PRIMA RESIDENCES <br />243 QUEZON AVENUE, Q.C <br />August 23,2011<br />PRESENTATION OF <br />SCAFFOLDING, PLATFORM & <br ...
CHB 1.2 METER  HEIGHT<br />CHB 1.2M  HEIGHT<br />SCAFFOLDING<br />W/ SAFETY <br />CATCH FAN<br />
PRESENTATION OF SCAFFOLDING & PLATFORM<br />CHB 1.2 METER  HEIGHT<br />SCAFFOLDING<br />W/ SAFETY CATCH FAN<br />SAFETY NE...
PRESENTATION OF SCAFFOLDING & PLATFORM<br />ANGLE BAR<br />30X30X5mm. THK.<br />CATWALK<br />SAFETY NET <br />ANGLE BAR<br...
PRESENTATION OF SCAFFOLDING & PLATFORM<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5mm. THK.<b...
PRESENTATION OF SCAFFOLDING & PLATFORM<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5mm. THK.<b...
DETAILED OF SCAFFOLDING, PLATFORM &  PERSPECTIVE<br />
DETAILED OF SCAFFOLDING, PLATFORM &  PERSPECTIVE<br />
DETAILED OF SCAFFOLDING, PLATFORM &  PERSPECTIVE<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5...
NOV. - DEC.<br />2011<br />3rd FLR.-4th FLR- <br />3 STRONG FLOORS<br />
NOV. - DEC.<br />2011<br />2th FLR- <br />MEPF WORKS<br />
JAN. – FEB.<br />2012<br />2ndFLR.-3rdFLR- <br />INTERIOR PARTITIONING<br />
JAN. – FEB.<br />2012<br />5th  FLR.-7thFLR- <br />3 STRONG FLOORS<br />
JAN. – FEB.<br />2012<br />5th  FLR.-7thFLR- <br />3 STRONG FLOORS, w/ SCAFFOLDING<br />
JAN. – FEB.<br />2012<br />6th  FLR.-8thFLR- <br />3 STRONG FLOORS<br />
JAN. – FEB.<br />2012<br />7th  FLR.-9thFLR- <br />3 STRONG FLOORS<br />
FEB. – MAR.<br />2012<br />8th  FLR.-10thFLR- <br />3 STRONG FLOORS<br />
MAR.<br />2012<br />9th  FLR.-11thFLR- <br />3 STRONG FLOORS<br />
MAR.<br />2012<br />10th  FLR.-12thFLR- <br />3 STRONG FLOORS<br />
MAR. – APR.<br />2012<br />11th  FLR.-12thFLR- <br />2 STRONG FLOORS<br />
APR.<br />2012<br />ROOF DECK<br />MEPF WORKS<br />PREPARED BY:<br />IRWIN O. GERMAN<br />
MASONRY WORKS – EXTERIOR WALLS<br />
Upcoming SlideShare
Loading in...5
×

PRESENTATION OF SCAFFOLDING

2,812

Published on

PRESENTATION OF
SCAFFOLDING, PLATFORM &
MASONRY WORKS

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,812
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
126
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "PRESENTATION OF SCAFFOLDING"

  1. 1. PRIMA RESIDENCES <br />243 QUEZON AVENUE, Q.C <br />August 23,2011<br />PRESENTATION OF <br />SCAFFOLDING, PLATFORM & <br />MASONRY WORKS<br />FIRST BALFOUR INC.<br />
  2. 2. CHB 1.2 METER HEIGHT<br />CHB 1.2M HEIGHT<br />SCAFFOLDING<br />W/ SAFETY <br />CATCH FAN<br />
  3. 3. PRESENTATION OF SCAFFOLDING & PLATFORM<br />CHB 1.2 METER HEIGHT<br />SCAFFOLDING<br />W/ SAFETY CATCH FAN<br />SAFETY NET <br />
  4. 4. PRESENTATION OF SCAFFOLDING & PLATFORM<br />ANGLE BAR<br />30X30X5mm. THK.<br />CATWALK<br />SAFETY NET <br />ANGLE BAR<br />50X50X5mm. THK.<br />TOE BOARD<br />
  5. 5. PRESENTATION OF SCAFFOLDING & PLATFORM<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5mm. THK.<br />
  6. 6. PRESENTATION OF SCAFFOLDING & PLATFORM<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5mm. THK.<br />PREPARED BY: IRWIN O. GERMAN<br />
  7. 7. DETAILED OF SCAFFOLDING, PLATFORM & PERSPECTIVE<br />
  8. 8. DETAILED OF SCAFFOLDING, PLATFORM & PERSPECTIVE<br />
  9. 9. DETAILED OF SCAFFOLDING, PLATFORM & PERSPECTIVE<br />ROUND BAR<br />50 DIA. MM<br />TOE BOARD<br />ANGLE BAR<br />30X30X5mm. THK.<br />
  10. 10. NOV. - DEC.<br />2011<br />3rd FLR.-4th FLR- <br />3 STRONG FLOORS<br />
  11. 11. NOV. - DEC.<br />2011<br />2th FLR- <br />MEPF WORKS<br />
  12. 12. JAN. – FEB.<br />2012<br />2ndFLR.-3rdFLR- <br />INTERIOR PARTITIONING<br />
  13. 13. JAN. – FEB.<br />2012<br />5th FLR.-7thFLR- <br />3 STRONG FLOORS<br />
  14. 14. JAN. – FEB.<br />2012<br />5th FLR.-7thFLR- <br />3 STRONG FLOORS, w/ SCAFFOLDING<br />
  15. 15. JAN. – FEB.<br />2012<br />6th FLR.-8thFLR- <br />3 STRONG FLOORS<br />
  16. 16. JAN. – FEB.<br />2012<br />7th FLR.-9thFLR- <br />3 STRONG FLOORS<br />
  17. 17. FEB. – MAR.<br />2012<br />8th FLR.-10thFLR- <br />3 STRONG FLOORS<br />
  18. 18. MAR.<br />2012<br />9th FLR.-11thFLR- <br />3 STRONG FLOORS<br />
  19. 19. MAR.<br />2012<br />10th FLR.-12thFLR- <br />3 STRONG FLOORS<br />
  20. 20. MAR. – APR.<br />2012<br />11th FLR.-12thFLR- <br />2 STRONG FLOORS<br />
  21. 21. APR.<br />2012<br />ROOF DECK<br />MEPF WORKS<br />PREPARED BY:<br />IRWIN O. GERMAN<br />
  22. 22. MASONRY WORKS – EXTERIOR WALLS<br />