Your SlideShare is downloading. ×
Taller producción 1 2 2012 grupo 2
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Taller producción 1 2 2012 grupo 2

1,443

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,443
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
18
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Taller Producción 1 Grupos de 4 personas
  • 2. Se cuenta con la siguiente información del Pozo: Programa de Revestidores: Arenas a Producir: Superficial: (13 3/8’’ hasta 400’) ZZ1 (7568’ – 7575’) Presión Fondo: 1500 lpc, Temp Fondo : 180 º F Intermedio: (7’’ de 0’ a 8000’) AZ2 (8918’ – 8923’) Presión Fondo: 1800 lpc, Temp Fondo : 290 º F Liner de Producción :( 5 1/2 de 7950 a 8950) Para llevar a cabo el completamiento en el pozo, se disponen de los siguientes equipos:Lista de equipos longitud cantidad Id od Rosca Temp º FCamisas 2 3/8 4 2 1,875 2,375 2 3/8" EUE 250Camisas 2 3/8 Premium 3,5 2 1,875 2,375 2 3/8" EUE 330Empacador Hidraulico 7 x 2 3/8 4 2 1,991 7 2 3/8" EUE 250Empacador Hidraulico 7 x 2 3/8 Premium 4,5 2 1,991 7 2 3/8" EUE 330Niple X 2,5 1 1,995 2,55 2 3/8" EUE 330Empacador Permanente 5 1/2 x 3 3,5 2 3 5,5 250Empacador Permanente 5 1/2 x 3 Premium 3 2 3 5,5 330Localizador tipo no - go premium 1 1 1,993 3,54 2 3/8 EUE Box 3 Stub Acme Pin 330Localizador tipo no - go 1 1 1,993 3,56 2 3/8 EUE Box 3 Stub Acme Pin 250Tuberia 2 3/8 EUE 31 320 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 2,5 4 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 6,5 4 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 4 5 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 3 5 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 7 3 1,995 2,375 2 3/8" EUE 250Niple de Ajuste 2 4 1,995 2,375 2 3/8" EUE 250Unidades de Sello 3 1,5 3 2,801 3 3 Stub Acme 250Unidades de Sello 3 Premium 1,3 3 2,803 3 3 Stub Acme 330Pata de Mula 1 1 2,803 3 3 Stub Acme 330 Se pide: Realizar el diagrama mecánico del pozo, y nombrar el completamiento

×