Estimating project activities credibility scale. Past performance is best. The least desirable is personal opinion.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,079
On SlideShare
0
From Embeds
0
Number of Embeds
17
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

BoE methods

  1. 1. Estimating Technique Risk Level Historical Data/Vendor Quotes/Catalog Costs Very Low Comparative Analysis Low to Medium Level of Effort Medium Parametric Estimates/Cost Modeling Medium to High Engineering Estimates High

×