2007-2009 - SHORT AND ASSOCIATES, LONDON, UK   ST. JAMES’S CHURCH, PICCADILLY, LONDON – section and elevations for plannin...
2007-2009 - SHORT AND ASSOCIATES, LONDON, UK   62&63 PALL MALL, LONDON – section and elevations for planning application r...
2007-2009 - SHORT AND ASSOCIATES, LONDON, UK   DEPARTMENT OF HEALTH – research project for low energy medical buildings


...
2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA   CENTRO CONGRESSI ITALIA - EUR – Tender drawings




                 ...
2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA   CENTRO CONGRESSI ITALIA – EUR progetto esecutivo




                ...
2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA   CENTRO CONGRESSI ITALIA – EUR progetto esecutivo




                ...
2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG.   SCIENCE & ART’S MUSEUM - RETIRO – 5th year project
2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG.   SCIENCE & ART’S MUSEUM - RETIRO – 5th year project
Upcoming SlideShare
Loading in...5
×

Portfolio

460

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
460
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Portfolio"

  1. 1. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK ST. JAMES’S CHURCH, PICCADILLY, LONDON – section and elevations for planning application report 17 . 47 17 . 41 17 . 37 17 . 33 17 . 52 17 . 25 17 . 27 17 . 20 Elevation from Piccadilly • £8.5 million and 2,700 sq. m. of re-development for St. James’s Church. • Consists of two separate buildings adjacent to the A B C D E Grade 1 listed building by Sir Christopher Wren. • Includes space for office, 16 retail, community/parish use, 01 cafe and accommodation. • Incorporates natural ventila- tion and passive cooling inside the London heat island. 36 • Assisted in the design and 18 preparation of plans for 1 planning application. A B C E • Attended meetings with client and Westminster planners. Elevation from churchyard North-south section
  2. 2. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK 62&63 PALL MALL, LONDON – section and elevations for planning application report PALL MALL SW1 North - South Section Pall Mall Elevation • £10.2 million and 2070 square meters of office building on Pall Mall • Situated in a historical context, across form St. James’s Palace, adjacent to a Grade 2 listed building by architect Norman Shaw. • New building to replace two existing ones, 62 & 63 Pall Mall. • Façade of 62 is retained while 63 Pall Mall is rebuilt. New rear façade to Georgian style listed Pickering Place. • Have been granted planning consent. • Assisted in the design, attended meetings with client, consultants and planners. Perspective view from Pickering Place Elevation to Pickering Pl.
  3. 3. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK DEPARTMENT OF HEALTH – research project for low energy medical buildings Perpectivated section A • Research project funded by the 1 2 31 2 31 231 231 231 2 1 A Department of Health Estates and Facilities Division Research and 231 Open Courtyard 3 Development Fund 3 3 3 • Investigates design strategies for low energy ventilation and 3 3 3 cooling of health buildings 2 2 2 • Formed and led an 2 2 2 interdisciplinary panel of 1 1 1 architects, doctors and engineers A for this purpose. 1 1 1 A • Attended panel meetings and assited in preparation of the report presented to the NHS. Section through thick wall in courtyard Ground floor and air labirynth plans
  4. 4. 2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA - EUR – Tender drawings Piazza del Monte di Pietà 30 85 rue du Temple 00186 Roma F 75003 Paris Tel 39 06 6880 7871 Tel 33 1 446 18383 Fax 39 06 6880 7872 Fax 33 1 446 18389 Fuksasitalia@fuksas.it m.fuksas@fuksas.fr Consulente Progettazione Strutturale: Project & Construction Management: Studio Ing. Massimo Majowiecki Drees & Sommer AG Via Tizziano 46/2 Via Piave, 66 40033 Casalecchio di Reno - BO 00187 Roma Studio Ing. Gilberto Sarti Validatore: Via Circoncallazione Meridionale 54, Italsocotec S.p.A. 47900 Rimini Pzza. Stia, 8 - 00138 Roma Consulente Progettazione Impianti ed Antincendio: Committente: AI Engineering Eur S.p.A. Via Lamarmora 80 Via Ciro il Grande, 16 10128 Torino - Italy 00144 Roma
  5. 5. 2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA – EUR progetto esecutivo Livello N-0 pianta +32,15
  6. 6. 2006-2007 – MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA – EUR progetto esecutivo Longitudinal section • €300 million Congress Center project in Rome with a capacity for 10.000 people and 55.000 square meters. • Assisted in the preparation of detailed drawings for tender and construction stages through to project delivery, building is currently under construction. • Involved in the approval of urban, fire and accessibility plans by the city authorities • Assisted in building the model. Cross section
  7. 7. 2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG. SCIENCE & ART’S MUSEUM - RETIRO – 5th year project
  8. 8. 2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG. SCIENCE & ART’S MUSEUM - RETIRO – 5th year project
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×