Medsolar SpA Medsolar S.p.A. Via Tiberio Claudio Felice, 50 84131 Salerno, Italy Phone.+39 0899488001 Fax+39 0899488030 [e...
 
Medsolar is a newborn company that operates in the field of renewable energies and particularly in the production of photo...
Medsolar owns the entire lot area that measures about 100.000 m 2  of which 30.000 m 2  are today covered and used. In 201...
<ul><li>Medsolar is currently producing photovoltaic modules made of mono and polycristralline cells with a production cap...
 
 
 
 
 
Medsolar project started with an idea by Meridie, the first Investment Company set up to promote the development and growt...
Detailed description of the line <ul><li>Full line supplied by 3 S (Swiss Solar Systems AG , a member of Meyer Burger Grou...
<ul><li>Laminating Line NG3622XL;cycle time:5.5 minutes per lamination </li></ul><ul><li>Corner lift 90° with positioning ...
Upcoming SlideShare
Loading in …5
×

Gianni Lettieri - Medsolar project

844 views

Published on

Gianni Lettieri - Medsolar project

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
844
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Gianni Lettieri - Medsolar project

  1. 1. Medsolar SpA Medsolar S.p.A. Via Tiberio Claudio Felice, 50 84131 Salerno, Italy Phone.+39 0899488001 Fax+39 0899488030 [email_address] www.medsolar.it
  2. 3. Medsolar is a newborn company that operates in the field of renewable energies and particularly in the production of photovoltaic modules. Medsolar is located in the industrial area of Salerno. Salerno is a sunny town in the South of Italy, natural site for the realization of large photovoltaic installations thanks to its excellent solar irradiation. There is also a fully equipped industrial port for moving goods and raw materials. Furthermore in Salerno is based the famous DEIE ( Department of Electrical and Information Engineering) of the University of Salerno, one of the most leader in Italy in the research in the photovolatic field.
  3. 4. Medsolar owns the entire lot area that measures about 100.000 m 2 of which 30.000 m 2 are today covered and used. In 2012, 15.000 m 2 of the remaining 70.000 m 2 will be covered and equipped according to the factory enlargement. The total plant surface is of about 25.000 m 2 (production area), while the administrative and the commercial buildings are about 2.400 m 2 .
  4. 5. <ul><li>Medsolar is currently producing photovoltaic modules made of mono and polycristralline cells with a production capacity of 50 MW per year. </li></ul><ul><li>Medsolar has a line up installation composed of the best technologies available on the market for the modules manufacture: </li></ul><ul><li>Glass Washing Machine from Triulzi; </li></ul><ul><li>Stringer Rapid Two from Somont; </li></ul><ul><li>Laminator of New Generation from 3S; </li></ul><ul><li>Conveyor systems from Rimas; </li></ul><ul><li>Solar Simulator from Pasan. </li></ul>
  5. 11. Medsolar project started with an idea by Meridie, the first Investment Company set up to promote the development and growth of SME in Southern Italy by offering them strategic finance consultancy. Medsolar, 100% owned by Meridie, is founded on solid basis and can rely on its vast and well-tried experience of management in the technical and economic financial fields. Corporate structure
  6. 12. Detailed description of the line <ul><li>Full line supplied by 3 S (Swiss Solar Systems AG , a member of Meyer Burger Group), for the production of PV modules with 5” or 6” cells multi or monocristalline; current capacity 25Mw/year (module size max 2000x1100 cm) increasable at 50 Mw/year adding only one stringer. </li></ul><ul><li>Manual glass balancer (column lift) </li></ul><ul><li>Glass washing machine by Triulzi including Osmose station </li></ul><ul><li>Corner lift 90° 1 laminate </li></ul><ul><li>Transport belt to buffer </li></ul><ul><li>LIFO buffer, for 16 glass plates </li></ul><ul><li>Automatic foil cutting and placing EVA 1 by Robust </li></ul><ul><li>Transport with walk-through by Rimas </li></ul><ul><li>Transport belt to stringer </li></ul><ul><li>Stringer Somont Rapid Two (Layup FOUR): capacity 1200 cells/hour </li></ul><ul><li>String Vision </li></ul><ul><li>Transport belt </li></ul><ul><li>Manual Interconnection station </li></ul><ul><li>Foil deployment EVA2 and Backsheet, including transport from foil cutter by Robust </li></ul><ul><li>Placement position EVA2, Backsheet and visual inspection </li></ul><ul><li>Corner lift 90° with positioning </li></ul><ul><li>Corner lift 2 laminates </li></ul>
  7. 13. <ul><li>Laminating Line NG3622XL;cycle time:5.5 minutes per lamination </li></ul><ul><li>Corner lift 90° with positioning </li></ul><ul><li>Corner lift 2 laminates </li></ul><ul><li>Belt to backend section </li></ul><ul><li>Flip over for visual inspection sunny side and centring </li></ul><ul><li>Position for trimming, visual inspection and manual rotation of laminate 90° </li></ul><ul><li>Walking beam transport section </li></ul><ul><li>Lift/turn table for taping </li></ul><ul><li>Lift/turn table for placing junction box, 1st position </li></ul><ul><li>Lift/turn table for placing junction box, 2nd position </li></ul><ul><li>Semi-automatic framer for modules with tape and corner keys; laminate load automatically; frame load manual; fit for standard sizes </li></ul><ul><li>Automatic edge smoothing unit </li></ul><ul><li>Manual contacting for flash, automatic flip over into flasher </li></ul><ul><li>Flasher tower fit for Pasan flasher, automatic decontacting Sun Simulator Pasan IIIc </li></ul><ul><li>Belt for final cleaning and inspection </li></ul><ul><li>Manual glass balancer (column lift) </li></ul>

×