Your SlideShare is downloading. ×
Proyectos
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Proyectos

169

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
169
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Can Colomer, Cable Stayed Bridge(Terrassa, Spain, 2007) – DOPEC SL Fernando Sima Ph.D. Structural Engineer
  • 2. Margaret Hunt Hill Bridge (Dallas, USA 2007-2010) Santiago Calatrava LLC Fernando Sima Ph.D. Structural Engineer
  • 3. World Trade Center Transportation Hub (New York, USA 2007-2010) Santiago Calatrava LLC Fernando Sima Ph.D. Structural Engineer
  • 4. WTC Transportation Hub Path Hall Fernando Sima Ph.D. Structural Engineer
  • 5. WTC Transportation Hub 1 Line Box Fernando Sima Ph.D. Structural Engineer
  • 6. WTC Transportation Hub Transit hall (Oculus) Fernando Sima Ph.D. Structural Engineer
  • 7. Five footbridges over IB Road (Uruguay, 2011) Fernando Sima Ph.D. Structural Engineer
  • 8. Fernando SimaPh.D. Structural Engineer

×