Integrated Master Plan / Integrated Master Schedule (IMP/IMS)

  • 352 views
Uploaded on

The Integrated Master Plan and Integrated Master Schedule describe the increasing maturity of project deliverables using Measures of Effectiveness, Measures of Performance, Key Performance Parameters, …

The Integrated Master Plan and Integrated Master Schedule describe the increasing maturity of project deliverables using Measures of Effectiveness, Measures of Performance, Key Performance Parameters, and Technical Performance Measures.

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
352
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
14
Comments
0
Likes
2

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. 1 The  structure  of  a  Performance-­‐Based  Plan   !  Each  Event  or  Milestone  represents  the  availability  of  one  or  more  capabili>es.     !  The  presence  of  these  capabili>es  is  measured  by  the  Accomplishments  and  their  Criteria.   !  Accomplishments  are  the  pre–condi>ons  for  the  maturity  assessment  of  the  product  or  service  at   each  Event  or  Milestone     !  Performance  of  the  work  ac>vi>es,  Work  Packages,  Criteria,  Accomplishments,  and  Events  or   Milestones  is  measured  in  units  of  “physical  percent  complete”   Program Events Define the availability of a Capability at a point in time. Accomplishments Represent requirements that enable Capabilities. Criteria Represent Work Packages that deliver the Requirements. Work   Package   Work   Package   Work   Package   Work   Package   Work   Package   Work   Package   Work   package   Chapter I The Integration of Planning and Scheduling