• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Phase Construction Inspection
 

Phase Construction Inspection

on

  • 839 views

Home inspection information regarding the building process

Home inspection information regarding the building process
Sacramento, California home inspection information from
Full Circle Home Inspections
www.fullcirclehomeinspections.com

Statistics

Views

Total Views
839
Views on SlideShare
838
Embed Views
1

Actions

Likes
0
Downloads
6
Comments
0

1 Embed 1

http://www.slideshare.net 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Phase Construction Inspection Phase Construction Inspection Presentation Transcript

    • F u l l C i r c l e H o m e 10-Stage Construction I n s p Process e c t i o n s
    • F u l l C Stage 0 i r c l e H o • Home is released to the m field e I • Perimeter foundation n s forms are placed p e • Underground plumbing c t i pipes are placed o n • Earth under home is s treated for termites • Reinforcing steel is placed for foundation • Slab is ready to be poured
    • F u l l C Stage 1 - Slab i r c l e H • The slab is poured o m • Reinforcing steel ties the e block walls to the slab – I n every four feet s p • Control joints are cut into e c slab to help control t i o cracking n s • Slab is typically 4 inches thick and footers are anywhere from 12 to 18 inches thick
    • F u l l C Stage 1 - Block i r c l e H o • Block is erected m e • Beam is poured with I n concrete to tie in all s p e block c t i o • Tie down straps are n s placed in the beams to hold trusses
    • F u l l C Stage 1 - Roof i r c l e H o • Trusses are erected m and metal strapping e I secures the trusses n s p from uplift pressures e c t • Plywood is placed on i o n trusses s • Trusses are reinforced from the inside with lateral bracing
    • F u l l C Stage 1 - Quality Construction i r c l e H o m e I n s p e c t i o n s
    • F u l l C Stage 1 - Quality Construction i r c l e H o m e I n s p e c t i o n s
    • F u l l C Stage 1 - Quality Construction i r c l e H o m e I n s p e c t i o n s
    • F u l l C Stage 2 – Interior Framing i r c l e H o • At a stage 2 the m e interior framing I n begins s p e • Typically, WCI uses c t i metal studs to ensure o n s high-quality, straight walls
    • F u l l C Stage 2 - Windows i r c l e H o • Windows are installed m e with screws that sink I n into the block wall s p e • To seal the windows, c t i a urethane sealant is o n s applied between window and block
    • F u l l C Stage 2 i r c l e H o • The home’s roof m e structure is complete I n • All the hurricane s p e strapping is in place c t i o • The interior framing n s has begun • Windows and doors are placed in the home
    • F u l l C Stage 3 i r c l e H • The electrical wiring is o m placed in the walls e I • The plumbing is placed n s in the walls p e c • The HVAC system ducts t i o are placed in the attic n s – Typically, construction managers call these “rough- ins” • All the windows and doors are in the home – Depending on the hurricane wind zone, impact glass or shutters are used
    • F u l l C Stage 4 - Inside i r c l e H o • At this crucial stage, m the home passes e I the framing n s p inspection e c t • The electric, i o n plumbing, and s HVAC rough-ins are complete • The home is ready for the insulation and drywall
    • F u l l C Stage 4 - Outside i r c l e H o • Finish is applied to m e the exterior walls I n • Roof is hot mopped s p e (completely c t i waterproof) o n s • Roof tile is placed on the roof
    • F u l l C Stage 5 - Inside i r c l e H o • All the drywall is m e complete I n • The drywall has s p e been textured c t i o • The home is n s clean
    • F u l l C Stage 5 - Outside i r c l e H o • The roof tile is m e complete I n • The exterior painting s p e process begins c t i o • The driveway and n s walkways are placed
    • F u l l C Stage 6 i r c l e H o • The interior trim is placed m • The cabinets are being e installed I n • The garage door is installed s p – Hurricane codes require that e c the garage doors withstand t wind speeds from 110 to 160 i o mph – depending on your n s wind zone • The floor tile is installed • The hurricane shutters are installed and inspected
    • F u l l C Stage 7 – Garage Doors i r c l e H o • The garage doors are m e installed after the I n home is painted s p e • The horizontal c t i bracing is specifically o n s designed to reduce the impact of hurricane-force winds
    • F u l l C Stage 7 - Inside i r c l e H o • All the counter tops m are installed e I n • Interior paint is s p complete e c t • Floor tile is complete i o n • Bathroom wall tile is s complete • The electrical, HVAC, and plumbing trim out begins
    • F u l l C Stage 7 - Outside i r c l e H o • Exterior paint is m e complete I n • The exterior is s p e graded and is c t i prepared for o n s landscaping
    • F u l l C Stage 8 - Inside i r c l e H o • The plumbing trim is m e complete I n • The electrical trim is s p e complete c t i o • The HVAC system n s and trim is complete • Minor cosmetic items are corrected
    • F u l l C Stage 8 - Outside i r c l e H o • Landscaping is m e complete I n • Exterior paint is s p e touched up c t i o • Cleaning process n s begins
    • F u l l C Stage 9 i r c l e H o • Appliances are installed m • Carpet is installed e I • The home has power n s p • The final building e c inspection has been t i o performed n s • The home is cleaned • The home is ready for the customer • The homeowner orientation is performed
    • F u l l C Stage 10 i r c l e H o • The home is m e complete I n • This means all s p e items on the c t i customers o n s orientation list are completed and the home is under warranty