Moe mop tpm connections

744
-1

Published on

Measures of Effectiveness, Measures of Performance, Key Performance Parameters, and Technical Performance Measures.

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
744
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
18
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Moe mop tpm connections

  1. 1. CPM‐500 EVM/SE/TPM Integration Dependencies Between Measures Stakeholders Define Needs and Capabilities Suppliers Define Physical Solutions KPP Mission  Need MoE MoP TPM “Operational  measures of  success related to  the  achievement  of the mission or  operational  objective being  evaluated. Measures that  characterize  p y physical or  functional  attributes relating  to the system  operation Measures used to  assess design  p g progress,  , compliance to  performance  requirements,  and  technical risks “Coming to Grips with Measures of Effectiveness,” N. Sproles,  Rights Reserved Systems Engineering, Volume 3, Number 1, pp. 50‐58 21/58
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×