficiary Survey conducted by EMC was part of “Post Project Evaluation” which is therequirement of JICA ODA Loan Projects.The scope of the survey included the sample survey of socioecomic and health profile of theresidents of 18 town of Karachi to verify the status of project’s success and identify the loop holesfor further improvement.Description of Actual Services Provided by Your Staff:The major task was preparation and implementation of questionnaire survey of beneficiaryhouseholds. The following work items were included in the task:  Hire and train enumerators  Support the study team with selection of samples  Implement a pre-test  Implement Survey  Input data in Excel sheet  Double-check the data  Re-collect data (if any)  Finalize and submit the data in the Excel sheet 69 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination of Tanks Terminal Pakistan Professional Staff Provided by Location within Country Your Firm/Entity(profiles): Port Qasim, Karachi Environmentalists, Engineers and other specialists Name of Client: No. of Staff: Pakistan House International Ltd Nine (09) Address: No. of Staff-Months; Duration Plot No. 49 & 71, Edible Oil & Molasses Area, South Western of Assignment: Zone Port Qasim Karachi 16 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 3,170 Jan 2009 Feb 2009 Rs. 250,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr. Iqbal Ali (Hydrologist), Dr. Shahid Alam (Structure Expert), Saquib Ejaz Hussain (Environmental Expert) Khursheed Ali (Environmental Engineer), Samreen Siddiqui (Environmental Scientist), Shahla Ijtaba ( Environmental Engineer), Naheed Iqbal (Project Coordinator) Narrative Description of Project:An The proposed project is concerned with the setting up of Tank Terminal which will be used for storage of petrochemical raw material and feedstock, so an Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project. Description of Actual Services Provided by Your Staff: Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of construction of tanks terminal; an IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997. All options for impact mitigation and management for the construction and operation phase of the treatment plant were explored and suitable recommendations were given 70 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Dolmen City Mall Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Engineers and other specialistsName of Client: No. of Staff:International Complex Projects Limited (Dolmen Group of Eight (08)Company) No. of Staff-Months; DurationAddress: of Assignment:HC-3, Block-4, KDA Scheme No.5 Clifton Karachi 28 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 8,878 Nov 2009 Feb 2010 Rs. 700,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Director), Dr. Mirza Arshad Ali Beg (Senior Environmental Expert), Dr.Badar Munir Ghauri (Air Quality Expert), Shahid Ali Lutfi (Environmental Engineer), Faraz AhmedKhan (Environmental Expert), Khursheed Ali (Environmental Engineer), Shahla Ijtaba(Environmental Engineer), Samreen Siddiqui (Environmentalist)Narrative Description of Project:The proposed project is concerned with construction of shopping mall as well as commercial officebuilding An EIA study has considered all the relevant clauses and sections of national legislations,regulations and guidelines related to the project as well as appropriate international guidelines. Therecommendations would be given on the basis of project activities.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows:  Baseline survey for environmental condition  Ambient air quality monitoring.  Identification of likely impacts due to project related activities during construction and post construction (operational) stages.  Description of appropriate mitigation measure  Development of Environmental Management and monitoring plan 71 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination of Amrelli Steel Mills Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Karachi Environmentalists, Engineers and other specialists Name of Client: No. of Staff: Amrelli Steels (Pvt) Ltd Five (05) No. of Staff-Months; Duration Address: of Assignment: Head Office & Factory: D/89, Shershah Road SITE Karachi 25 Staff-Months, Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 5,073 Jul 2008 Nov 2008 Rs. 400,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: Syed Nadeem Arif (Project Director), Dr Mirza Arshad Ali Beg (Senior Environmental Expert), Dr. Mansoor Imam (Solid Waste Expert), Shahid Ali Lutfi (Environmental Engineer), Faraz Ahmed Khan (Environmental Expert) Narrative Description of Project:An The proposed project is concerned with the establishment of a melt shop and a hot rolling mill to reduce the import of steel and iron, so an Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project. Description of Actual Services Provided by Your Staff: Screening of potential impacts of environmental parameters was done, impacts during construction and operational phases were dealt separately. Mitigation measures were proposed for the potential impacts. Formulation of environmental monitoring program and institutional requirement was also included in the report. 72 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination Power Generation Units Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): West Wharf & Haroonabad, Karachi Environmentalists, Engineers and other specialists Name of Client: No. of Staff: Karachi Electric Supply Corporation Ltd Eight (08) No. of Staff-Months; Duration Address: of Assignment:7th, 7th Floor, State Life Building-11, Abdullah Haroon Road Karachi 14 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,122 Oct 2008 Nov 2008 Rs. 325,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Badar Munir Ghauri (Air Quality Expert), Shahid Ali Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali (Environmental Engineer), Shahla Ijtaba (Environmental Engineer), Samreen Siddiqui (Environmentalist) Narrative Description of Project: The proposed project is concerned with the establishment of power generation units to manage the acute power shortage in Karachi. An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project. An IEE document has been prepared to meet the relevant national legislations, regulations and guidelines related to the power generation units Description of Actual Services Provided by Your Staff: Study has been made to identify potential impacts and screening of the environmental impacts has been carried out 73 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Environmental Impact Assessment of Tuwairqi Steel Mills Pakistan Project Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Port Qasim, Karachi Environmentalists, Engineers and other specialists Name of Client: No. of Staff: Al-Tuwairqi Group Nine (09) Address: No. of Staff-Months; Duration 1st Floor, Block D Finance & Trade Centre Shahrah-e-Faisal of Assignment: Karachi 79 Staff-Months, Ten (10) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 20,040 Jan 2008 Oct 2008 Rs. 1,580,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed: Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali, Dr, Badar Munir Ghauri (Air Quality Expert), Shahid Ali Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali (Environmental Engineer), Shahla Ijtaba (Environmental Engineer), Naheed Iqbal (Project Coordinator) Narrative Description of Project:An The proposed project is related with the setting up of a steel mill plant to produce direct reduced iron in the first phase and steel billets in the second. An EIA study has extensively considered all the relevant clauses and sections of national legislations, regulations and guidelines related to the Steel Mill as well as appropriate international guidelines. The recommendations would be given on the basis of project activities. Description of Actual Services Provided by Your Staff: Scope of the project works is as follows:  Feasibility Study  Baseline environmental surveys  Air quality monitoring.  Identification of mitigation measures for their residuals.  Development of Emergency Response Procedure  Environmental Management Planning. 74 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination Report for Drilling Chemical Pakistan Storage Warehouse Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Hawkesbay, Karachi Environmentalists, Engineers and other specialists Name of Client: No. of Staff: Mi-SWACO M-I Overseas Limited Five (05) Address: No. of Staff-Months; Duration of 501, S.T. Saifuddin Building. Civil Lines, Beaumont Road, Assignment: Karachi 32 Staff-Months, Seven (07) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 9,830 Mar 2008 Sep 2008 Rs. 775,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Senior Environmental Expert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist) Narrative Description of Project: Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of Drilling Chemical Storage Warehouse project; an IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997. Description of Actual Services Provided by Your Staff: Screening of the environmental impacts has been carried out and study has been made to identify potential impacts. 75 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country:En Evironmental Impact Assessment of Sonda-Jherruk Pakistan Coal Mine Project Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Union Council Jherruck, Thatta District, Sindh Environmentalists, Engineers, Air Quality Experts and other specialists Name of Client: No. of Staff: China National Machinery Ten (10) No. of Staff-Months; Duration of Address: Assignment: 39/G-1, Block-6, PECHS, Karachi 88 Staff-Months, Ten (10) Months Approx. Value of Services (in Start Date Completion Date Current US$ &Rs.): (Month/Year) (Month/Year) US$. 18,000 Nov 2007 Aug 2008 Rs. 1,475,821 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali (Hydrologist), Dr. BadarGhauri (Air Quality Expert), Dr. Viqar Hussain (Geologist), Mushtaq Mirani (Socio-economic Expert), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali (Environmental Engineer), Shahla Ijtaba (Environmental Engineer) Narrative Description of Project: Sonda-Jherruk minefield is located in Union Council Jherruckand Sonda, Thatta District, Sindh Province, Pakistan, at the west of Indus River.The minefield is about 190 km of transportation distance to Karachi in the southwest and about 38 km of transportation distance to Hyderabad in the north. The proposed Sonda-Jherruck Coal Mine Project (SJCMP) comprises sustainable development of coalmine and mine mouth at Sonda-Jherruck for production of 1.8 million tons coal annually or 5000 tons/day. The project involves investments of about US$ 315.79 million. Coalmine area has been leased for 30 years and coal extraction from the mine will be approximately 1.80 million tons per annum. It has planned to sink a 180 m shaft to extract Coal. The proposed project involves the development of mining site, installation of mining machinery and equipment and transportation of coal from the mine deep down. Description of Actual Services Provided by Your Staff: Scope of the project works is as follows:  Preliminary site visit,  Scoping exercise, background information & literature review.  Detailed physical survey, field sampling and laboratory analysis.  Identification of environmental aspects, mitigation measures of significant impacts.  Environmental Management and Monitoring plan, review of EIA study 76 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Environmental Impact Assessment of Jherruk Coal Fired Power Pakistan Plant Project Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Thatta District, Sindh Environmentalists, Engineers, Air Quality Experts and other specialists Name of Client: No. of Staff: China National Machinery Imp. & Exp. Corp Ten (10) No. of Staff-Months; Duration Address: of Assignment: 39/G-1, Block-6, PECHS, Karachi 89 Staff-Months, Ten (10) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 18,000 Nov 2007 Aug 2008 Rs. 1,475,821 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali (Hydrologist), Dr. Badar Ghauri (Air Quality Expert), Dr. Viqar Hussain (Geologist), Mushtaq Miran (Socioeconomic Expert), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali (Environmental Engineer), Shahla Ijtaba (Environmental Engineer) Narrative Description of Project: The proposed Jherruck Power Plant Project (JPPP) comprises sustainable development of 3 X 135 MW – mine – mouth Power Plant An EIA study has extensively considered all the relevant clauses and sections of national legislations, regulations and guidelines related to the project as well as appropriate international guidelines. The recommendations would be given on the basis of project activities. Description of Actual Services Provided by Your Staff: Scope of the project works is as follows:  Baseline survey for environmental condition  Ambient air quality monitoring.  Identification of impacts due to project related activities during construction and post construction (operational) stages.  Description of appropriate mitigation measure for impacts  Development of Environmental Management and Monitoring Plan for both stage of the project 77 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination of Wastewater Treatment Pakistan Plant Professional Staff Provided by Your Firm/Entity(profiles): Location within Country: Environmentalists, Engineers, Hub, Balochistan Structure Engineer and other specialists. Name of Client: No. of Staff: Proctor & Gamble Pakistan (Pvt) Ltd Nine (09) No. of Staff-Months; Duration Address: of Assignment: B-233/234, M-12, H.I.T.E, Hub Balochistan 43 Staff-Months, Six (06) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,439 Mar 2008 Aug 2008 Rs. 350,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali (Hydrologist), Dr. Shahid Alam (Structure Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali (Environmental Engineer), Samreen Siddiqui (Environmentalist), Shahla Ijtaba (Environmental Engineer), Naheed Iqbal (Project Coordinator) Narrative Description of Project: The proposed project is concerned with the construction, establishment and operation of Wastewater Treatment Plant. An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project; an IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997. Description of Actual Services Provided by Your Staff: Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of wastewater treatment plant; an IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997. All options for impact mitigation and management for the construction and operation phase of the treatment plant were explored and suitable recommendations were given regarding the same. 78 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Environmental Impact Assessment of LNG Terminal, Jetty & Country:Extraction Facility Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity (profiles):Port Qasim, Karachi Environmentalists, Engineers and other specialists.Name of Client: No. of Staff:Pakistan Gasport Ltd Eleven (11) No. of Staff-Months; DurationAddress: of Assignment:Associated House, Seven Egerton Road Lahore 19 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 13,952 Jul 2008 Aug 2008 Rs. 1,100,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Badar Munir Ghauri (Air Quality Expert), Dr. Shaukat HayatKhan (Expert on Marine Ecology), Dr. Shahid Alam (Structure Engineer), Dr. Mansoor Imam (SolidWaste Expert), Shahid Lutfi (Environmental Expert), Faiz Kakar, Sarfaraz Hussain, Faraz AhmedKhan (Project Coordinator & Environmentalist),Narrative Description of Project:The project is located just North of Qutub Point in Kadiro Creek linking main Port Qasim navigationchannel with Korangi Creek. It is specifically designed to accommodate LNG Cargo vessels and re-gasification facility at the point of reception. An EIA study has considered all the relevant clausesand sections of national legislations, regulations and guidelines related to the project as well asappropriate international guidelines. The recommendations would be given on the basis of projectactivities.Description of Actual Services Provided by Your Staff:To investigate the aspects and corresponding impacts of the project, study comprising:  Surveys, laboratory analysis  The potential impacts were analyzed  Impact management and mitigation measures were recommended  Environmental management and monitoring plans were developed for various project phases. 79 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Oil Pipeline from Single PakistanPoint Mooring to Bosicor Oil Refinery. Professional Staff Provided by Your Firm/Entity (profiles):Location within Country: Environmentalists, Engineers, AirBalochistan Quality Experts and other specialists.Name of Client: No. of Staff:Bosicor Pakistan Limited Nine (09) No. of Staff-Months; DurationAddress: th of Assignment:5 Floor, Business Plaza Mumtaz Hasan Road, Karachi 40 Staff-Months, Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 20,738 Mar 2008 Jul 2008 Rs. 1,635,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Badar Ghauri (Air Quality Expert), Dr. Shaukat Hayat Khan, Shahid Lutfi (EnvironmentalEngineer), Faiz Kakar, Faraz Ahmed Khan (Project Coordinator & Environmentalist), Shahla Anjum(Environmental Engineer), Naheed Iqbal (Project Coordinator)Narrative Description of Project:BPL has planned to acquire oil from international market and thus establishing a pipeline inassociation with Coastal Refinery Ltd. This pipeline will partly laid down under water and partly onland. The concept of this project is establish a Single Point Moor (SPM) in the sea at Khalifa Pointfrom where it will be connected to the pipeline and then pipeline will be connected to the storagetanks of BPL.An EIA study has extensively considered all the relevant clauses and sections of nationallegislations, regulations and guidelines related to the oil refinery as well as appropriate internationalguidelines. The recommendations were given on the basis of project activities.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline environmental surveys Air quality monitoring. Assessment of impacts due to establishment of oil refinery Identification of mitigation measures for their residuals. Development of Emergency Response Procedure Environmental Management Plan. 80 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of IT Tower Complex Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity (profiles):Civic Center, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:IJM Construction Pakistan (Pvt) Ltd Ten (10) No. of Staff-Months; DurationAddress: of Assignment:China Ground, Muslimabad, Kashmir Road Karachi 17 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 11,415 May 2008 Jun 2008 Rs. 900,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr.Iqbal Ali (Hydrologist), Dr. Shahid Alam (Structure Engineer), Dr. Mansoor Imam (Solid WasteExpert), Mr. Ashar Lodhi (Transport Engineer), Faraz Ahmed Khan (Environmental Scientist), ShahlaIjtaba (Environmental Engineer), Samreen Siddiqui (Environmentalist), Naheed Iqbal (ProjectCoordinator)Narrative Description of Project:IT Tower Complex is a project of such nature that will provide 10,000 seats call centres, a threebasement car parking area to facilitate 2,500 cars at a time, food courts, high class shoppingarcade, Cineplex for entertainment purposes, a hotel and other office spaces. Tower will have 47stories. A total covered area of 2.8 million ft2 will be occupied by the tower. It is a project of IMTechnologies.This project is a multi-use complex and will fulfil office needs as well as providing accommodationand entertainment facilities. It will have world class support facilities and services to manage thewhole building through a centralised building management system.Description of Actual Services Provided by Your Staff: Study was made to develop the baseline and identify the potential impacts of the proposed project;a mitigation matrix containing technical and non- technical measures was developed for both theproject phases. Future monitoring requirements were also identified. 81 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Fertilizer & Grain PakistanTerminal Professional Staff Provided byLocation within Country: Your Firm/Entity (profiles):Port Qasim, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Fauji Akbar Portia Marine Terminals (Pvt) Ltd Eleven (11)Address: No. of Staff-Months; Duration ofOff. No. 10, 2nd Floor, Services Club Ext. Building, Assignment:Mereweather Road, Karachi 29 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$.13,952 Jan 2008 Mar 2008 Rs. 1,100,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Deputy Project Manager), Dr. Mirza Arshad AliBeg (Team Leader & Environmental Expert), Dr. Badar Munir Ghauri (Air Quality Expert), Dr.Shaukat Hayat Khan (Expert on Marine Ecology), Dr. Shahid Alam (Jetty Structure Expert), Dr.Mansoor Imam (Solid Waste Expert), , Faraz Ahmed Khan (Environmentalist & Project Coordinator),Yawar Jamil (Environmental Engineer), Khursheed Ali (Environmental Engineer), Samreen Siddiqui(Environmentalist)Narrative Description of Project:The project is located in Port Qasim and designed for handling, storing and bagging of fertilizers,grains and oil seeds, and rice with combined tonnage of about four (04) million tons per annum.The grains and fertilizers are unloaded and conveyed with the help of bulk unloaders and conveyoroffloading belts. An EIA study has considered all the relevant clauses and sections of nationallegislations, regulations and guidelines related to the fertilizer industry as well as appropriateinternational guidelines were also considered. The recommendations would be given on the basis ofproject activities.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Preliminary site visit, Scoping exercise, background information & literature review. Detailed physical survey, field sampling and laboratory analysis. Identification of environmental aspects, mitigation measures of significant impacts. Environmental Management and Monitoring plan, review of EIA study 82 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Power Plant & CRM Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Landhi Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:International Industries Ltd, Landhi Karachi Nine (09)Address: No. of Staff-Months; Duration101-Beaumont Plaza, Near PIDC House, 10-Beaumont of Assignment:Road, Karachi 31 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 4,439 Nov 2007 Feb 2008 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Badar Munir Ghauri (Air Quality Expert), Shahid Lutfi (Environmental Engineer),Faraz Ahmed Khan Project Coordinator & Environmentalist), Yawar Jameel (EnvironmentalEngineer), Khursheed Ali (Environmental Engineer), Joveria Chauhdry (Environmental Engineer),Samreen Siddiqui (Environmentalist)Narrative Description of Project:The project will be situated at Landhi area on Survey Nos. 399 to 405, Deh Sharabi, LandhiTown, Karachi. Land requirement for the complete project is 40 acres. International Industriesis intending to establish Cold Rolling Mill and Gas Fired power plant to manufacture high qualityof Cold Rolled CoilsAn Initial Environmental Examination (IEE) has been carried out to provide all necessaryinformation on potential environmental and social impacts at the different stages of Power Plant& CRM project an IEE document has been prepared to meet the legislative requirement ofPakistan Environmental Protection Act 1997Description of Actual Services Provided by Your Staff:Study has been made to identify potential impacts and screening of the environmental impactshas been carried out. 83 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Engineers, Geologists, Air Quality ExpertsName of Client: No. of Staff:Pakistan Textile City, Port Qasim Karachi Eleven (11) No. of Staff-Months; DurationAddress: of Assignment:1st Floor, Tower-B, FTC Building, Shahrah-e-Faisal, Karachi 57 Staff-Months, Six (06) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 15,867 Oct 2007 Mar 2008 Rs. 1,251,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Mansoor Imam (Solid Waste Expert), Dr. Shaukat HayatKhan (Expert on Marine Ecology), Dr. Badar Munir Khan Ghauri (Air Quality Expert), Dr. ShahidAlam (Structure Engineer), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan (ProjectCoordinator & Environmentalist), Yawar Jameel (Environmental Engineer), Khursheed Ali(Environmental Engineer)Narrative Description of Project:The project is located in the Eastern Industrial Zone of Port Qasim having covered area of about1,250 acres. It is developed to provide the domestic textile industry with state-of the artinfrastructure to maximize the production capabilities to enable it to compete with best in theinternational market. An EIA study has extensively considered all the relevant clauses and sectionsof national legislations, regulations and guidelines related to the textile industry as well asappropriate international guidelines were also considered. The recommendations would be given onthe basis of project activities.Description of Actual Services Provided by Your Staff:To investigate the aspects and corresponding impacts of the project, study comprising: Surveys, laboratory analysis The potential impacts were analyzed Impact management and mitigation measures were recommended Environmental management and monitoring plans were developed for various project phases. 84 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Acacia Country & Golf PakistanClub Karachi Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Malir Cantt., Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Quality Golf Pakistan (Pvt) Limited Eight (08) No. of Staff-Months; DurationAddress: of Assignment:C-65, KDA Scheme – 1, Karsaz Road, Karachi 14 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 9,512 Dec 2007 Jan 2008 Rs. 750,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Badar Munir Ghauri (Air Quality Expert), Faraz Ahmed Khan (Project Coordinator &Environmentalist), Yawar Jamil (Environmental Engineer), Khurshid Ali (Environmental Engineer),Joveria Chauhdry (Environmental Engineer), Samreen Siddiqui (Environmentalist)Narrative Description of Project:Quality Golf Pakistan (Private) Limited – QGPL to set-up a country and golf club in Pakistan at aprime location of Karachi. This upcoming project has been named as ACACIA Country & Golf Club(ACGC) which is being established near Quaid-e-Azam International Airport, Malir Cantonment,Karachi. The proposed project is concerned with the establishment of a country and golf club. AnInitial Environmental Examination (IEE) has been carried out to provide all necessary information onpotential environmental and social impacts at the different stages project, an IEE document hasbeen prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997Description of Actual Services Provided by Your Staff:Possible environmental concerns and the impacts have been sorted out and report has been madecovered all concerned areas which might effect the environment. 85 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of LPG Storage & Bottling PakistanPlant Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub Baluchistan Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:National Gases Ltd, Hub Baluchistan Seven (07) No. of Staff-Months; DurationAddress: of Assignment:F-74/A, SITE, Karachi 12 Staff-Months, Two (02) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,170 Dec 2007 Jan 2008 Rs. 250,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan(Project Coordinator & Environmentalist), Yawar Jameel (Environmental Engineer), Khursheed Ali(Environmental Engineer), Joveria Chauhdry (Environmental Engineer), Samreen Siddiqui(Environmentalist)Narrative Description of Project:National Gases Limited is one of the largest Gas producing, distribution and marketing companyin Pakistan. It is based in Karachi, and operating all over the Pakistan. It is equipped with state ofthe art production, testing, storage, filling, and distribution facilities for gases. They also offer themost comprehensive range of gases in all purities ranging from industrial or commercial grade toultra-high purity grades.National Gases Limited has planned to set up LPG storage and filling facility in Hub, Balochistan.This proposed plant will be set up at 04 acres area with storage capacity 100 Metric Tons andfilling capacity 25 Metric Tons per single shift. The annual throughput of LPG will be received byroad tankers from source to filling plant and transfer to consumers by filling them into cylinders ordecanting into the transport tanks for bulk supply through LPG Pumps. An IEE document hasbeen prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997Description of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts duringconstruction and operational phases were dealt separately. Mitigation measures were proposedfor the potential impacts. Formulation of environmental monitoring program and institutionalrequirement was also included in the report. 86 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for McDonald’s Restaurant Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):F-9 Park, Islamabad Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Siza Food (Pvt) Ltd Seven (07) No. of Staff-Months; DurationAddress: of Assignment:Lakson Square Building – 2, Sarwar Shaheed Road, Karachi 25 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$.6,341 Oct 2007 Jan 2008 Rs. 5,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan(Project Coordinator & Environmentalist), Yawar Jameel (Environmental Engineer), Khursheed Ali(Environmental Engineer), Joveria Chauhdry (Environmental Engineer), Samreen Siddiqui(Environmentalist)Narrative Description of Project:Siza Food Pvt Ltd, who is McDonalds’s franchise owner in Pakistan, decided to open their firstbranch in F-9 Park, Islamabad. The assessment of this IEE study has been focused on the operationof restaurant. The major areas covered in the impact analysis include solid waste, waste water,noise, emissions, occupational safety and socio-economic factors. Facilities which are included tomanage restaurant operations include HVAC, water, natural gas, electricity, communication,illumination, water treatment and solid waste management. All these systems are installed as perinternational standards and calibrated at higher degree.Description of Actual Services Provided by Your Staff:Siza Foods engaged EMC to conduct an IEE of the proposed program. EMC undertook anenvironmental screening to identify important environmental issues, identify likely project impactsand recommended mitigation measures; detailed analysis has been made of the impacts of theproject on the ecology of the project area. A survey to determine the socioeconomic impacts of theproposed activity on the people living nearby was also conducted. 87 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for Services Apartments Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Lahore Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Orix Properties Pakistan (Pvt) Ltd. Lahore Seven (07) No. of Staff-Months; DurationAddress: of Assignment:42 (C) - E -1, Ghalib Road, Gulberg – III, Lahore 14 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 6,976 Nov 2007 Jan 2008 Rs. 550,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Shahid Ali Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator &Environmentalist), Yawar Jameel (Environmental Engineer), Khursheed Ali (EnvironmentalEngineer), Joveria Chauhdry (Environmental Engineer)Narrative Description of Project:Orix Properties Pakistan (Private) Limited (OPPL) has proposed the serviced apartments in theGulberg town, Lahore, which is the posh locality of the city. The site is located in the semi-commercial area of Gulberg, Lahore, which is a peaceful place and surrounded by the residentialbungalows. The infra-structure around site is excellent with spacious roads and proper seweragesystem. There is no significant flora and fauna found on site, except some wild bushes, shrubs,herbs and some pet animals.Orix Properties Pakistan (Pvt) Ltd had a plan to conduct IEE for Services Apartments in Lahore.The purpose of IEE was to enlighten environmental impacts associated with the project.Description of Actual Services Provided by Your Staff:Orix Properties Pakistan engaged EMC to conduct an IEE of the proposed project. EMC undertookan environmental screening to identify important environmental issues, identify likely projectimpacts and recommended mitigation measures; detailed analysis has been made of the impactsof the project on the ecology of the project area. A survey to determine the socioeconomicimpacts of the proposed activity on the people living nearby was also conducted. 88 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Shiekh Zayed Centre Pakistan(Mabarak Centre) Lahore Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Garden Town, Lahore Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Taa’vun Group UAE & Government of Punjab Nine (09) No. of Staff-Months; DurationAddress: of Assignment:Oberoi House-2, E-2, Gulberg III Lahore 45 Staff-Months, Five (05) Months Approx. Value of Services (in Start Date Completion Date Current US$ &Rs.): (Month/Year) (Month/Year) US$. 15,220 Aug 2007 Dec 2007 Rs. 1,200,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Deputy Project Manager), Dr. Mirza Arshad AliBeg (Team Leader & Environmental Expert), Dr. Badar Munir Ghauri (Air Quality Expert), Dr.Mansoor Imam (Solid Waste Expert), Dr. Nawaz Ch. (Expert on Geology), Dr. Ch. M.Afzal (Experton Ecology), Dr. Shahid Alam (Expert on High Rise Building Structure), Samia Saif (Expert on Social& Archaeological Issues), Faraz Ahmed Khan (Environmentalist), Jamal Qureshi (Environmentalist)Narrative Description of Project:This project is located in Garden Town, Lahore having covered area of about 62,412m 2. MabarakCentre is a multi-use complex, consisting of four towers and a horseshoe shaped building. Itincludes residential and office towers, as well as conference halls, shopping mall and a five starhotel. A high rise building with the name has been proposed by Taa’vun which is a joint venture ofGovernment of Punjab and UAE Government. EIA study was conducted to assess the environmentaland social impacts of the project and recommending mitigation measures.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Preliminary site visit Scoping exercise, background information & literature review. Detailed physical survey, field sampling and laboratory analysis. Identification of environmental aspects, mitigation measures of significant impacts. Environmental Management and Monitoring plan, review of EIA study 89 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Cold Rolling Mill Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Aisha Steel Mill, Bin Qasim, Karachi Nine (09) No. of Staff-Months; Duration ofAddress: Assignment:709, Business & Finance Centre, I.I.Chundrigar Road, Karachi 25 Staff-Months, Three (03) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 6,341 Aug 2007 Oct 2007 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Deputy Project Manager), Dr. Mirza Arshad Ali Beg(Team Leader & Environmental Expert), Dr. Badar Munir Ghauri (Air Quality Expert), Dr. MansoorImam (Solid Waste Expert), Dr. Shaukat Hayat Khan (Expert on Marine Ecology), Dr. Shahid Alam(Structure Engineer), Samita Nadeem (Environmental Engineer), Faraz Ahmed Khan (Environmentalist)Narrative Description of Project:Aisha Steel Mill is a cold rolling unit located in the downstream industrial zone of Pakistan Steel Mills inBin Qasim Town. The total covered area of the project is 50 acres. The main components of the millare rolling mill, annealing furnace, pickling line and galvanising unit. For making cold rolled andgalvanised coils raw materials including hot rolled strips/coils are used. An EIA study has considered allthe relevant clauses and sections of national legislations, regulations and guidelines related to theproject as well as appropriate international guidelines were also considered. The recommendationswould be given on the basis of project activities.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline environmental surveys Air quality monitoring. Assessment of impacts due to establishment of Steel Mill Identification of mitigation measures for their residuals. Development of Emergency Response Procedure Environmental Management Plan. 90 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of 5-Steel Bridges Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:City District Government, Karachi Five (05) No. of Staff-Months; DurationAddress: th of Assignment:6 Floor, Civic Centre, Karachi 18 Staff-Months, Four (04) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 12,049 Jul 2007 Oct 2007 Rs. 950,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Shahid Lutfi (Environmental Engineer), Faraz Ahmed Khan(Project Coordinator & Environmentalist), Yawar Jameel (Environmentalist), Khursheed Ali(Environmental Engineer)Narrative Description of Project:CDGK is intended to construct 5-Steel bridges at different locations of Karachi for which IEE studyhas been conducted to assess the environmental and social impacts of the project in the projectvicinity and providing recommendations to mitigate those impacts.Description of Actual Services Provided byYour Staff:CDGK engaged EMC to conduct an IEE of theproposed project. EMC undertook anenvironmental screening to identify importantenvironmental issues, identify likely projectimpacts and recommended mitigation measures;detailed analysis has been made of the impactsof the project on the ecology of the project area.A survey to determine the socioeconomicimpacts of the proposed activity on the peopleliving nearby was also conducted. 91 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment for Bosicor Oil Refinery Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub, Balochistan Environmentalists, Engineers, Geologists and other specialistsName of Client: No. of Staff:Bosicor Oil Pakistan Ltd. Seven (07) No. of Staff-Months; DurationAddress: th of Assignment:5 Floor, Business Plaza, Mumtaz Hassan Road, Karachi 52 Staff-Months, Eight (08) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,984 Nov 2006 Jun 2007 Rs. 393,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Mansoor Imam (Solid Waste Expert), Dr. Viqar (Expert onGeology), Shahid Ali Lutfi (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator &Environmentalist)Narrative Description of Project:Bosicor Oil Pakistan planned to set up an oil refinery in order to meet not only energy requirementof the country but also to acquire additional security and desires flexibility in its supply, An EIA hasbeen conducted and presented in a public hearing. This study identifies all the environmental andsocial impacts which may be caused due to the construction and operation of this project alongwiththe mitigation measures provided.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Recognition of impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure for impacts Development of Environmental Management and Monitoring Plan 92 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Additional Storage Tanks Pakistan& Isomerisation Unit Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub, Balochistan Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Bosicor Pakistan Limited Six (06) No. of Staff-Months; DurationAddress: th of Assignment:5 Floor, Business Plaza, Mumtaz Hassan Road, Karachi 45 Staff-Months, Eight (08) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,819 Nov 2006 Jun 2007 Rs. 380,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:The project is located at Khalifa Point on the coastline of the Arabian Sea. Bosicor refinery isproducing 600 bbls LPG, 32,610 bbls export naphtha, 42,090 bbls premier motor gasoline, 6000 bblsBosicor light oil, 165,840 bbls high speed diesel and 241, 740 bbls fuel furnace oil. BPL has plannedto extend its operation by adding up a new process unit (the Isomerisation Unit) which will processlight naphtha through isomerisation process to form high octane products. BPL also planning toincrease its storage capacities for future needs and for this purpose constructing 11 additionalstorage tanks near existing storage tanks area with the capacity of 126,000 tons. Two additionalnew tanks are for crude oil and the rest are the product storage tanks.An Initial EnvironmentalExamination (IEE) has been carried out to provide all necessary information on potentialenvironmental and social impacts at the different stages of project, an IEE document has beenprepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997.Description of Actual Services Provided by Your Staff:Initial Environmental Examination (IEE) has been carried out to provide all necessary information onpotential environmental and social impacts at the different stages of construction of additionalstorage tanks & isomerisation unit; an IEE document has been prepared to meet the legislativerequirement of Pakistan Environmental Protection Act 1997. All options for impact mitigation andmanagement for the construction and operation phase of the treatment plant were explored andsuitable recommendations were given 93 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment for Chemical Plant Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):District Lasbella, Balochistan Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Bosicor Chemical Pakistan Ltd Six (06) No. of Staff-Months; Duration ofAddress: th Assignment:5 Floor, Business Plaza, Mumtaz Hassan Road, Karachi 45 Staff-Months, Eight (08) Months Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,984 Nov 2006 Jun 2007 Rs. 393,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:Bosicor Chemical Pakistan is setting up an Aromatic Complex project in District Lasbella, Balochistan.The total covered area of the project is around 331,573 Square meters. It is an Aromatic Complexhaving production capacity of 6,012,000bbl/annum. Aromatic complex produce chemicals that arefeed stock for production of polyester fibers, plastics, pesticides etc. by downstream manufacturingindustries. An EIA study has been carried out to provide all necessary information on the potentialenvironmental and social environmental impacts at the different stages of project to the BalochistanEnvironmental Agency and other relative agencies and provide appropriate mitigation measures.Description of Actual Services Provided by Your Staff:To investigate the aspects and corresponding impacts of the project, study comprising: Surveys, laboratory analysis The potential impacts were analyzed Impact management and mitigation measures were recommended Environmental management and monitoring plans were developed for various project phases. 94 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Steel Re-bar and Cold PakistanRolling Mill Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:South Asia Steel Mill, Port Qasim, Karachi Six (06) No. of Staff-Months; DurationAddress: of Assignment:Suite 1101, Kashif Centre, Main Shahrah-e-Faisal Karachi 50 Staff-Months, Nine Months (09) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 9,766 Nov 2006 Aug 2007 Rs. 770,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Mansoor Imam (Solid Waste Expert), Shahid Lutfi(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:The project as a new steel mill is located in Port Qasim Area. It comprises of three maincomponents i.e. Cold Rolling Mill, Rebar Mill and Thermal Power Plant. Billets are used as rawmaterial for rebar, hot rolled strips for cold rolling mill and coal for thermal power plant. The coldrolling mill and thermal power plant covers 60 acres while rebar mill covers 40 acres of total projectarea. An EIA study has extensively considered all the relevant clauses and sections of nationallegislations, regulations and guidelines related to the project as well as appropriate internationalguidelines were also considered. The recommendations would be given on the basis of projectactivities.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Baseline survey for environmental condition Ambient air quality monitoring. Recognition of impacts due to project related activities during construction and post construction (operational) stages. Description of appropriate mitigation measure for impacts Development of Environmental Management and Monitoring Plan 95 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Jinnah Town Housing PakistanScheme at KDA-33 Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):KDA-33, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Dawood Enterprises Six (06) No. of Staff-Months; Duration ofAddress: Assignment:Flat-202, Madina Garden, Al-Hilal Housing Society, Karachi 16 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 Mar 2007 May 2007 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Engineer), Dr.Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro (Environmental Engineer),Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:Dawood Enterprises has planned to launch advance housing scheme in the area of KarachiDevelopment Authority Scheme-33, Sector-29. The study was followed by site visits, details ofconstruction activities, post-construction activities such as occupying of houses. Environmental andsocial baseline has been taken from published literature available specifically relevant to the Scheme-33 which was further confirmed during ground visits conducted.The assessment was focused on construction activities, existing infrastructure of area, post-construction activities and transportation. The major areas covered in the impact analysis include airemissions, wastewater, solid waste, community development, adjacent landuse and trafficmanagement.Initial Environmental Examination (IEE) has been conducted for the Jinnah Town Housing Scheme. Allenvironmental and socio-economic impacts have been identified alongwith the possible mitigationmeasures and presented in IEE report that will be adopted by Jinnah Town Housing Scheme. Thisstudy has taken into consideration all relevant national legislations, regulations and guidelines relatedto the development project.Description of Actual Services Provided by Your Staff:Dawood Enterprises engaged EMC to conduct an IEE of the proposed project. EMC undertook anenvironmental screening to identify important environmental issues, identify likely project impacts andrecommended mitigation measures; detailed analysis has been made of the impacts of the project onthe ecology of the project area. A survey to determine the socioeconomic impacts of the proposedactivity on the people living nearby was also conducted. 96 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for Expansion of LPG Storage PakistanTanks Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:SHV Energy (Pakistan) Limited at Port Qasim, Karachi Six (06) No. of Staff-Months; Duration ofAddress: Assignment:98-A, Margalla Road, Sector-F6/2, Islamabad 16 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$): (Month/Year) (Month/Year) US$. 5,582 Feb 2007 Apr 2007 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr.Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro (EnvironmentalEngineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:SHV Energy is one of the largest LPG production industries in Pakistan. SHV Energy has planned toextend its operations in Port Qasim area by its new expansion project of five above the ground LPGstorage tanks adjacent to existing facility. At present SHV Energy has total land area of 5 acres out ofwhich half of that area is being utilised by existing facility. The proposed extension project will startits operations on the remaining half portion of 5 acre land.The assessment was focused on construction activities i.e. foundation works, etc. and operations i.e.LPG storage, filling and transportation. The major areas covered in the impact analysis include airemissions, wastewater, solid waste, occupational safety and traffic management.Facilities to manage operations and emergencies include air compressor, electric power generator,fire protection & safety, water sprinkling system, fire alarm and sewage management system. Allsystems will be installed as per international standards and calibrated at high degree. These systemswill be supported by utilities such as water supply and gas/fuel for generators.Description of Actual Services Provided by Your Staff:Possible environmental concerns and the impacts have been sorted out and report has been madecovered all concerned areas which might effect the environment. 97 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for Construction and PakistanOperation of Sofitel Tower Complex Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Clifton, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Triple Tree Associates Six (06)Address: No. of Staff-Months; Duration7th Floor, Siddiqsons Tower, 3J.C.H. Society, Main Shahrah-e- of Assignment:Faisal, Karachi 27 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,073 Dec 2006 Apr 2007 Rs. 400,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Principal Environmental Expert), Dr.Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro (EnvironmentalEngineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:Triple Tree International Hotel intends to establish Sofitel Tower at Clifton, Karachi which will becomprises of 25 floors hotel, shopping mall on ground floor and 5 floor basement parking. The totalarea acquired for this development is about 7337.52 yd2 and at 28 ft height of sea level.The assessment was primarily focused on the construction activities and later operations of hotelprocedures and relevant mechanics. The major areas covered in the impact analysis includewastewater, solid waste, occupational safety and socio-economic factors as well as trafficmanagement.Facilities to be included to manage Sofitel Tower operations include HVAC, water supply, gassupply, electric, fire alarm, gas detection, communication, earthing and bonding, lighteningprotection, audio visual, fire protection & safety, integrated building management, solid wastemanagement, sewage management systems and energy centre. All these systems will be installedas per international standards and calibrated at high degree. These systems will be supported byutilities such as water, natural gas and electricity.IEE study was carried out to analyze theenvironmental impacts of Sofitel Tower Complex in the adjacent areasDescription of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts during constructionand operational phases were dealt separately. Mitigation measures were proposed for the potentialimpacts 98 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Sofitel Residence Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Clifton, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Triple Tree Associates Seven (07)Address: No. of Staff-Months; Duration7th Floor, Siddiqsons Tower, 3J.C.H. Society, Main Shahrah-e- of Assignment:Faisal, Karachi 18 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs.): (Month/Year) (Month/Year) US$. 4,439 Nov 2007 Jan 2008 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist), Khursheed Ali(Environmental Engineer)Narrative Description of Project:Triple Tree Holding being a local partner of ACCOR Group has proposed the serviced apartments inthe Clifton, Karachi, which is named as Sofitel Residence. The project proposed in the posh locality ofthe city.Sofitel Residence will comprise of 33 floors and a basement. It will cover an area of 7655.67 yd 2 Siteis approximately 23 feet high from mean sea level. First three floors and ground floor will have shops,play area and health club. A dedicated 4 storeys car park has been proposed above the shoppingarea. Services area has been proposed further above in 2 floors. Serviced apartments will occupy 21storeys just after the Services area. Last 2 floors will have mechanical and electrical installationsDescription of Actual Services Provided by Your Staff:Study has been made to identify potential impacts and screening of the environmental impacts hasbeen carried out 99 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment for Karachi Elevated PakistanExpressway from Jinnah Bridge to Quaidabad, Karachi Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:City District Government Karachi Five (05) No. of Staff-Months; Duration ofAddress: th Assignment:6 Floor, Civic Centre, Karachi 33 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 38,051 Aug 2006 Feb 2007 Rs. 3,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Mehwish Zia(Transportation Engineer)Narrative Description of Project:Shahra-e-Faisal in Karachi city is faced with problems of growing traffic jams specially in rush hours.This problem is anticipated to become even worse in future due to increased number of traffic on thisroad. City District Government of Karachi (CDGK) has decided to construct a 24km long elevatedexpressway starting from Jinnah Bridge to Quaidabad. The work has been undertaken by a Malaysianfirm IJM. The design concept has been developed by a consortium of Malaysian and PakistaniConsultants. The expressway consists of prestressed precast concrete super-T type girders supportingreinforced concrete deck slab. The super structure is supported on a single pier with pile cap andpiles. The Project cost is USD 350 million. Exponent Engineers is a part of the consortiumDescription of Actual Services Provided by Your Staff:Scope of the project works is as follows: Feasibility Study Project Planning Preliminary design 100 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Indus Refinery Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):District Thatta, Dhabeji Environmentalists, Engineers, Geologists, Air Quality ExpertsName of Client: No. of Staff:Indus Refinery Limited Five (05) No. of Staff-Months; Duration ofAddress: Assignment:C-85, Block-2, Clifton, Karachi 30 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 10,781 Sep 2005 Mar 2006 Rs. 850,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Viqar (Expert on Geology), Shahid Lutfi (EnvironmentalEngineer), Tariq Soomro (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator &Environmentalist)Narrative Description of Project:Indus Refinery Ltd is an oil refinery which requires Environmental Impact Assessment in theirpremises. The oil refinery is located in Thatta District having covered area around 239 acres. Theprocessing capacity of the refining plant is 4.2 million metric tones per annum, which is equivalent toapproximately 13,500 metric tons/day or 100 barrels per stream day. EMC has successfully preparedand submitted the Environmental Impact Assessment report in July 2006Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Preliminary site visit, Scoping exercise, background information & literature review. Detailed physical survey, field sampling and laboratory analysis. Identification of environmental aspects, mitigation measures of significant impacts. Environmental Management and Monitoring plan, review of EIA study 101 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment for Extension Project of PakistanQasim International Container Terminal (Phase-II) Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Qasim International Container Terminal (QICT). Six (06) No. of Staff-Months; DurationAddress: of Assignment:Berth-5, 6, 7, Marginal Wharves, PQA, Karachi 16 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 Oct 2006 Dec 2006 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi (Environmental Engineer), Tariq Soomro(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:Qasim International Container Terminal (QICT) intends to extend its operations due to the saturationapproaching at the existing Container Terminal at QICT. The location will be Port Qasim which is inthe south-west of District Karachi. The total area for the proposed QICT Phase-II extension will beapproximately 25 hectare.Due to the nature of the project, special considerations were given to the dredging alongside theberths and reclamation work. The type of dredging to be conducted alongside of berths ismaintenance dredging which involves further deepening of previously dredged area and removal ofsiltation from the beds. The area to be dredged along berths will be very small and already disturbeddue to previous dredging therefore, significant impacts are not expecting.EIA for the extension project thoroughly investigated all impacts and recommended its mitigationalongwith the management and monitoring plan. The report completed and got NOC in December2006.Description of Actual Services Provided by Your Staff:To investigate the aspects and corresponding impacts of the project, study comprising: Surveys, laboratory analysis The potential impacts were analyzed Impact management and mitigation measures were recommended Environmental management and monitoring plans were developed for various project phases. 102 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination for Seismic Survey and PakistanExploratory Well Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Ziarat Block, Balochistan Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Mari Gas Company Limited Five (05) No. of Staff-Months; Duration ofAddress: Assignment:21-Mauve Area, 3rd Road, G-10/4, Islamabad 45 Staff-Months, Eight Months (08) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,707 Apr 2006 Nov 2006 Rs. 450,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Dr. Iqbal Ali (Hydrologist), Dr. Mansoor Imam (Solid Waste Expert), Shahid Lutfi(Environmental Engineer), Faraz Ahmed Khan (Project Coordinator & Environmentalist)Narrative Description of Project:Mari Gas intends to undertake seismic and drilling operations in the southern part of Ziarat Blockwhich lies in district Bolan. The southern part of Ziarat Block occupies 95 km area in total.A well organized team established to conduct field visits for various locations that fall within theboundary of project area such as Pir Ghaib, Bibi Nani, Khajuri, Barari, Dranjan and Kirta. It isexpected that the well will be drilled to the nearby area of Bibi Nani.Scope of the work comprised of initial examination of seismic survey at first and gas exploration inthe second phase. It is a blanket IEE for seismic survey and exploratory well completed in Nov 2006Description of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts during constructionand operational phases were dealt separately. Mitigation measures were proposed for the potentialimpacts. Formulation of environmental monitoring program and institutional requirement was alsoincluded in the report. 103 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Baseline & Impact Assessment for DHA PakistanWaterfront Project Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):DHA, Karachi Environmentalists, Environmental Engineers and other specialistsName of Client: No. of Staff:Defence Housing Authority Five (05) No. of Staff-Months; DurationAddress: of Assignment:2-B, East Street, Phase-1, DHA, Karachi 70 staff-Months, 14 Months (14) Approx. Value of Services (in Start Date Completion Date Current US$): (Month/Year) (Month/Year) Rs. 1,400,000 Oct 2006 Dec 2007 US$. 25,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Shahid Lutfi EnvironmentalEngineer), Tariq Soomro (Environmental Engineer), Faraz Ahmed Khan (Project Coordinator &Environmentalist)Narrative Description of Project:DHA has launched some futuristic landmark projects. Waterfront Development is one of suchprojects. The project is located on the Southern portion of Karachi about 14 kms long stretchingfrom Sindbad to the Golf Course.The project has multi-spectral land use patterns in which residential, commercial and recreationalsites are developed. This report outlines the guidance to forthcoming projects of DHA water frontdevelopment. It also includes the impact study of future development and proposes environmentalmanagement methodologies.Description of Actual Services Provided by Your Staff:Assessment of baseline condition at the project area and identification of possible impacts due toproject activities. Mitigation measure to respond to the impacts were mentioned along withenvironmental monitoring plan for the construction and post construction phases 104 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination (IEE) Report for Siza Foods Pakistan(Private) Limited. McDonalds Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Sea View Clifton Karachi Environmental Engineers and related other specialistsName of Client: No. of Staff:Siza Foods (Private) Limited. McDonalds Pakistan Four (04) No. of Staff-Months; DurationAddress: of Assignment:Lackson Square Building-2, Sarwar Shaheed Road, Karachi 20 Staff-Months, Six Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,707 Dec 1999 May 2000 Rs. 450,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Jawed Shah, Faisal AnsariNarrative Description of Project:Siza Foods Pvt. Limited had a plan to conduct IEE for a new McDonald’s outlet at the Clifton BeachKarachi along with a proposed park .The purpose of IEE was to enlighten environmental impactsassociated with the project, since the beach area is apprehended as environmentally sensitive area.Description of Actual Services Provided by Your Staff:Siza foods engaged EMC to conduct an IEE of the proposed program. EMC undertook anenvironmental screening to identify important environmental issues, identify likely project impactsand recommended mitigation measures; detailed analysis has been made of the impacts of theproject on the ecology of the project area. A survey to determine the socioeconomic impacts of theproposed activity on the people living nearby was also conducted and the activity was evaluatedwith special emphasis on the beach ecology. 105 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination (IEE) Report for Aleem Sons PakistanWeaving, Dyeing, Printing (Pvt) Limited. Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):SITE Karachi Environmental Engineers and related other specialistsName of Client: No. of Staff:Aleem Sons Weaving, Dyeing, Printing (Pvt) Limited Four (04) No. of Staff-Months; DurationAddress: of Assignment:B-43, Main Estate Avenue, SITE Karachi 16 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,170 Aug 2002 Dec 2002 Rs. 250,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Dr. Waseem Ahmed, Faisal AnsariNarrative Description of Project:The IEE report was prepared by EMC for Aleem Sons Ltd. who intended to install a textile unit atSITE Karachi. It envisages production of finished cotton fabrics with a capacity of 50,000 m/day,utilizing gray cloth as a raw materialDescription of Actual Services Provided by Your Staff:Screening of potential impacts of environmental parameters was done, impacts during constructionand operational phases were dealt separately. Mitigation measures were proposed for the potentialimpacts. Formulation of environmental monitoring program and institutional requirement was alsoincluded in the report. 106 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Crescent Chemical PakistanPakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):EPZA Karachi Environmental Engineers and related other specialistsName of Client: No. of Staff:Crescent Chemicals Four (04) No. of Staff-Months; DurationAddress: of Assignment:Opposite Dada Manzil, Adamjee Dawood Road, Karachi-74000 16 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,073 May 2003 Sep 2003 Rs. 400,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants:NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Mehmood A Khan, Tariq Soomro(Environmental Engineer)Narrative Description of Project:The scope of this investigation and report covers all the likely impacts arising from the project.Impacts which require further investigations have been defined and their mitigation measuressuggested. The Crescent Chemical Company envisages production of Silicates of sodium andPotassium with a capacity of 6000 MT/year utilizing sand (SiO 2) and soda ash (Na2CO3) as rawmaterial; these liquid sodium silicates are solution of water soluble glasses. The net conclusiondrawn after the IEE is that no significant environmental impacts have been envisaged. Themanufacturing process is well equipped with all the required environmental equipment. The onlyenvironmental hazard foreseen that is spillage which can be complied through good management.Description of Actual Services Provided by Your Staff:Screening of the environmental impacts has been carried out and study has been made to identifypotential impacts. 107 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Impact Assessment of Artistic Milliner’s Denim PakistanProcessing Unit Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Landhi Karachi Environmental Engineers and related other specialistsName of Client: No. of Staff:Artistic Milliners Five (05) No. of Staff-Months; DurationAddress: of Assignment:39-A, Block-6, PECHS Karachi. 15 Staff-Months, Four Months (04) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 4,439 May 2003 Aug 2003 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Farhana Khan, BilalKhan, Ijaz HusainNarrative Description of Project:The theme of this study was to conduct environmental assessments of Artistic Milliner’s proposedproject of Denim Processing Unit situated in Landhi industrial Area. The environmental screeningprocess was conducted using a systematic approach to assess all possible impacts of the variousphases of the proposed project. For this purpose matrix methodology was employed which is themost widely used technique. Since the impact of liquid effluent generated by the textile unit on thewater resources has been identified as potentially significant, therefore wastewater treatment plantis suggested for this project.Description of Actual Services Provided by Your Staff:To investigate the aspects and corresponding impacts of the project, study comprising: Surveys, laboratory analysis The potential impacts were analyzed Impact management and mitigation measures were recommended Environmental management and monitoring plans were developed for various project phases. 108 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Impact Assessment on Quarries at Hallel Site Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Bhit-Sehwan Environmental Engineers, scientistsName of Client: No. of Staff:Eni-LASMO Pakistan Four (04)Address: No. of Staff-Months; Duration of5th floor, the Forum, G-20 Block9, Khayaban-e-Jami, Clifton Assignment:Karachi 10 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 1,528 Aug 2002 Oct 2002 Rs. 120,500Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Mr Tariq Soomro (Environmental Engineer), Ms Jennifer Dean,Mr. Bilal KhanNarrative Description of Project:This report was generated to assess the impact of quarrying on the existing environment of the area.The main objective of the report is to assess the impact of quarry taken from the designated andundesignated sites on air, land, water and human beings which are the main components threatenedby any disturbance to the environment.Description of Actual Services Provided by Your Staff:In this regard a comprehensive survey was carried out to envisage the overall impacts scenario of thefield. While carrying out this assessment few important parameters were selected and it was foundthat the particular activity did not pose any direct environmental impact. 109 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Environmental Impact Assessment of Bajara-Karachi Loop Line Pakistan (GIREP-II) Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Bajara-Karachi Environmentalists, Engineers and related other specialists Name of Client: No. of Staff: Sui Southern Gas Company Limited Four (04) Address: No. of Staff-Months; Duration ST-4/B, Block-14, Sir Shah Suleman Road, Gulshan Iqbal, of Assignment: Karachi 18 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 11,415 Jul 2005 Nov 2005 Rs. 900,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants:NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Shahid Lutfi (Environmental Engineer), Tariq Soomro (Environmental Engineer) Narrative Description of Project: The Bajara Karachi 24”Ø X 200 km loopline project (BKLP) is a continuation of SSGCL’s transmission line expansion phase under GIREP II plan. The proposed gas pipeline will be established at an estimated total cost of Rs. 4437 million and will follow the same route on which its 18” Ø I.R.B.P (Indus Right Bank Pipeline), and 20” Ø I.R.B.P-CEP, 16” Ø I.L.B.P (Indus Left Bank Pipeline) and 20” Ø Kadanwari Pipeline laid in 1975 and 1989 respectively are in operation. Starting from Bajara in Dadu District, the corridor for the Pipeline would proceed along a 10 metre wide strip to Karchat – Sari – Khadeji – ACPL, off-take point – Malir Mixing Plant – SMS Malir and finally terminate at SSGCL’s Karachi Terminal. Approximately half of the portion of this width will be acquired while the other half will be leased on temporary basis by SSGCL. Description of Actual Services Provided by Your Staff: Scope of the project works is as follows:  Baseline survey for environmental condition  Ambient air quality monitoring.  Recognition of impacts due to project related activities during construction and post construction (operational) stages.  Description of appropriate mitigation measure for impacts  Development of Environmental Management and Monitoring Plan 110 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Mach-Kolpur on QPL Pakistan(GIREP-II) Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Mach-Kolpur Environmentalists, Engineers and related other specialistsName of Client: No. of Staff:Sui Southern Gas Company Limited Four (04)Address: No. of Staff-Months; DurationST-4/B, Block-14, Sir Shah Suleman Road, Gulshan Iqbal, of Assignment:Karachi 18 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 10,781 Jul 2005 Nov 2005 Rs. 850,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & EnvironmentalExpert), Shahid Lutfi (Environmental Engineer), Tariq Soomro (Environmental Engineer)Narrative Description of Project:The Mach Kolpur 18”Ø X 15 km loopline project (MKLP) is a continuation of SSGCL’s transmissionline expansion phase under GIREP II plan. The proposed gas pipeline will be established at anestimated total cost of Rs. 348 million. The loopline traverse along the existing 12” Ø QuettaPipeline from Mach Valve Assembly at Khobash to Kolpur Main Valve Assembly.The total width of the corridor of impact of the proposed Mach-Kolpur loopline would be 30’.Almost ninety percent of the loopline route is traversing in the bed of Bolan River and theremaining 10% barren rocky soil near Kolpur Valve Assembly. This land having width of around20’ is to be leased for construction work.Description of Actual Services Provided by Your Staff:Scope of the project works is as follows: Preliminary site visit Scoping exercise, background information & literature review. Detailed physical survey, field sampling and laboratory analysis. Identification of environmental aspects, mitigation measures of significant impacts. Environmental Management and Monitoring plan, review of EIA study 111 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Environmental Impact Assessment of Liquid Cargo Terminal Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Port Qasim, Karachi Environmentalists, Engineers and related other specialists Name of Client: No. of Staff: FWQ Enterprises (Pvt) Limited Five (05) No. of Staff-Months; Duration Address: of Assignment: 110-111 Uni Towers, I.I.Chundrigar Road, Karachi 15 Staff-Months, Four Months (04) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 9,512 Jul 2005 Oct 2005 Rs. 750,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali (Hydrologist), Tariq Soomro (Environmental Engineer) Narrative Description of Project: Liquid Cargo Terminal project is located in Port Qasim. The total area for the purpose is about 30,000m2, which comprises about 18000m2 of waterfront. LCT has one Loading Platform, two breasting dolphins and four mooring dolphins. LCT handles molasses and edible oil from vessels of sizes ranging from 6,000 DWT to 35,000DWT. Description of Actual Services Provided by Your Staff: To investigate the aspects and corresponding impacts of the project, study comprising:  Surveys, laboratory analysis  The potential impacts were analyzed  Impact management and mitigation measures were recommended  Environmental management and monitoring plans were developed for various project phases. 112 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Initial Environmental Examination of Dewan Sugar Mills Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): Thatta, Sindh Environmentalists, Engineers and related other specialists Name of Client: No. of Staff: Dewan Sugar Mills Limited Four (04) No. of Staff-Months; Duration Address: of Assignment: Dewan Sugar Mills, Dewan City, District Thatta, Sindh 8 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,976 Jul 2004 Sep 2004 Rs. 550,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Dr. Syed Nadeem Arif (Project Manager), Dr. Mirza Arshad Ali Beg (Team Leader & Environmental Expert), Dr. Iqbal Ali (Hydrologist), Tariq Soomro (Environmental Engineer) Narrative Description of Project: Dewan Sugar Mills Limited is installing Distillery Plant in their premises for which EMC has successfully prepared the Environmental Impact Assessment report in Sep 2004. The Distillery Plant is being established for manufacturing ethyl alcohol. The second part of the project comprises a Biogas Plant. The aim of the project is to utilize molasses and bagasse (waste material from sugar mill) instead of wasting it. The Distillery Unit and Biogas Plant will function as an Integrated Unit of Dewan Sugar Mills. Description of Actual Services Provided by Your Staff: Study was made to develop the baseline and identify the potential impacts of the proposed project; a mitigation matrix containing technical and non- technical measures was developed for both the project phases. Future monitoring requirements were also identified. 113 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Initial Environmental Examination of Wastewater Treatment PakistanPlant Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):S.I.T.E Karachi Environmentalists, Engineers and related other specialistsName of Client: No. of Staff:Hinopak Motors S.I.T.E Karachi, Pakistan Five (05) No. of Staff-Months; DurationAddress: of Assignment:D-2 Manghopir Road SITE Karachi 25 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,488 Aug 2003 Jan 2004 Rs. 275,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Tariq Soomro (EnvironmentalEngineer), Bilal Ahmed Khan, Ijaz HussainNarrative Description of Project:In order to ensure environmental compliance, Hino Pak Motors is planning to install a wastewatertreatment plant at their premises located in S.I.T.E. An IEE study was conducted by EMC to identifyand investigate the adverse impacts of the proposed project. The objective of the project is toensure safeguard of water resources and other natural resources, to improve the health quality andto enable the proponent to carry out their operations in an environmentally sustainable manner.Description of Actual Services Provided by Your Staff:Initial Environmental Examination (IEE) has been carried out to provide all necessary informationon potential environmental and social impacts at the different stages of wastewater treatmentplant; an IEE document has been prepared to meet the legislative requirement of PakistanEnvironmental Protection Act 1997. All options for impact mitigation and management for theconstruction and operation phase of the treatment plant were explored and suitablerecommendations were given regarding the same. 114 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Report on “Study into causes and effects of PakistanEutrophication in major lakes of Sindh” Professional Staff provided:Location within country: Environmental Engineers and related otherAll over Sindh (specially Thatta) specialists e.g Limnologists, Sociologists etc.Name of Client: No. of Staff:Sindh Environmental Protection Agency, Five (05)Address: No. of Staff-Months: Duration ofPlot No ST-2/1, Sector-23, Korangi Industrial AssignmentArea, Karachi 28 Staff Months, Seven (07) Start Date Completion Date Approx. value of services (in Current US$ (month/year) (month/year) & Rs): Dec 1998 Jun 1999 1.5 MillionName of association firm, if any: No. of person-months of professional NIL staff provided by associated firm: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr Syed Nadeem Arif, Dr. Iqbal Ali, Dr. Parwez Siddiqui, Mr Jawed Shah, Mr Faisal Ansari.Narrative Description of Project:Wetlands constitute valuable ecosystems that play an important role in supporting and sustaininglife on earth .In recent years there has been a growing awareness about the economic,environmental and ecological importance of wetlands. The most prevalent water quality problemaround the world is eutrophication and in order to develop management strategy a thoroughknowledge and understanding of lakes, eutrophication process and its impacts is essential.Description of Actual Services Provided by Your StaffOut of the selected lakes of Sindh, Haleji and Kinjhar lakes were studied in detail so as to determinethe nature and extent of eutrophy and overgrowth of aquatic weeds, and suggest strategy for theircontrol. From the observations it was concluded that Haleji lake which is highly infested withmacrophytes is in advance stage of eutrophy .Kinjhar lake is also facing problem of eutrophication ,both the lakes need balancing of nutrients and biological complex so as to reduce N / P loading,specially removal of phosphates through artificial and natural processes. Control of aquatic weeds isone of the measures needed for improvement of lakes. Preliminary study of other lakes like,Kalankot, Manchar, Hadero, Lungh and Drigh lake revealed that all of these lakes are facing one orother stage of eutrophy and are polluted. 115 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Review (IER) Report Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):SITE Karachi Environmentalists, Engineers, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Parke Davis Six (06) No. of Staff-Months; Duration ofAddress: Assignment:B-2 SITE Area Karachi 30 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 Feb 2000 Jul 2000 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Faisal Ansari and Mehmood A KhanNarrative Description of Project:The Initial Environmental Review (IER) was carried out for Parke Davis Pakistan Limited located inSITE. Karachi. This was done to implement EMS ISO 14000 at their facility.Description of Actual Services Provided by Your Staff:Observations were made regarding the practices against EMS ISO 14000.Implementation and trainingplan was developed, so that the company may be certified for ISO 14000 in a given period of time. 116 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services of ISO-14000 for Pfizer Pakistan Pakistan(Formerly Parke Davis) Pharmaceutical Company Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):SITE Karachi Environmentalists, Engineers, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Pfizer Pakistan Laboratories Limited Eight (08) No. of Staff-Months; Duration ofAddress: Assignment:B-2 SITE Area Karachi 96 Staff-Months, Twelve Months (12) Start Date Completion Date Approx. Value of Services (in (Month/Year) (Month/Year) Current US$ & Rs): Dec 1999 Dec 2000 US$. 12,759$Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Faisal Ansari and Mehmood A KhanNarrative Description of Project:To improve their environmental performance, Parke Davis engaged the services of EMC to implementEMS ISO 14000 at their company. The project started in December 1999 and was completed in June2000. The company successfully achieved the CertificationDescription of Actual Services Provided by Your Staff:Procedures and polices where prepared and training has been given to staff and till the certificationimprovements in the EMS system was imparted. 117 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Preparation for Surveillance Audit of ISO-14000 Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): SITE Karachi Lead Auditors, Environmental Engineers Name of Client: No. of Staff: Pfizer Pakistan Laboratories Limited Four (04) No. of Staff-Months; Duration of Address: Assignment: B-2 SITE Area Karachi 12 Staff-Months, Three Months (03) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 2,536 Sep 2001 Nov 2001 Rs. 200,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:Mr Syed Nadeem Arif (Lead Auditor), Nabila Mujahid and Mehmood A Khan Narrative Description of Project: Preparation of Surveillance Audit of ISO-14001 Description of Actual Services Provided by Your Staff: EMC has worked for the complete preparation of surveillance audit of the company, including the complete documentation and filing the non-conformances; the company has undergone the Audit successfully. 118 | P a g e
  • FIRMS EXPERIENCE Assignment Name: Country: Internal Audit for ISO 14001 Pakistan Professional Staff Provided by Location within Country: Your Firm/Entity(profiles): SITE Karachi Lead Auditors, Environmental Engineers Name of Client: No. of Staff: Pfizer Pakistan Laboratories Limited Four (04) No. of Staff-Months; Duration of Address: Assignment: B-2 SITE Area Karachi 12 Staff-Months, Four Months (04) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,170 Aug 2001 Nov 2001 Rs. 250,000 Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NIL Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:M Syed Nadeem Arif (Lead Auditor), Nabila Mujahid and Faisal Ansari Narrative Description of Project: EMC conducted series of Internal Audits at each Stage viz before the final Certification Audit and surveillance Audits. Description of Actual Services Provided by Your Staff: EMC’s Auditors have provided services to the Company, in order to maintain the system and to comply with the notion of continual improvement. These services helped Pfizer in sustaining the certification of ISO 14001 EMS 119 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services of ISO-14000 Pakistan Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalSITE Karachi Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Hino Pak. Motors Ltd Seven (07) No. of Staff-Months; DurationAddress: of Assignment:D-2 Manghopir Road SITE Karachi 44 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 Dec 2000 Jun 2001 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Iqbal Ali, Jawed Shah, Faisal Ansari, Jennifer Dean.Narrative Description of Project:Consultancy services for the implementation of ISO 14001 and certification were provided by us. OurProject at Hino Pak was a great success as we managed to establish & implement the system at theirfacility in a stipulated time period. HinoPak motors benefited from our services and have successfullyachieved the System Certification. Starting from December 2000; the project took six months for itscompletion.Description of Actual Services Provided by Your Staff:Preparation of documents related to ISO 14001 procedures and policies and trainings have beenconducted. This helped Hinopak Motors to achieve ISO 14001 EMS certification within the record timeof six months 120 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:In-House Training on ISO-14001 Pakistan Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalSITE Karachi Engineers Environmentalists, ISO 14001 EMS Specialists,Name of Client: No. of Staff:Hino Pak. Motors Ltd Five (05) No. of Staff-Months; Duration ofAddress: Assignment:D-2 Manghopir Road SITE Karachi 32 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 Dec 2000 Jun 2001 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif , Dr. Iqbal Ali, Jawed Shah, Jennifer Dean, Masoom KhanNarrative Description of Project:Consultancy services for the implementation of ISO 14001 and certification were provided by us. OurProject at Hino Pak was a great success as we managed to establish & implement the system at theirfacility in a stipulated time period. Hinopak motors benefited from our services and have successfullyachieved the System Certification. Starting from December 2000, the project took six months for itscompletion.Description of Actual Services Provided by Your Staff:Preparation of documents related to ISO 14001 procedures and policies, and trainings have beenconducted. This helped Hinopak Motors to achieve ISO 14001 EMS certification within the record timeof six months 121 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services of ISO-14000 Pakistan Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalIslamabad Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Pharmacia & Upjohn (Pvt.) Ltd Five (05) No. of Staff-Months; Duration ofAddress: Assignment:Kahuta Road, Rawalpindi. 33 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 Aug 2001 Feb 2002 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Iqbal Ali, Jawed Shah, Jennifer Dean, Bilal KhanNarrative Description of Project:Complete consultancy services were provided to Pharmacia & UpJohn (Pvt). Ltd for the establishmentand implementation of EMS ISO 14001 at their facility. The company has achieved this Certificationsuccessfully. This project was initiated in August 2001 and was completed within six months.Description of Actual Services Provided by Your Staff:Consultancy of complete implementation was included in the services along with preparation ofprocedures, policies and trainings on ISO 14001 till the certification of the company. 122 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services of ISO-14000 Pakistan Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalKorangi Karachi Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Thal Engineering (Pvt.) Ltd Five (05) No. of Staff-Months; Duration ofAddress: Assignment:Plot No. 1 & 2, Sector 22, Korangi Industrial Area, Karachi. 30 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 Apr 2001 Oct 2001 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif , Dr. Iqbal Ali, Jawed Shah, Jennifer Dean, Bilal KhanNarrative Description of Project:Thal Engineering hired our consultancy services for the establishment of EMS at their facility, and wealso providing practical solutions for their waste management. The Company has successfully achievedthe System Certificate. The Project was completed in about six months, starting from April, 2001.Description of Actual Services Provided by Your Staff:Procedures’ and Polices’ preparation, trainings and awareness programs were carried out to fullyimplement ISO-14001 till its certification. 123 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services for ISO-14000 at Al-Karam Textile Ltd. Pakistan(Processing Mill) Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, Environmental EngineersLandhi Karachi Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Al-Karam Textile Ltd Six (06) No. of Staff-Months; Duration ofAddress: Assignment:H-T/11, Landhi Industrial Area Karachi 108 Staff-Months, Eighteen Months (18) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 1,522 Jul 2001 Jan 2003 Rs. 120,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif, Dr. Iqbal Ali, Dr Agha Akbar, Jawed Shah, Jennifer Dean, Bilal KhanNarrative Description of Project:Al-Karam Textile (Pvt.) Ltd. having various departments viz, processing, weaving, spinning and garments,has hired our services for the establishment of EMS at their industry’s premises, this project is to becompleted in sections and so far processing department which is responsible for most of theenvironmental impacts has successfully achieved the system certification.Description of Actual Services Provided by Your Staff:Detail survey of the project was made, initial environmental examination of the separate processes andsections of mill were conducted, procedures and polices according to the ISO 14001 EMS Standards wereprepared and related training was provided to staff. 124 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Integrated Management system, based on OHSAS 18001 and PakistanISO 14001 Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalSITE Karachi Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Pfizer Pakistan Four (04) No. of Staff-Months; DurationAddress: of Assignment:B-2 SITE Area Karachi. 18 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,073 Dec 2003 Apr 2004 Rs. 400,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Laiq A Mashood, Tariq Soomro, Bilal KhanNarrative Description of Project:Practical implication of compulsory clausal requirements of ISO 14001 and OHSAS 18001 uponcompletion of necessary documentation and following result oriented monitoring and inspectiontechniques.Description of Actual Services Provided by Your Staff:Revision and preparation of polices and procedures according to the integrated managementsystem according to the standards of ISO 14001 EMS and OHSAS 18001 and the corporate policiesof Pfizer International. 125 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Ambient Air Quality Monitoring for Beacon House School Pakistan(Jubilee Campus) Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Korangi, Karachi Environmentalists, Engineers, Air Quality ExpertsName of Client: No. of Staff:Beacon House School ( Jubilee Campus) Five (05) No. of Staff-Months; DurationAddress: of Assignment:58-A SMCH Society, Karachi. 18 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 Jul 2000 Dec 2000 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Iqbal Ali, Mr. Faisal AnsariNarrative Description of Project:EMC was engaged to undertake a study of the current status of ambient air quality in and aroundBeacon House School Jubilee Campus located in Korangi Industrial Area Karachi.Description of Actual Services Provided by Your Staff:Sampling was carried out at four different stations and was done on a 24 hour basis for Oxides ofSulphur and nitrogen, carbon monoxide, particulate matter and ozone .Finally EMC examined thecurrent level of compliance with environmental regulations by analyzing and comparing thelaboratory results of air with the International Environmental Standards. 126 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Self Monitoring Report for Procter and Gamble Pakistan Private PakistanLimited. Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub, Baluchistan Lead auditors, Environmental EngineersName of Client: No. of Staff:Procter and Gamble Pakistan Private Limited. Four (04)Address: No. of Staff-Months; Duration4th floor, central Hotel Building, Merewether Tower (Near of Assignment:Metropole Hotel) Karachi. 8 Staff-Months, Three Months (03) Start Date Completion Date Approx. Value of Services (in (Month/Year) (Month/Year) Current US$): Dec 1999 Feb 2000 US$. 3,588Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Iqbal Ali, Faisal AnsariNarrative Description of Project:Self monitoring was carried out by EMC for P&G Pakistan Pvt. LtdDescription of Actual Services Provided by Your Staff:The self monitoring team of EMC visited the site many times and made observations of prevailingenvironmental scenario on the site; they also determined the category to which the industrybelongs to for the purpose of submitting the report. Selected parameters were sampled and tested.Guidelines of self monitoring and reporting were followed throughout the whole process. 127 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Audit for Exide Pakistan Limited Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Lead auditors, Environmental EngineersName of Client: No. of Staff:Exide Pakistan Limited Four (04) No. of Staff-Months; Duration ofAddress: Assignment:40-K Block-6 PECH Society Karachi 26 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 4,439 Mar 2000 Sep 2000 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Lead Auditor), Dr. Badar Munir Ghouri, Jawed Shah, Jennifer DeanNarrative Description of Project:Environmental Audit was carried out for Exide Pakistan Limited. The plant produces sulphuric acidThe purpose of the report was to highlight environmental impacts associated with this project and todevelop and report management plans for the impacts.Description of Actual Services Provided by Your Staff:Occupational health and safety issues were considered in depth since the sulphuric acid plant isconsidered to be one of the hazardous chemical industries; mitigation measures were suggested inthe management plan. A compliance audit has been conducted to check the application andeffectiveness of the systems existing at EPL. Compliance audit against the criteria of PEPA 1997 andSelf monitoring and reporting by industries was also done. 128 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Preliminary Hazard Analysis Report (Environmental Risk PakistanAssessment ) for Exide Pakistan Limited (Chemical Division) Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Port Qasim, Karachi Risk Assessors, Lead auditors, Environmental EngineersName of Client: No. of Staff:Exide Pakistan Limited Five (05) No. of Staff-Months; DurationAddress: of Assignment:40-k Block-6 PECH Society Karachi 20 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 May 2000 Sep 2000 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Dr. Iqbal Ali, Mehmood A Khan, Imran Khan, Faisal AnsariNarrative Description of Project:The sulphuric acid plant is located at Port Qasim Industrial Estate and its PHA has to be done inorder to check the environmental risks associated to their process.Description of Actual Services Provided by Your Staff:The consultants conducted detailed investigation to assess the hazards involved in manufacturing ofsulphuric acid. The main purpose of the study was to identify the primary possibilities of safetyhazards at the Exide Pakistan Ltd (CD) and to evaluate the adequacy of the protection systemsprovided at the plant. Suitable mitigation measures were suggested to control the accidents/worsescenarios. Emergency response plan was also developed. 129 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:EHS Audit of GE International (Habibullah Coastal Power PakistanProject). Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Quetta, Pakistan Risk Assessors, Lead auditors, Environmental EngineersName of Client: No. of Staff:Habibullah Coastal Power Project Three (03) No. of Staff-Months; Duration ofAddress: Assignment: 6 Staff-Months, Two Months (02) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,805 Apr 2004 May 2004 Rs. 300,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Lead Auditor), Imran Khan, Laiq A MashoodNarrative Description of Project:EHS Audit of GE guidelines had to be conducted for which GE US contacted us through someconsultants and asked us to audit the Quetta site against the criteria of GE EHS Guidelines. This auditlasted three days and report was prepared and submitted to the client.Description of Actual Services Provided by Your Staff:We conducted the EHS Audit and visited the site and divided the site according to eight parameters i.e.waste water, air emissions, waste management, hazardous waste transportation, safety management,industrial hygiene, chemical management and emergency preparedness and response. The site wasaudited and non-conformances were discussed with the client. This audit develops a baseline for futureefforts w.r.t. EHS continual improvements and pollution prevention efforts of GE International. 130 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Study Report on Food Waste disposal for Lasmo Oil Pakistan PakistanLimited (Bhit Camp Site). Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Bhit-Sehwan Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:ENI-LASMO Eight (08)Address: No. of Staff-Months; Duration5th floor, the Forum, G-20 Block9, Khayaban-e-Jami, Clifton of Assignment:Karachi 30 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,073 Nov 2001 Apr 2002 Rs. 400,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Jawed Shah, Jennifer Dean, TariqSoomro (Environmental Engineer)Narrative Description of Project:Lasmo Oil Pakistan Limited hired our services to prepare a detailed study report on management ofwaste water generated from their camp sites.Description of Actual Services Provided by Your Staff:EMC studied the practices adopted at the site and then recommended environmental friendlysolutions, so that the waste water may not create any environmental impacts 131 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Study Report on Waste Water Disposal /Treatment for Lasmo PakistanOil Pakistan Limited (Bhit Camp Site). Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Bhit-Sehwan Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:Eni-LASMO Eight (08)Address: No. of Staff-Months; Duration5th floor, the Forum, G-20 Block9, Khayaban-e-Jami, Clifton of Assignment:Karachi 40 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 4,439 Dec 2001 May 2002 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Mr Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Mr Jawed Shah, Mr. NiazHusain, Mr Faisal AnsariNarrative Description of Project:Lasmo Oil Pakistan Limited hired our services to prepare a detailed report for providingenvironmental friendly solutions to manage their food waste at Bhit Camp Site, Kirthar ConcessionArea.Description of Actual Services Provided by Your Staff:We studied the existing practices and keeping in view the environmental scenario provided variousmethodologies for the waste water disposal and its low cost treatment. 132 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Study of Soil Profile of Farmlands around Sehwan Treatment PakistanFacility Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Sehwan Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:Eni-LASMO Eight (08)Address: No. of Staff-Months; Duration5th floor, the Forum, G-20 Block9, Khayaban-e-Jami, Clifton of Assignment:Karachi 66 Staff-Months, Nine Months (09) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 4,439 Dec 2001 Aug 2002 Rs. 350,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Jawed Shah, Jennifer Dean, TariqSoomro (Environmental Engineer)Narrative Description of Project:The purpose of the soil study was to prepare the current soil profile of farmlands at Sehwan.Various parameters that may affect soil quality were tested and the results documented for specificion toxicity of sodium, chloride, boron and microbiological contamination of faecal origin etcDescription of Actual Services Provided by Your Staff:Study was carried out, the farmland soils at Sehwan were found to be silt - sand with clay and thushave a large capacity to accept wastewater and maintain aerobic environment, avoiding blockage ofsoil pores. Tests have indicated presence of oil & grease in farmland soils, which has affected thenormal soil mechanisms and disturbed the soil’s natural environment. We conducted this study toform the basis for re-utilization of treated water from Sehwan Treatment Facility in the Farmlands. 133 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Noise Study of BP’s Facilities at Badin Concession Area Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Badin Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:BP Pakistan Nine (09) No. of Staff-Months; DurationAddress: rd of Assignment:3 Floor Bahria Complex, 24-MT Khan Road, Karachi 48 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 5,707 Oct 2002 Mar 2003 Rs. 450,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Mehmood A Khan, Tariq Soomro(Environmental Engineer), S Abdul QadirNarrative Description of Project:The aim of study was to carry baseline survey of noise levels within facility vis-à-vis establish noisemaps of BP facilities at Badin Concession Area, the study found out that out of seventeen sites, highnoise were observed at seven sites which need to be addressed immediately as compared to otherten sites. The priority sites are Mazari, Golarchi, Ghungro, Turk, Bukhari, Khaskheli and Liari Rig(site). To reduce the noise hazards in the facilities, measures like barriers, noise absorbents andHearing Protective Devices (HPDs) are recommended as per the situation prevalent in the facilities.While recommending the control measures, emphasis is given on protecting the areas whereexposed operational staff is exposed to noise throughout shift.Description of Actual Services Provided by Your Staff:Survey has been conducted in which noise levels were recorded at each source in all facilities understudy and noise maps showing the actual intensity were made and handed over to BP in CADformat for any further change in future. 134 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Impact of Wastewater Irrigation on the Groundwater at PakistanNaganwall near ENI-LASMO Bhit Camp Site. Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Bhit-Naganwall Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:ENI-LASMO Paksitan Five (05)Address: No. of Staff-Months; Duration5th floor, the Forum, G-20 Block9, Khayaban-e-Jami, Clifton of Assignment:Karachi 18 Staff-Months, Four Months (04) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 3,170 Dec 2001 Mar 2002 Rs. 250,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Jawed Shah, Jennifer Dean, Faisal Ansari, Tariq Soomro(Environmental Engineer)Narrative Description of Project:Theme of this study was to assess the impact of the black water on the groundwater contamination(waste water released from ENI-LASMO base camp and used in raw form for raising agriculturalcrops at Naganwall).Description of Actual Services Provided by Your Staff:A study was conducted through tests and for this purpose tests carried out were (i) field infiltrationtest (ii) Permeability test (iii) soil properties test and (iv) Determination of the consumptive use ofwater for the agricultural crops raised on such farmlands. Besides, the total depth to which suchwater had percolated into the soil (ignoring the losses on the way) came out to be 24 feet asagainst the depth of groundwater determined as 42 feet. It was safely deduced that there is nopossibility of contamination due to the use of Black waste water at the farmlands at Naganwall. Thisreport was the key stone for further recycling of water in that region by ENI-Lasmo. 135 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Waste Water Treatment Plant at Thal Engineering Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Korangi Karachi Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:Thal Engineering (Pvt) Ltd. Twelve (12) No. of Staff-Months; Duration ofAddress: Assignment:Plot No. 1 & 2, Sector 22 Korangi Industrial Area, Karachi 75 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 12,683 May 2002 Nov 2002 Rs. 1,000 ,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Jawed Shah, Tariq Soomro, Mehmood Khan, Sarwar Khan, BilalKhanzadaNarrative Description of Project:Thal Engineering used to discharge their effluents in septic pit as there was no sewerage system in thatIndustrial area. Their waste water was not meeting the local NEQS standards. They wanted to installWaste Water Treatment Plant (WWTP) and for that they contacted EMC.Description of Actual Services Provided by Your Staff:EMC staff analyzed their water and suggested suitable technology which was not only suitable to thesystem but also cost effective. In this system the water is to be recycled and reused for Gardeningpurpose. We installed a WWTP on turn key basis and after commissioning of this system the resultsmet the NEQS Standards. This treatment plant is very cost effective and old tanks were utilized toreduce the cost of construction. It is now successfully running and can be visited anytime forinspection. 136 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Waste Water Treatment Plant at Hinopak Motors Limited Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Korangi Karachi Environmental Engineers, Scientists and other specialistsName of Client: No. of Staff:Hinopak Motors Limited. Eight (08) No. of Staff-Months; Duration ofAddress: Assignment:D-2 Manghopir Road SITE Karachi 51 Staff-Months, Seven Months (07) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 12,683 Aug 2003 Feb 2004 Rs. 1,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Jawed Shah, Tariq Soomro (Environmental Engineer), Bilal Khan,Imran KhanNarrative Description of Project:Designing and installation of appropriate wastewater treatment system for the automobile industryDescription of Actual Services Provided by Your Staff:Tests were made to find suitable solution and finally activated sludge systems were found to beappropriate; thus design and installation of activated sludge system has been carried out. 137 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:DAF (Dissolved Air Flotation) Unit for Wastewater Treatment of PakistanCadbury Pakistan Limited Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub Baluchistan Environmental Engineers, scientists and other specialistsName of Client: No. of Staff:Cadbury Pakistan Limited Five (05) No. of Staff-Months; Duration ofAddress: Assignment:A-60, HITE, Hub, Baluchistan 43 Staff-Months, Nine Months (09) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 25.367 Jan 2003 Sep 2003 Rs. 2,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved and FunctionsPerformed:Syed Nadeem Arif (Project Manager), Dr. Iqbal Ali (Hydrologist), Mehmood Khan, Sarwar Khan, AbdulQadirNarrative Description of Project:Installation and design of DAF unit for wastewater treatment at Cadbury was carried out; due to theexcess amount of oil and fat contained in the wastewater DAF was identified as the best solution.Description of Actual Services Provided by Your Staff:Design and installation of dissolved air flotation unit for food industry, this unit was indigenouslydesigned by the EMC Engineers and tremendously reduced the cost of the overall project. 138 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Environmental Monitoring/Management Plan Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Islamabad Environmental Engineers, scientists and other specialistsName of Client: No. of Staff:Lilly International (Pvt) Limited Five (05) No. of Staff-Months; DurationAddress: of Assignment:Panorama Centre-2, Fatima Jinnah Road Karachi 130 Staff- Months, Twenty Six Months (26) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 7,610 Jan 2006 May 2008 Rs. 600,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif Project Manager), Faraz Ahmed Khan (Environmentalist), Samreen Siddiqui(Environmentalist), Khurheed Ali (Environmental Engineer)Narrative Description of Project:Lilly International (Pvt) Limited is an engineering firm for which EMC has successfully preparedEnvironmental Monitoring /Management Plan for Ubauro-Shaikh Wahan and Turnol-ChablatSection in March 2008.Description of Actual Services Provided by Your Staff:To identify and assess the changes in environmental parameters, monitoring program wasdeveloped by EMC and monthly monitoring was carried out at the relevant sites by the consultantto evaluate the quality of ambient air, noise, wastewater, drinking water and soil. NEQS, USEPA andWHO standards were followed for these monitoring activities. 139 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Recycling of solvent (111-TCE) used for degreasing Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Korangi Karachi Environmental Engineers, ScientistsName of Client: No. of Staff:Thal Engineering (Pvt.) Ltd Three (03) No. of Staff-Months; DurationAddress: of Assignment:Plot No. 1 & 2, Sector 22, Korangi Industrial area, Karachi. Same Month Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 2004 2004 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Laiq Mashhood(Environmental Engineer)Narrative Description of Project:The Thal Engineering is Car Air-condition manufacturing industry and they were keen to disposeoff the solvent named Tri Chloro Ethylene (TCE) used for degreasing of equipments. WMC withthe help of PCSIR laboratory recycled the solvent which was later utilized by Thal Engg again intheir process. This saved them millions of rupees and also earned them a good name as anenvironmental friendly company.Description of Actual Services Provided by Your Staff:The strategies for disposing off the solvent in an environmental friendly and cost effective mannerwere identified, explored and assessed by the consultant firm. The methodology involved laboratoryanalysis and review of the recycling and disposal options available. A commercially andenvironmentally feasible disposal strategy was introduced to the client that enhanced the costeffectiveness of their operations. 140 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Disposal and incineration of Chemicals, Dyes, and waste oil Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Landhi Karachi Environmental Engineers, ScientistsName of Client: No. of Staff:Al-Karam Textile Ltd Six (06) No. of Staff-Months; DurationAddress: of Assignment:H-T/11, Landhi Industrial Area Karachi Same Month Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,976 2004 2004 Rs. 550,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Laiq Mashhood(Environmental Engineer)Narrative Description of Project:Al-Karam Textile is one the leading textile industries in Pakistan producing different types ofcloths, mainly exporting its product to European market. The use of chemicals and dyes areinevitable for the production of cloths. After analyzing their waste, incineration was sorted out asthe best suitable option for disposal of waste chemicals and dyes. This waste was incinerated intothe cement kiln and exhaust emissions were tested to monitor air contamination.Description of Actual Services Provided by Your Staff:The disposal strategies for chemicals and dyes’ were identified and evaluated. The best suitableoption was selected and implemented. Testing of resultant emissions was done to monitor the aircontamination. 141 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Recycling of Waste Oil Sludge Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Badin Concession Area Environmental Engineers, ScientistsName of Client: No. of Staff:BP Pakistan Nine (09) No. of Staff-Months; DurationAddress: rd of Assignment:3 Floor Bahria Complex, 24-MT Khan Road, Karachi Same Month Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 8,878 2004 2004 Rs. 700,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed: Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Laiq Mashhood(Environmental Engineer)Narrative Description of Project:The British Petroleum is engaged in the exploration and production of oil and gas from the BadinConcession Area, required the services of WMC for the disposal of its oil sludge in environmentalfriendly manner. After studying the characteristics of oil sludge solution, use of cement kiln wasrecommended and the oil sludge has been utilized and recycled into cement kiln as alternativefuel.Description of Actual Services Provided by Your Staff:Various disposal options were assessed to identify the one that does not pose any risk to theenvironment. A thorough analysis of the characteristics of the oil sludge was conducted by theconsultants and based on its findings; the most feasible disposal strategy was selected forimplementation. 142 | P a g e
  • FIRMS EXPERIENCEAssignment Name:Consultancy Services for the establishment of Integrated Country:Management System, based on OHSAS 18001 and ISO 14001 Pakistan– 2004 Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalKarachi Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:BP Pakistan Nine (09) No. of Staff-Months; DurationAddress: rd of Assignment:3 Floor Bahria Complex, 24-MT Khan Road, Karachi 38 Staff-Months, Five Months (05) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 12,683 Nov 2004 Mar 2005 Rs. 1,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Laiq Mashhood(Environmental Engineer)Narrative Description of Project:Practical implication of compulsory clausal requirements of Safety & Security Management SystemsOHSAS 18001 and Environmental Management System ISO 14001 – 2004 upon completion ofnecessary documentation and following result oriented monitoring and inspection techniques.Description of Actual Services Provided by Your Staff:Environmental aspects, impacts and associated regulatory requirements were identified for theoperations conducted by the client. The requisite documentation, inspection and monitoringprocedures were completed and an Integrated Management System was devised for ensuringenvironmental safeguard and occupational health and safety. 143 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services for the establishment of ISO 9001 – Pakistan2000 and ISO 17025 systems Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalAlmeida, Ethiopia Engineers Environmentalists, ISO SpecialistsName of Client: No. of Staff:Almeida Textiles (Private) Limited Four (04) No. of Staff-Months; DurationAddress: of Assignment:Ethiopia Same Month Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 12,683 2005 2005 Rs. 1,000,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Laiq A Mashhood, Farhan Vohra, Mehmood A KhanNarrative Description of Project:Establishment, Implementation and Compliance of Quality Management Systems includes ISO9001 – 2000 and Laboratory Management System i.e. ISO 17025 certificationDescription of Actual Services Provided by Your Staff:Consultancy services were provided to enable the client to ensure consistent compliance toenvironmental standards and to achieve objectives such as optimum quality control andmanagement. 144 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Disposal of waste flavored chemicals Pakistan Professional Staff Provided byLocation within Country: Your Firm/Entity(profiles):Hub Baluchistan Environmental Engineers, scientists and other specialistsName of Client: No. of Staff:Cadbury Pakistan Limited Five (05) No. of Staff-Months; DurationAddress: of Assignment:A-60, HITE, Hub, Baluchistan Same Month Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 6,341 2005 2005 Rs. 500,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif (Project Manager), Tariq Soomro (Environmental Engineer), Laiq A Mashhood(Environmental Engineer)Narrative Description of Project:The Cadbury Pakistan is a food industry producing various ranges of chocolates and usesflavored chemicals to enhance the taste and smell of its product. The flavored chemical wasexpired and we suggested incineration at cement kiln and performed this activity according tothe norms and procedures of EMC.Description of Actual Services Provided by Your Staff:The expired flavored chemical was disposed by incineration in accordance with relevant establishedprocedures. 145 | P a g e
  • FIRMS EXPERIENCEAssignment Name: Country:Consultancy Services for the establishment of Integrated PakistanManagement System, based on OHSAS 18001 Professional Staff Provided by Your Firm/Entity(profiles):Location within Country: Lead Auditors, EnvironmentalS.I.T.E Karachi Engineers Environmentalists, ISO 14001 EMS SpecialistsName of Client: No. of Staff:Hinopak Motors Limited. Eight (08) No. of Staff-Months; DurationAddress: of Assignment:D-2 Manghopir Road SITE Karachi 50 Staff-Months, Six Months (06) Approx. Value of Services (in Start Date Completion Date Current US$ & Rs): (Month/Year) (Month/Year) US$. 7,610 2005 2005 Rs. 600,000Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided by Associated NIL Consultants: NILName of Senior Staff (Project Director/Coordinator, Team Leader) Involved andFunctions Performed:Syed Nadeem Arif, Tariq Soomro, Laiq A MashhoodNarrative Description of Project:Practical implication of compulsory clausal requirements of Safety & Security Management SystemsOHSAS 18001 upon completion of necessary documentation and following result orientedmonitoring and inspection techniques.Description of Actual Services Provided by Your Staff:Consultancy services were provided to enable the client to ensure consistent compliance toestablished safety standards and to examine and evaluate the existing occupational health andsafety practices. The requisite documentation, inspection and monitoring procedures werecompleted and an Integrated Management System was devised for effective Safety and SecurityManagement. 146 | P a g e