CONTENT 
1. BLACK TOP 
•1.1 INTODUCTION 
•1.2 CONSTRUCTION TECHNIQUES OF BITUMINOUS CONSTRUCTION 
2. CONCRETE PAVEMENT 
•2.1 INTRODUCTION 
•2.2 CONSTRUCTION STEPS FOR CEMENT CONCRETE PAVEMENT SLAB 
3. EQUIPMENTS USED FOR ROAD CONSTRUCTION 
•3.1 INTRODUCTION 
•3.2 EQUIPMENTS 
4. HILLY ROAD 
•4.1 INTRODUCTION 
•4.2 FEATURES OF HILLY ROAD
1. BLACK 
TOP
1.1 Introduction 
The black top construction is in extensive use in developing nations like 
India, where the cement as a construction material is in great demand 
for large number of other engineering projects. Depending on traffic 
demands , stage development is also possible in the case of bituminous 
roads. Bituminous pavements are in common use in India and abroad. 
It is possible to construct relatively thin bituminous pavement layers 
over an existing pavement. Therefore, these are commonly adopted as 
wearing course. Flexible pavement could be strengthened in stages by 
constructing bituminous pavement layers one after another in a certain 
period of time unlike the cement concrete pavement construction.
1.2 Construction Techniques Of Bituminous Construction 
The following construction techniques are in use:- 
Interface treatments like prime coat and tack 
coat. 
Surface dressing and 
Seal coat.
Interface treatment 
Surface of the existing pavement layer is to be 
cleaned to remove dust and dirt and a thin 
layer of bituminous binder is to be sprayed 
before the construction of any type of 
bituminous layer over this surface. This 
treatment with bituminous material is called 
interface treatment which is necessary to 
provide the necessary bond between the old 
and the new layers. The interface treatment 
may either be a prime coat or tack coat and 
in some cases, the prime coat followed by a 
tack coat.
PRIME COAT 
Bituminous prime coat is the first application of 
a low viscosity liquid bituminous material over 
an existing porous or absorbent pavement 
surface like the WBM base course. The main 
object of priming is to plug in the capillary 
voids of the porous surface and to bond the loose 
mineral particles on the existing surface, using 
a binder of low viscosity which can penetrate 
into the voids. The bituminous primer is 
sprayed uniformly using a mechanical sprayer 
at a rate of 7.3 to 14.6 kg/m2 area, depending on 
the porosity of the surface. The primed surface is 
allowed to cure for at least 24 hours, during 
which period no traffic is allowed.
TACK COAT 
Bituminous tack coat is the application of 
bituminous material over an existing 
pavement surface which is relatively 
impervious like an existing bituminous 
surface or a cement concrete pavement or a 
pervious surface like WBM which has 
already been treated by a prime coat. Tack 
coat is usually applied by spraying 
bituminous material of higher viscosity like 
the hot bitumen at the rate of 4.9 to 9.8 
kg/m2 area depending in the type of the 
surface.
BITUMINOUS SURFACE DRESSING 
Bituminous Surfacing Dressing (BSD) is provided over an existing pavement to serve as thin 
wearing coat. The single coat surface dressing consists of a single application of bituminous 
binder material followed by spreading of aggregate cover and rolling. The principal of this 
method is illustrated in fig: 
When the surface dressing is similarly done in two layers, it is called ‘two coat bituminous 
surface dressing’. Where better adhesion is required, aggregates pre-coated with bituminous 
binder are used instead of conventional surface dressing and this technique is called 
‘Bituminous Surface Dressing with Pre-coated Aggregates’. The main functions of BSD 
are:- 
• To serve as a thin wearing course of pavement and to protect the base course. 
• To water proof the pavement surface and to prevent infiltration of surface water. 
• To provide dust-free pavement surface in dry weather and mud-free pavement in wet 
weather.
SEAL COAT 
The seal coat is a very thin surface treatment or a single coat surface 
dressing which is usually applied over an existing black top surface. A 
premixed sand bitumen (hot mix) seal coat is also commonly used over 
the premixed carpet .Seal coat is usually recommended as a top coat 
over certain bituminous pavements which are not impervious, such as 
open graded bituminous constructions like premixed carpet and 
grouted macadam. Seal coat is also provided over an existing 
bituminous pavement which is worn out. The main functions of seal 
coat are: 
 To seal the surfacing against the penetration of water. 
 To develop skid resistance texture. 
 To enliven an existing dry or weathered bituminous surface.
2.CONCRETE 
PAVEMENT
INTRODUCTION 
The cement concrete pavement maintains a very high recognition 
among the engineer and the road users alike. Due to the excellent 
riding surface and pleasing appearance, the cement concrete roads 
are very much preferred. It is also a matter of fact that the life of 
cement concrete road is much more than any other type of 
construction. This is why the engineers have inherent confidence in 
the use of cement concrete for any kind of construction project.
Construction procedure of concrete slab 
Preparation of subgrade and sub-base: 
The subgrade or sub-base for laying of the concrete slabs 
should comply with the following- 
 that no soft spots are present in the subgrade or sub-base. 
that the uniformly compacted subgrade or sub-base 
extends at least 30cm on either side of the width to be 
connected. 
that the subgrade is properly drained. 
that the minimum modules of subgrade reaction obtained 
with a plate bearing test is 5.54 kg/cm2.
Placing of forms: 
The steel or wooden forms are used for this purpose . The steel 
forms are of M.S. channel section and their depth is equal to the 
thickness of the pavement. When set to grade , the maximum deviation 
of the top surface of any section from a straight line is not exceeded by 
3mm. 
wooden forms are dressed on side ; these have minimum base 
width of thickness of 10 cm for slab thickness of 20 cm and minimum 
base width of 15 cm for slabs over 20 cm thick. They should not deviate 
more than 3 mm froma straight edge of 3 m in length.
Batching andmixing : 
After determining the proportion of ingredients for the field mix, the fine 
aggregates and coarse aggregates are proportioned by weight in a weight-batching 
plant and placed into the hopper along with the necessary quantity of cement . 
The mixing of concrete is done in a batch mixer which will ensure a 
uniform distribution of the materials throughout the mass, so that the mix is 
uniformin color and is homogenous. 
The batch of cement, fine aggregate and coarse aggregate is led together 
into the mixer. The water for mixing in introduced into the drum within the first 15 
seconds of mixing. The mixing of each batch is commenced within 1 and ½ minute 
after all the materials are placed in the mixer.
Transporting and placing of concrete: 
The cement concrete is mixed in 
quantities required for immediate use and is 
deposited on the soil sub grade or sub-base to the 
required depth and width of the pavement 
section within the form work in continuous 
operation. Care is taken to see that no 
segregation of materials results while the 
concrete is being transported from the mixer to 
its placement. The spreading is done uniformly.
Compaction and finishing: The surface of pavement is 
compacted either by means of a power-driven finishing 
machine or by a vibrating hand screed. For areas where 
the width of the slab is very small as at the corner of 
road junctions, etc., hand consolidation and finishing 
may be adopted. 
 Concrete as soon as placed, is struck off uniformly 
and screened to the crown and cross-section of the 
pavement to conformthe grade. 
 The tamper is placed on the side forms and is 
drawn ahead in combination with a series of lifts 
and drops to compact the concrete.
CURING OF CEMENT CONCRETE 
The entire pavement surface of the newly laid cement concrete is cured in accordance with the 
following methods: 
INITIAL CURING: The surface of the pavement is entirely covered with burlap ,cotton or jute 
mates .prior or being placed, the mates thoroughly saturated with water and are placed with the 
wet side down to remain in intimate contact with the surface. 
FINAL CURING : The final curing is done with any one of the following methods: 
Curing with wet soil exposed edges of the slab are banked with a soil berm. A blanket of sandy 
soil free from stones is placed .The soil is thoroughly kept saturated with water for 14 days. 
IMPERVIOUS MEMBRAME METHOD: Use of an impervious membrane which does not impart 
a slippery surface to the payment is used. Liquid is applied under pressure with a spray nozzle to 
cover the entire surface with a uniform film. It hardens with 30 minutes after its application. The 
liquid is applied immediately after the surface finishing.
3. EQUIPMENTS USED 
FOR ROAD 
CONSTRUCTION
The Crawler Tractor 
A construction vehicle that moves on 
tracks instead of wheels. The tracks 
spread the vehicle’s weight over a larger 
surface area, enabling the tractor to exert 
a lower force per unit area on the ground. 
This allows the tractor to safely traverse 
over moister ground.. When a dozer blade 
is attached to the front of the crawler 
tractor it is commonly known as a 
"bulldozer". With a loader attachment, it 
becomes a crawler loader.
The Hydraulic Excavator 
The hydraulic excavator is most commonly used 
for digging rocks and soil, but with its many 
attachments it can also be used for cutting steel, 
The hydraulic excavator are used for 
breaking concrete, drilling holes in the earth, 
laying gravel onto the road prior 
to paving, crushing rocks, steel, and concrete, and 
even mowing landscapes. Hydraulic excavators 
have an operating weight of 20,000 pounds (9,072 
kg) or higher.
Motor Scraper 
Motor scrapers, also known as self-propelled 
scrapers, are large motorized 
machines used for digging, hauling and 
leveling out materials in a variety 
of construction jobs. Running on 
massive rubber tires, these machines 
quickly move large quantities of earth 
around a construction site.
The Wheel Loader 
The wheel loader, also known as a front end 
loader or bucket loader, is one of the most 
widely used machines in construction today 
and is noted for its extreme versatility and 
payload capacity to perform multiple tasks 
at a low cost. Wheel loaders are primarily 
used in construction applications such as 
material handling, digging, load-and-carry, 
road building, and site preparation. 
Some models even come in waste handling 
versions.
The Motor Grader 
A motor grader, known as patrol, or maintainer, is a 
piece of heavy machinery used to create a smooth, 
wide, flat surface. Traditionally, the grader is used 
for road maintenance its main function is to flatten 
surfaces before the application of asphalt. Presently, 
these machines are also commonly used for fine 
grading, spreading, and earthmoving. They can be 
used for clearing debris and brush, as well as for 
snow removal. A variety of attachments convert the 
motor grader into a more versatile machine, 
enabling the machine to do things such as dig 
shallow holes.
The Rollers 
Rollers are used to compact loose 
foundation, such as soil , 
gravel, asphalt, 
and bituminous materials and are 
primarily used 
for construction or agriculture appl 
ications. The rolling process ensures 
that foundations are compacted 
thoroughly so the materials are 
solid and do not come loose.
The Compactors 
Compactors are machines frequently used 
to compact materials such as soil in order to 
increase its density for construction. In 
addition, compactors are utilized in landfill 
tasks. Common varieties are plate tampers 
(also known as rammers), vibratory plates, 
compactors (also known as tamping foot 
rollers), and vibratory pad foot compactors.
Asphalt Road Paver 
A paver is an engineering vehicle 
used to lay asphalt on roadways. It is 
normally fed by a dump truck. A 
separate machine, a roller, is then 
used to press the hot asphalt mix, 
resulting a smooth, even surface. 
The sub-base being prepared by use 
of a grader to trim crushed stone to 
profile after rolling
4. HILLY ROADS
4.1 Introduction 
Hilly regions have steep topography, difficult and 
hazardous terrain, high altitude areas and extreme 
climatic conditions. Planning, alignment, design, 
construction and maintenance of roads in hilly terrain 
are quite different and pose difficult problems in 
comparison to those for roads in plain terrain. Roads 
passing through such hilly terrain and leading to 
towns and villages located on hills are called ‘hill 
roads’.
4.2 Features of hilly roads 
As far as possible the hill road should be aligned along the 
stable side of the hill slope in order to prevent future land-slides 
and related problems after the construction of the hill road. 
In order to limit the gradient, the length of the hill road is 
increased by planning zigzag alignment of the road. 
An effective surface and sub-surface drainage system is to be 
planned, designed and constructed in order to keep the road 
stretches safe without getting washed out during heavy rains. 
Also a large number of cross drainage structures such as 
culverts and bridges are required to enable the streams and 
rivers to cross the road, without causing damages to the hill 
road.
Prepared and presented by- 
} 
} 
} 
 KENEDDY NARZARY(CIT/11/CT/013) 
 RAJU BRAMHA (CIT/12/CT/020) 
 PURNA ABHILASH MALLICK 
(CIT/12/CT/003) 
 MURARI KUMAR (CIT/12/CT/013) 
 ROSEY BARO (CIT/12/CT/017) 
 JEWMA DAIMARY (CIT/12/CT/024) 
BLACK TOP 
CONCRETE 
PAVEMENT 
EQUIPMENTS USED FOR 
ROAD CONSTRUCTION 
} 
 SHIVAM CHOUDHARY (CIT/12/CT/ET/029) 
 DEBRAJ DAS (CIT/12/CT/010) 
HILLY ROADS

More Related Content

What's hot

Highway geometric design
Highway geometric designHighway geometric design
Highway geometric designNikunj Hindocha
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
BITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTBITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTNischay N Gowda
 
Importance of highway maintenance
Importance of highway maintenanceImportance of highway maintenance
Importance of highway maintenanceDharmesh Vadher
 
Marshall mix design method by ravindra c
 Marshall mix design method by ravindra c Marshall mix design method by ravindra c
Marshall mix design method by ravindra cŔąvî Bøňđ
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysRaghupathi Kandiboina
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptxEmaan Sharma
 
Roads design as per IRC 37
Roads design as per IRC 37Roads design as per IRC 37
Roads design as per IRC 37Amardeep Singh
 
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...VATSAL PATEL
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Group index method
Group index methodGroup index method
Group index methodUsama Aslam
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - ISachin Kulkarni
 
Geometric design of highways
Geometric design of highways Geometric design of highways
Geometric design of highways akshaydesai76
 
highway engineering/ transportation engineering-I
highway engineering/ transportation engineering-Ihighway engineering/ transportation engineering-I
highway engineering/ transportation engineering-ISubrat Padhy
 

What's hot (20)

Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
BITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTBITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPT
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Importance of highway maintenance
Importance of highway maintenanceImportance of highway maintenance
Importance of highway maintenance
 
Marshall mix design method by ravindra c
 Marshall mix design method by ravindra c Marshall mix design method by ravindra c
Marshall mix design method by ravindra c
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghways
 
Pavement
PavementPavement
Pavement
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptx
 
Roads design as per IRC 37
Roads design as per IRC 37Roads design as per IRC 37
Roads design as per IRC 37
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Group index method
Group index methodGroup index method
Group index method
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Geometric design of highways
Geometric design of highways Geometric design of highways
Geometric design of highways
 
highway engineering/ transportation engineering-I
highway engineering/ transportation engineering-Ihighway engineering/ transportation engineering-I
highway engineering/ transportation engineering-I
 

Viewers also liked

Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...Bayar Tsend
 
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...Hossam Shafiq I
 
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsions
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and EmulsionsIntroduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsions
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsionschipseal
 

Viewers also liked (6)

Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
 
Interface treatment
Interface treatmentInterface treatment
Interface treatment
 
0137033451 pp8
0137033451 pp80137033451 pp8
0137033451 pp8
 
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
 
Toni Carroll - Superpave in California
Toni Carroll - Superpave in CaliforniaToni Carroll - Superpave in California
Toni Carroll - Superpave in California
 
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsions
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and EmulsionsIntroduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsions
Introduction to Slurry Seal - Todd Vargason, Ergon Asphalt and Emulsions
 

Similar to Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)

constructionofflexiblep.pptx
constructionofflexiblep.pptxconstructionofflexiblep.pptx
constructionofflexiblep.pptxDrSKChoudhary2
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptxWajehUlHassan
 
Concrete (types of road)
Concrete (types of road)Concrete (types of road)
Concrete (types of road)Ali Rizgar
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxJaySinghchib1
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas Anshul Shakya
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and PracticeSenthamizhan M
 
Finishing works Part 1.pptx
Finishing works Part 1.pptxFinishing works Part 1.pptx
Finishing works Part 1.pptxSandipPaul46
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07aryan kumar
 
Properties of concrete 1
Properties of concrete 1Properties of concrete 1
Properties of concrete 1TaseerBaloch1
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. IGauri kadam
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdfAbhi858562
 

Similar to Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2) (20)

constructionofflexiblep.pptx
constructionofflexiblep.pptxconstructionofflexiblep.pptx
constructionofflexiblep.pptx
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
Concrete (types of road)
Concrete (types of road)Concrete (types of road)
Concrete (types of road)
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
Unit 6..pptx
Unit 6..pptxUnit 6..pptx
Unit 6..pptx
 
Finishing works Part 1.pptx
Finishing works Part 1.pptxFinishing works Part 1.pptx
Finishing works Part 1.pptx
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Properties of concrete 1
Properties of concrete 1Properties of concrete 1
Properties of concrete 1
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdf
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 

Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)

  • 2. CONTENT 1. BLACK TOP •1.1 INTODUCTION •1.2 CONSTRUCTION TECHNIQUES OF BITUMINOUS CONSTRUCTION 2. CONCRETE PAVEMENT •2.1 INTRODUCTION •2.2 CONSTRUCTION STEPS FOR CEMENT CONCRETE PAVEMENT SLAB 3. EQUIPMENTS USED FOR ROAD CONSTRUCTION •3.1 INTRODUCTION •3.2 EQUIPMENTS 4. HILLY ROAD •4.1 INTRODUCTION •4.2 FEATURES OF HILLY ROAD
  • 4. 1.1 Introduction The black top construction is in extensive use in developing nations like India, where the cement as a construction material is in great demand for large number of other engineering projects. Depending on traffic demands , stage development is also possible in the case of bituminous roads. Bituminous pavements are in common use in India and abroad. It is possible to construct relatively thin bituminous pavement layers over an existing pavement. Therefore, these are commonly adopted as wearing course. Flexible pavement could be strengthened in stages by constructing bituminous pavement layers one after another in a certain period of time unlike the cement concrete pavement construction.
  • 5. 1.2 Construction Techniques Of Bituminous Construction The following construction techniques are in use:- Interface treatments like prime coat and tack coat. Surface dressing and Seal coat.
  • 6. Interface treatment Surface of the existing pavement layer is to be cleaned to remove dust and dirt and a thin layer of bituminous binder is to be sprayed before the construction of any type of bituminous layer over this surface. This treatment with bituminous material is called interface treatment which is necessary to provide the necessary bond between the old and the new layers. The interface treatment may either be a prime coat or tack coat and in some cases, the prime coat followed by a tack coat.
  • 7. PRIME COAT Bituminous prime coat is the first application of a low viscosity liquid bituminous material over an existing porous or absorbent pavement surface like the WBM base course. The main object of priming is to plug in the capillary voids of the porous surface and to bond the loose mineral particles on the existing surface, using a binder of low viscosity which can penetrate into the voids. The bituminous primer is sprayed uniformly using a mechanical sprayer at a rate of 7.3 to 14.6 kg/m2 area, depending on the porosity of the surface. The primed surface is allowed to cure for at least 24 hours, during which period no traffic is allowed.
  • 8. TACK COAT Bituminous tack coat is the application of bituminous material over an existing pavement surface which is relatively impervious like an existing bituminous surface or a cement concrete pavement or a pervious surface like WBM which has already been treated by a prime coat. Tack coat is usually applied by spraying bituminous material of higher viscosity like the hot bitumen at the rate of 4.9 to 9.8 kg/m2 area depending in the type of the surface.
  • 9. BITUMINOUS SURFACE DRESSING Bituminous Surfacing Dressing (BSD) is provided over an existing pavement to serve as thin wearing coat. The single coat surface dressing consists of a single application of bituminous binder material followed by spreading of aggregate cover and rolling. The principal of this method is illustrated in fig: When the surface dressing is similarly done in two layers, it is called ‘two coat bituminous surface dressing’. Where better adhesion is required, aggregates pre-coated with bituminous binder are used instead of conventional surface dressing and this technique is called ‘Bituminous Surface Dressing with Pre-coated Aggregates’. The main functions of BSD are:- • To serve as a thin wearing course of pavement and to protect the base course. • To water proof the pavement surface and to prevent infiltration of surface water. • To provide dust-free pavement surface in dry weather and mud-free pavement in wet weather.
  • 10. SEAL COAT The seal coat is a very thin surface treatment or a single coat surface dressing which is usually applied over an existing black top surface. A premixed sand bitumen (hot mix) seal coat is also commonly used over the premixed carpet .Seal coat is usually recommended as a top coat over certain bituminous pavements which are not impervious, such as open graded bituminous constructions like premixed carpet and grouted macadam. Seal coat is also provided over an existing bituminous pavement which is worn out. The main functions of seal coat are:  To seal the surfacing against the penetration of water.  To develop skid resistance texture.  To enliven an existing dry or weathered bituminous surface.
  • 12. INTRODUCTION The cement concrete pavement maintains a very high recognition among the engineer and the road users alike. Due to the excellent riding surface and pleasing appearance, the cement concrete roads are very much preferred. It is also a matter of fact that the life of cement concrete road is much more than any other type of construction. This is why the engineers have inherent confidence in the use of cement concrete for any kind of construction project.
  • 13. Construction procedure of concrete slab Preparation of subgrade and sub-base: The subgrade or sub-base for laying of the concrete slabs should comply with the following-  that no soft spots are present in the subgrade or sub-base. that the uniformly compacted subgrade or sub-base extends at least 30cm on either side of the width to be connected. that the subgrade is properly drained. that the minimum modules of subgrade reaction obtained with a plate bearing test is 5.54 kg/cm2.
  • 14. Placing of forms: The steel or wooden forms are used for this purpose . The steel forms are of M.S. channel section and their depth is equal to the thickness of the pavement. When set to grade , the maximum deviation of the top surface of any section from a straight line is not exceeded by 3mm. wooden forms are dressed on side ; these have minimum base width of thickness of 10 cm for slab thickness of 20 cm and minimum base width of 15 cm for slabs over 20 cm thick. They should not deviate more than 3 mm froma straight edge of 3 m in length.
  • 15. Batching andmixing : After determining the proportion of ingredients for the field mix, the fine aggregates and coarse aggregates are proportioned by weight in a weight-batching plant and placed into the hopper along with the necessary quantity of cement . The mixing of concrete is done in a batch mixer which will ensure a uniform distribution of the materials throughout the mass, so that the mix is uniformin color and is homogenous. The batch of cement, fine aggregate and coarse aggregate is led together into the mixer. The water for mixing in introduced into the drum within the first 15 seconds of mixing. The mixing of each batch is commenced within 1 and ½ minute after all the materials are placed in the mixer.
  • 16. Transporting and placing of concrete: The cement concrete is mixed in quantities required for immediate use and is deposited on the soil sub grade or sub-base to the required depth and width of the pavement section within the form work in continuous operation. Care is taken to see that no segregation of materials results while the concrete is being transported from the mixer to its placement. The spreading is done uniformly.
  • 17. Compaction and finishing: The surface of pavement is compacted either by means of a power-driven finishing machine or by a vibrating hand screed. For areas where the width of the slab is very small as at the corner of road junctions, etc., hand consolidation and finishing may be adopted.  Concrete as soon as placed, is struck off uniformly and screened to the crown and cross-section of the pavement to conformthe grade.  The tamper is placed on the side forms and is drawn ahead in combination with a series of lifts and drops to compact the concrete.
  • 18. CURING OF CEMENT CONCRETE The entire pavement surface of the newly laid cement concrete is cured in accordance with the following methods: INITIAL CURING: The surface of the pavement is entirely covered with burlap ,cotton or jute mates .prior or being placed, the mates thoroughly saturated with water and are placed with the wet side down to remain in intimate contact with the surface. FINAL CURING : The final curing is done with any one of the following methods: Curing with wet soil exposed edges of the slab are banked with a soil berm. A blanket of sandy soil free from stones is placed .The soil is thoroughly kept saturated with water for 14 days. IMPERVIOUS MEMBRAME METHOD: Use of an impervious membrane which does not impart a slippery surface to the payment is used. Liquid is applied under pressure with a spray nozzle to cover the entire surface with a uniform film. It hardens with 30 minutes after its application. The liquid is applied immediately after the surface finishing.
  • 19. 3. EQUIPMENTS USED FOR ROAD CONSTRUCTION
  • 20. The Crawler Tractor A construction vehicle that moves on tracks instead of wheels. The tracks spread the vehicle’s weight over a larger surface area, enabling the tractor to exert a lower force per unit area on the ground. This allows the tractor to safely traverse over moister ground.. When a dozer blade is attached to the front of the crawler tractor it is commonly known as a "bulldozer". With a loader attachment, it becomes a crawler loader.
  • 21. The Hydraulic Excavator The hydraulic excavator is most commonly used for digging rocks and soil, but with its many attachments it can also be used for cutting steel, The hydraulic excavator are used for breaking concrete, drilling holes in the earth, laying gravel onto the road prior to paving, crushing rocks, steel, and concrete, and even mowing landscapes. Hydraulic excavators have an operating weight of 20,000 pounds (9,072 kg) or higher.
  • 22. Motor Scraper Motor scrapers, also known as self-propelled scrapers, are large motorized machines used for digging, hauling and leveling out materials in a variety of construction jobs. Running on massive rubber tires, these machines quickly move large quantities of earth around a construction site.
  • 23. The Wheel Loader The wheel loader, also known as a front end loader or bucket loader, is one of the most widely used machines in construction today and is noted for its extreme versatility and payload capacity to perform multiple tasks at a low cost. Wheel loaders are primarily used in construction applications such as material handling, digging, load-and-carry, road building, and site preparation. Some models even come in waste handling versions.
  • 24. The Motor Grader A motor grader, known as patrol, or maintainer, is a piece of heavy machinery used to create a smooth, wide, flat surface. Traditionally, the grader is used for road maintenance its main function is to flatten surfaces before the application of asphalt. Presently, these machines are also commonly used for fine grading, spreading, and earthmoving. They can be used for clearing debris and brush, as well as for snow removal. A variety of attachments convert the motor grader into a more versatile machine, enabling the machine to do things such as dig shallow holes.
  • 25. The Rollers Rollers are used to compact loose foundation, such as soil , gravel, asphalt, and bituminous materials and are primarily used for construction or agriculture appl ications. The rolling process ensures that foundations are compacted thoroughly so the materials are solid and do not come loose.
  • 26. The Compactors Compactors are machines frequently used to compact materials such as soil in order to increase its density for construction. In addition, compactors are utilized in landfill tasks. Common varieties are plate tampers (also known as rammers), vibratory plates, compactors (also known as tamping foot rollers), and vibratory pad foot compactors.
  • 27. Asphalt Road Paver A paver is an engineering vehicle used to lay asphalt on roadways. It is normally fed by a dump truck. A separate machine, a roller, is then used to press the hot asphalt mix, resulting a smooth, even surface. The sub-base being prepared by use of a grader to trim crushed stone to profile after rolling
  • 29. 4.1 Introduction Hilly regions have steep topography, difficult and hazardous terrain, high altitude areas and extreme climatic conditions. Planning, alignment, design, construction and maintenance of roads in hilly terrain are quite different and pose difficult problems in comparison to those for roads in plain terrain. Roads passing through such hilly terrain and leading to towns and villages located on hills are called ‘hill roads’.
  • 30. 4.2 Features of hilly roads As far as possible the hill road should be aligned along the stable side of the hill slope in order to prevent future land-slides and related problems after the construction of the hill road. In order to limit the gradient, the length of the hill road is increased by planning zigzag alignment of the road. An effective surface and sub-surface drainage system is to be planned, designed and constructed in order to keep the road stretches safe without getting washed out during heavy rains. Also a large number of cross drainage structures such as culverts and bridges are required to enable the streams and rivers to cross the road, without causing damages to the hill road.
  • 31. Prepared and presented by- } } }  KENEDDY NARZARY(CIT/11/CT/013)  RAJU BRAMHA (CIT/12/CT/020)  PURNA ABHILASH MALLICK (CIT/12/CT/003)  MURARI KUMAR (CIT/12/CT/013)  ROSEY BARO (CIT/12/CT/017)  JEWMA DAIMARY (CIT/12/CT/024) BLACK TOP CONCRETE PAVEMENT EQUIPMENTS USED FOR ROAD CONSTRUCTION }  SHIVAM CHOUDHARY (CIT/12/CT/ET/029)  DEBRAJ DAS (CIT/12/CT/010) HILLY ROADS